-
Saw Mill. Progress and final reports for the period 22/2/1973 to 22/2/1974.
Investigations included drilling in the eastern part of EL 41, costeaning and close space drilling near Nob Well and Apollonaris anomaly, water well sampling, and ground search for carnotite.-
Document
Published: 01 Jan 1974
-
Kalabity. First annual report for the period 22/7/1968 to 21/7/1969.
Exploration for possible economic primary and secondary uranium deposits, within an area extending for 50 miles north-westwards from Cockburn and Mingary, has consisted of the first-time (for this locality) acquisition by the licence operator of an...-
Document
-
Gulnare. Combined first annual / final report at licence expiry/full surrender for the period 23/1/2008 to 22/1/2009.
Exploration for possible Neoproterozoic sediment-hosted, unconformity related buried uranium deposits within a synclinally-exposed area of reduced Warrina Supergroup siliclastic rocks, 160 km north of Adelaide, followed a concept that such deposits...-
Document
Published: 02 Dec 1908
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-33 - north-eastern Gawler Craton - Douglas Creek gravity anomaly Mesoproterozoic basement IOCG mineral prospect. Project interim and final reports.
The north-eastern margin of the Gawler Craton is prospective for Mesoproterozoic iron oxide - associated copper-gold (IOCG) style mineralisation, but the considerable depth to crystalline basement, combined with the presence of an artesian Mesozoic...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Arkaroola. Annual reports for the period 5/12/2008 to 3/12/2015.
During the 2008-2009 licence year, most of the new work done consisted of appraisal rotary mud drilling at Four Mile East (112 holes for 24,460 m) and Four Mile West (113 holes for 19,120 m), with the addition of one NQ diamond cored hole (AKC093) for...-
Document
Published: 20 Jan 1916
-
Lilydale, SA. Progress report and final report to licence expiry/full surrender, for the period 1/4/1969 to 31/3/1971.
An airborne scintillometer reconnaissance with ground-based follow-up, a geochemical study of groundwater, and open-hole rotary mud drilling (10 vertical holes, total 3205 feet) plus downhole wireline geophysical logging failed to locate significant...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Mount Distance. Progress and final reports to licence expiry for the period 3/9/1970 to 2/9/1971.
In a search for possible roll-front type secondary uranium deposits emplaced in piedmont alluvial sediments over an area adjacent to the north-western edge of the Mount Painter Block, the licensees drilled 6 scout vertical rotary holes totalling 2151...-
Document
-
Olary region. Progress and annual reports for the period 23/9/1976 to 22/9/1978.
Intensive exploration of granitoid environs in the Crocker Well area has outlined new areas of, and extended known areas of, primary uranium mineralization. A regional field evaluation was also made of the Glenorchy and Plumbago areas, leading to the...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola, Moolawatana and Mount Hopeless (the Frome Basin Project). Joint annual report for the period 1/1/2016 to 31/12/2018.
Exploration Licence 5017 Arkaroola, Exploration Licence 5118 Mt Yerila and Exploration Licence 5261 Petermorra cover a combined area of approximately 1831 square km within the northern Flinders Ranges and the Frome Basin. The area is being targeted...-
Document
Published: 16 Jan 1919
-
RB 00015 Report on Nichols Nob Uranium Project.
During regional investigations of Mount Painter Block 'frontier' uranium potential being conducted by the South Australian Department of Mines for visitors from the United States Atomic Energy Commission, a ground scintillometer survey of outcropping...-
Document
Published: 01 Aug 1900
-
RB 00036 Wild Dog uranium prospect, section 75 Hundred of Myponga. Progress geological report.
During the period reported, test excavations were started on both the No. 1 and the No. 2 lodes, and two diamond drill holes totalling 156 feet 9 inches, one vertical, one inclined, were completed during February 1954, with another in progress. A...-
Document
Published: 01 Mar 1900
-
RB 76/00027 Explanatory Notes for the FROME 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 01 Mar 1976
-
Mongolata. Third partial surrender report, for the period 13/2/2004 to 9/3/2014.
Exploration for copper and gold mineralisation within a now wholly relinquished 213 square km licence eastern sub-block, located 18-30 km north-east of Burra, has utilised geochemical and geophysical methods to assess the potential of buried...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-05 - Areva Resources Australia Pty Ltd, Denison Range Project, eastern flank Mesozoic sandstone-hosted uranium targets. Drilling project final report.
Areva's Denison Range Project is targeting possible economic sandstone-hosted uranium mineralisation that may have formed within the Mesozoic sandstones located to the east of exposed uranium-rich basement rock sequences of the Palaeo- to...-
Document
Published: 29 Aug 1913
-
RB 2004/00010 Port Pirie Treatment Plant. Management plan Phase 1 - preliminary investigation 2004
This report is Phase 1 of a management plan for the former Port Pirie Uranium Treatment Plant site, and is essentially a preliminary investigation to establish a greater understanding of the characteristics of the site. Phase 2 will follow on from...-
Document
Published: 01 Jul 2004
-
RB 2015/00011 Uranium and uranium mineral systems in South Australia – Third edition.
South Australia is well recognised as being significantly enriched in uranium. During 2013–2014, South Australia produced 4399 t of uranium, representing 80% of Australia’s total uranium production of 5512 t, and equating to 9.2% of the world’s total...-
Document
Published: 01 Apr 2015
-
RB 2012/00009 Uranium and uranium mineral systems in South Australia – Second edition.
South Australia is well recognised as being significantly enriched in uranium. During 2010–11, South Australia produced 4276 t of uranium, representing 60% of Australia’s total uranium production of 7035 t, and equating to 11% of the world’s total...-
Document
Published: 01 Apr 2012
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012