-
Mannum area (including the Anna and Sedan coal deposits). Data release at licence expiry/renewal : coal exploration progress reports and data, plus Sedan coal deposit mine planning management progress reports, for the period 13/11/1978 to 20/8/1992.
TARGET: Possible Tertiary brown coal deposits near Sedan, in the western Murray Basin. EXPLORATION: Evaluation of data as obtained earlier by SADM/SADME drilling and more recently by subject licensees Thiess/CSR from rotary mud vertical open hole and...-
Document
-
Proposed centralized uranium processing plant.
Production of uranium hexafluoride provides widest possible markets and value for Australia's exportable uranium. Australia's uranium resources are capable of supporting a 5000 tonne uranium per annum refinery in SA capable of competing with overseas...-
Document
-
Kingston (South-East). Progress reports [until the commencement of WMC's Kingston Coal Project multi-licence joint reporting, approved from 1/5/1980] for the period 21/8/1979 to 20/2/1980.
Continuing reconnaissance and evaluation of potentially economic Tertiary or Jurassic age coal seams, both known to be present in the Naracoorte and Kingston areas, has consisted of the drilling and geophysical logging of 92 open rotary holes...-
Document
-
Source rock and reservoir bitumen analysis, Crayfish A-1, (offshore) Otway Basin, SA.
101 cuttings and 14 core samples from the depth interval 7500-10,485 feet KB were analysed both to assess the hydrocarbon source potential (maturity, richness, quality) of the Early Cretaceous Pretty Hill Sandstone, and to determine the biomarker...-
Document
Published: 19 Sep 1986
-
EOR (enhanced oil recovery) operations and ethane usage in the Cooper - Eromanga Basin.
A petroleum engineering consultancy review for SADME of the operation, results and economics of the existing Cooper Basin EOR projects, with comments on their likely outcome and the direction which should be taken in the development of future Unit and...-
Document
-
Cadaree Hill (part of the Stuart Range Joint Venture Project). Progress reports and final report to licence expiry/full surrender, for the period 11/8/1977 to 10/8/1978.
Following the first public announcement on 18/11/1976 by Western Mining Corp. of its giant Olympic Dam copper, gold and uranium discovery on Roxby Downs Station, Newmont Pty Ltd began a detailed assessment of the Stuart Shelf region of South...-
Document
-
SADME/Amdel Project 4/321/1 : amelioration of [the visual environmental impact of] quarry faces [in the Adelaide Hills Face Zone]. Investigation Phases 1 and 2 : progress and final reports for the period 13/8/1975 to 6/4/1981.
There is no abstract created for this record-
Document
-
Lock Coal Deposit. Progress reports and final report to licence full surrender, for the period 24/1/1977 to 20/10/1978.
The 1976-1978 drilling programme carried out in the Lock district was designed to establish the quantity, quality and extent of the known brown coal occurrence there. Exploration Licence (EL) 280, taken out by the Director-General, SA Department of...-
Document
-
Role of CO2 in origin of oil and condensate, Cooper Basin, SA.
There is no abstract created for this record-
Document
Published: 30 Jun 1987
-
RB 00306 Drying tests on magnesia-precipitated product.
There is no abstract created for this record-
Document
-
RB 00659A [Review of] Nickel exploration [potential] on Special Mining Lease 33, Tomkinson Ranges.
This report reviews the available information on the region, and presents a preliminary appraisal of the data supplied by South-western Mining Co. Ltd. Current field and laboratory information has also been included. New geological and geochemical...-
Document
Published: 17 Apr 1961
-
RB 00416 Filtration of product slurries.
The problem of efficient washing was first approached with a view to providing excess wash, it being reasoned that as long as excess wash was available the maximum number of displacements through the filter could be attained dependant only on the...-
Document
-
RB 00606 Production of uranium metal by electrolysis in molten chlorides. Part 2.
The molten chloride process previously described has been modified to enable the production of electrolytic uranium metal powder directly from impure oxide. The grade of metal obtained is not sufficiently high for atomic energy purposes. High purity...-
Document
-
RB 00605 Production of uranium metal by electrolysis in molten chlorides. Part 1.
A novel process for the manufacture of pure uranium metal is described, in which impure uranium oxides are converted to chlorides in a molten salt bath by means of a graphite chlorination reaction. The melt is then purified and uranium metal recovered...-
Document
-
RB 00661 Proposed manufacture of sulphuric acid and cement from gypsum by the Billingham Process.
The operation of a planned industrial plant, designed to produce Portland cement and sulphuric acid from anhydrite, is described. Profitable operation of the process in South Australia, using gypsum as the principal raw material, is shown to be...-
Document
-
RB 00725 Bromine from bitterns. Pilot plant investigations.
In an earlier report Wilmshurst (1963) proposed a novel method for extracting bromine from the residual liquor (bittern) resulting from the production of sodium chloride by solar evaporation of sea water. The bromine was to be released by chlorine,...-
Document
-
RB 00541 Spontaneous combustion of copper concentrates. Report on shipment of concentrate to Japan in SS Sariza, February 1957. Second report to Peko Mines NL.
This report covers readings and observations made during the voyage to Japan of a cargo of concentrates from Peko Mines N.L.-
Document
-
RB 00672 SADM / Amdel Project 1/1/40 : Beneficiation of kyanite. Progress report - preliminary cost estimates.
This report gives preliminary details and estimated capital and operating costs for the planned possible treatment of kyanite-bearing ore in the Radium Hill mill. The estimated costs are based on the scale of treatment of ore required to produce 50...-
Document
-
RB 00562 Estimates of the cost of a plant for treating Copperfield (Qld) smelter slag.
The report includes a preliminary estimate of equipment sizes, capital and operating costs, together with a possible flowsheet of a treatment plant for treating slag at Copperfield Q'ld.-
Document
-
RB 00043 Chemical processing pilot plant, Thebarton, South Australia. Report on activities for the period February 1952 to December 1953.
Includes activities of the Division since its inception; and records of pilot plant work relating to the chemical processing, for treatment, of Radium Hill uranium concentrates to produce high grade chemical salt; with photographs of plant...-
Document
Published: 01 Mar 1900