-
Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
Mount Allalone. Progress and annual reports for the period 14/6/89 to 31/7/95.
Base metal exploration of two lead-zinc mineralized areas previously discovered by Billiton and WMC within Hutchison Group metasediments near Mt Allalone, northwest of Buckleboo on central Eyre Peninsula, comprised ground magnetic and EM surveys, RAB...-
Document
Published: 02 Nov 1995
-
RB 86/00045 Review of gold tailings in South Australia.
Stockpiles of tailings from abandoned gold mines are small and probably do not warrant retreatment individually. Total of 71 000 tonnes of tailings are at Government Battery sites at Mount Torrens, Peterborough, Glenloth, Tarcoola and Mongolata. The...-
Document
Published: 01 Aug 1986
-
RB 90/00078 South Australia - Exploration Towards 2000. Seminar, Adelaide, 13 December, 1990. Extended abstracts.
A seminar designed to heighten industry interest in South Australia as a place in which to search for minerals and petroleum was organised by the Department of Mines and Energy at the Australian Mineral Foundation on 13 December 1990. A number of data...-
Document
Published: 01 Dec 1990
-
RB 91/00086 Mineral occurrences of the YARDEA 1:250 000 map sheet area.
There is no abstract created for this record-
Document
Published: 01 Sep 1991
-
RB 88/00061 Review of lead-zinc mineralization in South Australia - Gawler Craton.
4 main styles of mineralization have been identified and the following areas worthy of further investigation are outlined : . Broken Hill style : associated with banded iron formation (BIF) and schist of the Early Proterozoic Hutchison Group on...-
Document
Published: 01 Aug 1988
-
RB 91/00037 Lincoln Dale, Kyimba and Bunora drilling traverses, southwest of Kimba - Well completion report.
Fifteen rotary holes, 13 with bottom-hole core, tested 3 aeromagnetic anomalies for the presence of Hutchison Group, which is prospective for lead-zinc-silver. Low grade meta-sediments and possible acid volcanics of the Hutchison Group were...-
Document
Published: 01 Mar 1991
-
RB 91/00084 Mineral occurrences of the KINGOONYA 1:250 000 map sheet area.
There is no abstract created for this record-
Document
Published: 01 Sep 1991
-
RB 91/00085 Mineral occurrences of the KIMBA 1:250 000 map sheet area.
There is no abstract created for this record-
Document
Published: 01 Sep 1991
-
Review of Mineral exploration activity, 2003 and 2004.
2003 activity: Expenditure by companies on mineral exploration licences in South Australia for calendar year 2003 was $37.0 million, a slight increase on the $35.7 million spent in 2002. Mineral exploration drilling metreage, a key indicator of...-
Document
-
Screech-Owl Creek (part of Lake Torrens Project). Final report at licence surrender for the period 14/6/2000 to 20/4/2006.
Possible economic Neoproterozoic stratiform / hydrothermal copper mineralisation hidden under Mesozoic and Recent sedimentary cover was targeted in an area located approximately 95 km north-east of Andamooka. Aeromagnetic data interpretation of some...-
Document
-
Mount Ive. Annual and final reports to licence expiry/full surrender for the period 17/7/2006 to 16/7/2008.
Exploration for possible IOCG drilling targets within an area located 100 km north-northeast of Kyancutta, that abuts the southern shoreline of Lake Gairdner, initially involved planning for a regional gravity survey to be acquired across three of...-
Document
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
Mount Olinthus. Annual report to licence expiry/renewal, for the period 6/3/1995 to 5/3/1996.
Base metal mineralisation, indicated by newly discovered shafts at the historic Atkinson Pb-Ag-Cu-Zn mine, was the impetus for exploration in the upland area 20 km north-west from Cowell. Grab samples collected from shafts, stockpiles and dumps varied...-
Document
-
Maitland. First partial surrender report, for the period 25/8/2008 to 24/8/2015.
58 square km of the Area C southernmost sub-block of EL 5320 have been relinquished to compensate for a shortfall in exploration spending against commitments. During the past seven years, the only work performed on the relinquished ground was the...-
Document
Published: 20 Mar 1916
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914