-
RB 84/00084 Kongorong groundwater pollution investigation.
An SA government investigation has been undertaken to determine the extent of groundwater pollution resulting from the waste disposal practices used at the now abandoned Kongorong cheese factory. During the period 1924 to 1971, liquid effluent from...-
Document
Published: 01 Oct 1984
-
RB 92/00045 Upper South-East dryland salinity and flood management plan. Excavation characteristics and slope design for the drainage channels.
The Upper South-East Dryland Salinity and Flood Management Plan proposals aim to address the worsening salinisation problems now clearly visible in the area. This report provides feasibility and preliminary project design data to the EWS engineers who...-
Document
Published: 01 Sep 1992
-
Data release [made at SA Director of Mines' discretion] : Mount Gambier. Final geological report on drilling.
There is no abstract created for this record-
Document
Published: 09 Aug 1999
-
Sawpit 1. Test reports.
Contains a report on seismic modelling of the Pretty Hill Sandstone section in the well,and a regional petrological review of this formation centering on Sawpit 1 data, plus some brief faxed comments regarding the well palynology.-
Document
-
1990 seismic survey, Hatherleigh, final report.
AIM; The 1990 Hatherleigh Seismic Survey was programmed to obtain modern detailed and regional infill Vibroseis coverage of the Rivoli Trough. The major objective for licence Year 1 was to provide a detailed 1 km grid of dip lines across the...-
Document
-
1994 East Avenue Seismic Survey. Reports for the period February to September 1994.
AIM: To evaluate a weak lead in the south-western Penola Trough, identified on seismic line RM80.08 as a potentially drillable roll-over anticline, prior to making a decision on whether to renew PEL 39 for a second term. METHODS: Survey dates: 21/4...-
Document
-
1992 Beachport Seismic Survey. Reports for the period February to June 1992.
AIM: To acquire further detailed reflection seismic coverage of the south-west of the licence area to resolve doubts about the currently mapped closures on the following structures: (i) The Woakwine Prospect, a tilted fault block near the intersection...-
Document
-
1991 Saint Clair Detail Seismic Survey. Reports for the period 2/1/91 to December 1991.
AIM: To add detail to several leads identified by the 1990 Saint Clair Seismic Survey, and to provide further regional coverage, particularly in the north-western part of the licence area. The proposed programme of dip and strike lines will address...-
Document
-
1992 seismic survey, Biscuit Flat, final report.
AIM: The Biscuit Flat Seismic Survey was designed to provide detailed infill coverage over the Rendelsham and Biscuit Flat strong leads in order to mature both for drilling, the objective then being to select a drilling location on one of these two...-
Document
-
1993 seismic survey, Mount Elephant, final report.
AIM: The Mount Elephant Seismic Survey was designed to provide additional detailed coverage over a lead in the area around the small township of Rendelsham. Previous seismic data quality across the Woakwine Range in this area had always been poor, so...-
Document
-
Stansbury Basin, South Australia. Bitumen strandings on Kangaroo Island beaches. Field survey report.
Field examination of common asphaltite occurrences on Kangaroo Island beaches has concluded that they are relatively recent strandings of unknown origin and age. Their presumed sea floor mode of transport indicates a likely nearby source within the...-
Document
-
1996 East Avenue Detail Seismic Survey. Reports for the period 31/1/96 to 22/5/97.
AIM: To mature the recently defined East Avenue strong lead into a drillable prospect. METHODS: Survey dates: 14/3 - 17/3/96. Energy source: Vibroseis. CDP coverage: 17 500%. Recording mode: 350 channel digital - GEOCOR IV recorder. VP...-
Document
Published: 22 May 1997
-
1991 seismic survey, Mount Hope, final report.
AIM: The Mount Hope Seismic Survey main objective was to obtain additional detail of, and mature for drilling in 1992, two leads confirmed by the 1990 Hatherleigh Seismic Survey. The Mount Hope lead on the SE flank of the Beachport High required more...-
Document
-
Wanda Prospect seismic interpretation report, PEL 62, South Australia.
Interpretation of reflection seismic data for the Wanda Prospect area of PEL 62, which work has especially addressed the seismic data reprocessed in 1996, was performed in order to select a drilling location for the licence Year 2 commitment well...-
Document
-
1990 Saint Clair Seismic Survey. Reports for the period 16/11/89 to October 1990.
AIM: To provide a regional grid of reflection seismic data over the Saint Clair Trough, and to mature several leads on the southern flank of the trough, including the Woakwine feature identified earlier. Most of the area to be covered by the 1990...-
Document
-
Feldspars in the Pretty Hill Sandstone, Ladbroke Grove and Katnook Fields.
Thin sections from the Pretty Hill Sandstone in 5 Otway Basin wells located on or near gas pools in this formation were examined petrologically and point counted for mineralogical identification of the proportion of feldspar present. A staining...-
Document
-
1988 seismic survey, Gambier, final report.
AIM: The 1988 Gambier Seismic Survey of semi-detailed and regional data acquisition was shot principally to upgrade the prominent Glenburnie lead in the northeast of PEL 28 into a drillable prospect. This lead, identified 1n 1986 by the Burrungule...-
Document
-
Interpretation of aeromagnetic survey data, PEL 62, Otway Basin. Report.
20,300 line km of 400 m flight traverse spaced regional aeromagnetic data (with an 80 m mean terrain clearance) was processed, analysed and interpreted by specialist geophysical consultants using new, automated computing methods, to detect regional...-
Document
-
1997 Stockdale Seismic Survey. Reports for the period February 1997 to May 1998.
AIM: To further delineate the Stockdale lead, the Churinga Prospect, the Sugarloaf Prospect and several small fault bounded leads along the southern side of the central uplift zone of the onshore Robe Trough, with the expectation of then being able to...-
Document
-
1996 Long Island Seismic Survey. Reports for the period 19/12/95 to June 1997.
AIM: To derive a clearer understanding of the morphology and structural style of the Robe Trough and its margins, and to detail structural leads identified within the central part of the trough, where a number of possible fault-bounded closures had...-
Document