-
Houghton. Annual reports and partial relinquishment report to licence expiry/full surrender, for the period 22/10/2001 to 21/10/2006.
Three potentially economic gold and platinum / palladium - bearing, known primary uranium-mineralised targets in the Palaeoproterozoic Houghton basement inlier have been evaluated through the conduct of office-based geological and geophysical studies,...-
Document
Published: 26 Apr 2007
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-05, west-central Musgrave Province: Giles Complex, Harcus intrusion and Purananja intrusion magmatic copper-nickel-PGE prospects. Project interim and final reports.
PepinNini Minerals has recently completed a small stratigraphic drilling programme within the Musgrave Province in South Australia, which was carried out as a collaborative drilling project (DPY4-05) undertaken between the company and the SA...-
Document
Published: 30 Nov 2007
-
The Musgrave Project [Part]. Data release in lieu of submitting a final report for EL 5317: joint annual reports for the period 5/10/2010 - 31/1/2016, plus separate letters of advice of full surrenders the last being accepted on 10/11/2016.
There is no abstract created for this record-
Document
Published: 06 Oct 2016
-
Fig Tree Corner. Second partial surrender report, for the period 10/3/2005 to 4/4/2019.
Most of a sizeable licence area located on SA's Far West Coast, which formerly extended for 10 to 90 km inland from the vicinity of Bookabie, has now been partially relinquished owing to its perceived diminished prospectivity for Tertiary marine...-
Document
Published: 12 Apr 2019
-
Sahara Prospect. Final report, Model Test and Core Scanning. Project ADI RD02-270 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises exploration conducted by Western Areas between May 2021 and October 2021, under the ADI Agreement ADI: RD02/270-ED Sahara Prospect Model Test and Core Scanning. The discovery of magmatic Ni-Cu sulphide at Sahara in 2020,...-
Document
Published: 31 Oct 2022
-
Poondinga. Third partial surrender report, for the period 27/10/2004 to 4/4/2019.
309.6 square km or ~18.77% of the pre-existing area of EL 5564 Poondinga was partially relinquished on 19/2/2019 because in the licensee's view this south-eastern portion of the licence are does not appear to exhibit the geological features required...-
Document
Published: 12 Apr 2019
-
Ooldea. Final report at licence full surrender, for the period 2/7/2015 to 12/4/2019.
EL 5639, centred ~210 km north-west of Ceduna, was acquired by Iluka’s New Commodities team in 2015 as part of its strategy to explore for possible Voiseys Bay style magmatic nickel, copper and platinum group metallic mineralisation which might be...-
Document
Published: 29 Apr 2019
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 2017
-
Mount Christie. Annual reports to licence expiry/renewal, for the period 24/2/1995 to 23/2/2000.
Interest in an area near Mount Christie Siding was stimulated by the 1993 MESA Barton Bedrock Drilling Programme, which detected anomalous gold, chromium, base metals and platinoid metals in layered ultramafics. Initially, tenement-wide calcrete...-
Document
Published: 10 Aug 2000
-
Coonalpyn (part of the Coonalpyn Joint Venture Project). Annual reports to licence expiry/full surrender for the period 16/10/2006 to 15/10/2008.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, as well as exploring for base metal mineralisation...-
Document
Published: 13 Nov 2008
-
Mount Darling. Annual reports and final report to licence expiry/full surrender, for the period 3/8/2004 to 2/8/2008.
An area located 3 km south of the South Australia/Northern Territory border and 50 km east of the Stuart Highway, on the eastern margin of the Musgrave Block, was considered prospective for nickel and platinoid metal mineralisation hosted by layered...-
Document
Published: 20 Dec 2008
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 2006
-
Claude Hills. Second partial surrender report, for the period 4/12/2000 to 19/6/2018.
A 271 square km major portion of the eastern part of EL 5860 Claude Hills, which is located in the extreme north-west of South Australia in the Musgrave Ranges, has now been voluntarily relinquished by licensee Austral Nickel Pty Ltd. This portion of...-
Document
Published: 04 Aug 2018
-
Aston Hill (part of the Nawa Domain Project). Annual report and final report to licence surrender, for the period 25/6/2013 to 4/6/2015.
No work - reports only contain comments about the Project area's perceived prospectivity.-
Document
Published: 07 Sep 2015
-
Mount Davies (part of the Central Giles / Wingellina Nickel Project). First partial surrender report at licence expiry/renewal, for the period 4/3/1999 to 23/9/2018.
The major part of the subject 134 square km total area of tenement ground relinquished from EL 5184 on 23/9/2017 contains the Michael Hills copper prospect (Area 11). A large portion of the remainder of the surrendered ground, in a separate block...-
Document
Published: 31 Oct 2017
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-35, Mount Darling area magmatic nickel-copper-PGE mineral prospects. Project final report.
Two negative magnetic anomalies within EL 3228 Mount Darling that were believed to be caused by buried layered ultramafic intrusive rocks of the Mesoproterozoic Giles Complex were the targets of the subject exploration by Crossland Minerals, since...-
Document
Published: 13 Jan 2008
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 2009
-
Ki Ki (part of the Coonalpyn Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 14/10/1999 to 17/1/2009.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated within the Cambrian Kanmantoo Trough near Ki Ki in the upper South-East, the licensee and...-
Document
Published: 23 Feb 2009