Mount Painter district (the Gunsight Joint Venture Project). Individual licence's progress reports and annual reports to project licences' joint full surrender, for the period 1/12/1982 to 16/11/1993.
There is no abstract created for this record-
Document
-
RB 56/00083 Pyrite-pyrhotite deposits at Nairne.
The Nairne Pyrite Deposit occurs at Drukunga, three and a half miles east of Nairne, and 29 miles from Adelaide on the eastern flank of the Mount Lofty Ranges. The deposit is being worked for iron sulphides. Operations commenced in 1955 as a joint...-
Document
Published: 01 Jan 1965
-
RB 49/00159 Billy Springs mine, also known as Mount Fitton mine.
The Billy Springs Mine, situated in the Northern Flinders Ranges is located on the north limb of a westerly pitching syncline. Within this main syncline, disharmonic folding has produced a central anticline flanked by synclines to the north and south....-
Document
Published: 01 Jan 1961
-
RB 79/00061 Geochemical exploration for gold, Orama Hill area.
Gold mineralisation occurs near Orama Hill, situated north of Koonamore Station Homestead, and at Kirkeek?s Treasure gold mine on the Nillinghoo Goldfield. These two localities are about 25 km apart, and lie along the axis of the Orama Hill Anticline....-
Document
Published: 01 Jan 1979
-
Geochemical exploration programme SML 390 Marree, SA.
There is no abstract created for this record-
Document
Published: 01 Jan 1971
-
Geology of the Beltana ore deposit.
There is no abstract created for this record-
Document
-
Puttapa. Progress reports to licence expiry/renewal, for the period 11/7/1967 to 10/7/1969.
Exploration and evaluation of two large, outcropping willemite zinc orebodies, previously discovered in the Puttapa area by other parties, has been commenced under tenure of Mineral Claim 5092 newly taken up by SML 153 licensee Electrolytic Zinc Co....-
Document
-
South Puttapa. Progress and final summary reports for the period 15/7/1970 to 16/7/1971.
Appraisal of the Beltana zinc deposit continued during the current licence period, principally by diamond drilling (6 holes, total 2570 feet) aimed at delineating blind extensions to the main orebody on its southern side. The drilling was very...-
Document
-
Beltana. Six-monthly progress report to licence expiry/renewal, for the period 16/5/1966 to 15/11/1966.
There is no abstract created for this record-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release [made at SA Director of Mines' discretion] : Ediacara, Blinman and Wilkawillina (part of the Flinders Ranges Project). Joint annual reports for the period 3/12/2001 to 31/12/2009.
During the first year of combined reporting for exploration licence 2675 “Ediacara”, 2593 “Blinman’ and 2627 “Wilkawillina”, the exploration focus was primarily on the Ediacara tenement. During mid-1999, Perilya reviewed the Ediacara Mineral Field,...-
Document
Published: 22 Mar 1910
-
Beltana mine and Aroona zinc mine mining leases and retention leases (part of the Flinders Ranges Project). Option period first annual report, for the period 1/1/2000 to 30/12/2000.
During the first year of its evaluation of the Beltana and Aroona mining properties on which it has taken out an option, Perilya undertook the following intensive work programme aimed at locating buried extensions and repetitions of the willemite...-
Document
-
SADM / Amdel Project 1/1/177 : Geochemistry of South Australian copper gossans and other ironstones. Progress reports 1 and 2 for the period May 1976 to August 1977.
85 samples of potential mineral deposit- related surface ironstones (68 copper gossans, 6 lead-zinc gossans and 11 false gossans) were analysed chemically and examined mineragraphically in polished section to try to determine geological parameters...-
Document
Published: 12 Aug 1977
-
Beltana mine area. Progress reports and final report to licence full surrender, for the period 27/9/1982 to 8/12/1987.
Renewed exploration by E-Z of the area surrounding the Beltana zinc mine has investigated the possibility for finding deep, unweathered Cambrian or Proterozoic carbonate-hosted zinc-lead sulphide mineralisation. It was considered that this target had...-
Document
-
Mount Gunson copper deposit. Cattlegrid orebody sample testing by metallurgy and mineragraphy (results of 1973 and 1974 studies).
There is no abstract created for this record-
Document
-
Freeling Heights - Mount Adams area. Progress reports for the period 10/6/1968 to 9/12/1969.
As part of a regional search for economic uranium and copper mineralisation, the US-based company Kennecott Copper in November 1968 performed a semi-detailed airborne spectrometer survey of 550 line miles in the Shamrock Valley - Freeling Heights -...-
Document
-
Cattlegrid mine and surrounding lease areas. Mine planning calculations of deposit reserves, including those of orebody extensions, plus a report on a review of copper resources, for the period 1983-1984.
There is no abstract created for this record-
Document
-
Roopena. Progress reports and final report to licence expiry/full surrender, for the period 30/6/1986 to 29/6/1988.
TARGET: Uranium in Proterozoic rocks in areas where these largely concealed by alluvial or weathered materials. EXPLORATION: RAB drilling during March-April 1987 (87 vertical open holes totalling 3583 m), investigation of radiometric anomalies...-
Document
Published: 01 Jan 1988
-
Progress report on geology of the Cattlegrid [copper mine]. Observations since the commencement of mining.
Opening up of the Cattlegrid pit has greatly elucidated the geology of the Whyalla Sandstone and the ore bearing zone of the Pandurra Formation and with the discovery of the MG 14 basic dyke and overlying mineralization, a much more direct association...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document