-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Mount Olinthus. Annual report to licence expiry/renewal, for the period 6/3/1995 to 5/3/1996.
Base metal mineralisation, indicated by newly discovered shafts at the historic Atkinson Pb-Ag-Cu-Zn mine, was the impetus for exploration in the upland area 20 km north-west from Cowell. Grab samples collected from shafts, stockpiles and dumps varied...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Data release - as updated [made at SA Director of Mines' discretion] : Kolendo, Taringa, Nonning, Wipipippee and Menninnie Dam (the Menninnie Project). Joint annual reports for the period 1/1/2013 to 31/12/2016.
The Menninnie JV Project area consists of five contiguous exploration licences, and is considered prospective for Pb-Zn-Ag-Cu-Au-Mo-U deposits associated with past epithermal, porphyry, IOCG and skarn - forming geological environments. It lies in a...-
Document
-
Mount Olinthus. Progress reports plus interim final report to licence expiry/renewal, for the period 12/7/1978 to 7/11/1987.
TARGET: Unconformity related, vein-like and vein-type uranium in the Cleve Metamorphics, Katunga Dolomite and Mangalo Schist; lead-zinc sulphides of Broken Hill or Balmat-Edwards type in the Hutchison Group. EXPLORATION: Uranium exploration...-
Document
-
Green Patch. Annual reports for the period 3/12/2001 to 30/5/2006, plus the last six years of tenure' combined annual reports/final report ('no work' letter only) to licence expiry/full surrender, for the period 1/2/2015 to 31/8/2021.
An area centred on the hamlet of Green Patch, located ~10 km north-west of Port Lincoln, was taken up to appraise the iron ore potential of known near surface BIF magnetite mineralisation occurring at the Greenpatch (sic) prospect that had been...-
Document
Published: 16 Oct 1921
-
Data release - as updated [made at SA Director of Mines' discretion] : Middlecamp Hills. Annual reports for the period 30/6/2009 to 29/6/2019.
Two small areas have been taken up in the Cleve Uplands district to explore structurally interesting portions of the Lower and Upper Middleback Jaspilite stratigraphic units for possible economic buried copper, gold, manganese and iron ore...-
Document
Published: 06 Aug 1918
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 1903
-
Data release - as updated [made at SA Director of Mines’ discretion] : Verran. Annual reports submitted until the commencement of joint venture project joint reporting, for the period 29/1/2010 to 28/1/2014.
An area located in the Cowell Hills is being explored for possible economic buried iron ore deposits. The desired commodity is DSO (Direct Shipping Ore) haematite mineralisation similar to that of the Middleback Range iron deposits, where pods of...-
Document
Published: 23 May 1914
-
Data release [made at SA Director of Mines’ discretion] : Wanilla. Annual reports submitted until the commencement of the multi-licence Southern Eyre Peninsula JV Project, for the period 28/10/2004 to 27/10/2006.
A narrow north-south aligned area centred approximately 25 km west-northwest of Port Lincoln, which is mainly covered by Quaternary ferricrete, has been taken up by Centrex Metals Ltd to explore for possible concealed economic deposits of iron ores...-
Document
-
Rudall. Data release made in lieu of submitting a second partial surrender report : annual reports for the period 22/12/1995 to 22/1/2005; plus a (subsequently added) combined annual and final report to licence expiry/full surrender on 22/1/2006.
Exploration of three small licence subareas located near Cleve, Rudall and Verran has targeted possible Palaeoproterozoic stratiform or hydrothermal base and precious metal deposits hosted within Hutchison Group metasediments. Interpretation of 1979...-
Document
-
Woollinie. Progress reports and annual reports plus final report to licence full surrender, for the period 20/12/1991 to 20/11/1995.
Exploration for Broken Hill / Menninnie Dam type Pb-Zn, and later for iron oxide - associated Cu-Au, that was undertaken over an area located north of Kimba within and adjacent to the Pinkawillinie Conservation Park, comprised the acquisition during...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-29, Wilcherry Hill Magnetite Project, Hercules Proterozoic stratabound iron ore mineral prospect. Project interim and final reports.
Iron ore mineralisation similar to that mined in the Middleback Range has been investigated at the Hercules prospect, located 90 km west-northwest of Whyalla, where a large, high intensity aeromagnetic anomaly and associated 12 km long outcrop of...-
Document
-
Cleve East. Progress and final reports to licence surrender for the period 17/2/1977 to 16/2/1978.
As part of a regional programme evaluating the potential of the Eyre Peninsula for economic stratabound base metal deposits, an area of relatively good outcrop lying north-west and west of Cowell was explored by 1:20,000 scale geological mapping, rock...-
Document
Published: 11 Apr 1978