-
SADM / Amdel project 1/1/84: Recovery of copper from oxidised ores at Burra. Progress reports and final report for the period September 1964 to November 1966.
Investigations into the recovery of copper metal from oxidised ores present in the abandoned historic open cut mine and surrounding dumps at Burra were carried out by Amdel at the request of the South Australian Government's Department of Mines...-
Document
-
Hydrogeological report on water well monitoring in Aboriginal Lands - April to October 2000.
Water well monitoring data from wells on Aboriginal lands (Pitjantjatjara, Yalata and Nepabunna) are summarised for the period April to October 2000. Equipment failure was high, with faults recorded at 17 wells, particularly of the 2100P standing...-
Document
-
Oodla Wirra. Progress and technical reports to licence expiry/renewal, for the period 19/2/1970 to 18/8/1970.
There is no abstract created for this record-
Document
Published: 20 Aug 1970
-
Blackford. Annual reports and final report to licence expiry/full surrender, for the period 25/9/1999 to 24/9/2003.
The Kingston coal deposit, located within a geographic area that extends between 20 and 40 km north-east of Kingston (South-East) township, comprises 985 Mt of lignite shallowly interbedded in Tertiary sediments, in a series of seams that now (in a...-
Document
Published: 08 Dec 1903
-
Hesso and Bookaloo (part of the Torrens Project). Respective first partial surrender reports for the period 19/4/2002 to 18/4/2003.
Olympic Dam style iron-oxide copper-gold mineralisation hosted in Palaeoproterozoic and Mesoproterozoic basement rocks of the Stuart Shelf, and Mount Gunson type younger Neoproterozoic sediment-hosted copper mineralisation, were the targets of...-
Document
Published: 06 Jun 1903
-
SADME/Amdel mineral research project : Leigh Creek Coalfield - coal petrology investigations. Progress reports for the period April 1979 to June 1980.
Coal samples collected by the SADME Fossil Fuels Div. from the Leigh Creek Coalfield during its recent drilling programme have been examined and analysed according to preset parameters to allow comparison of average coal quality between this field and...-
Document
Published: 04 Jul 1980
-
Beltana Project Feasibility Study - Parts 2 to 5.
A mining and mineral processing feasibility study was commissioned by E-Z Corp. from industrial engineering consultant Davy-Ashmore in October 1971, and was completed in February 1972, to define all foreseeable technical aspects of the processes...-
Document
-
History of mineral processing in South Australia - Ammonia leaching of oxide copper ores by Samin Limited at Burra, SA.
When Samin Ltd decided in 1969 to re-open the Burra mine for open pit extraction and onsite processing of the substantial remnant orebody of oxidised copper minerals, it was initially envisaged that the copper recovery method would involve an acid...-
Document
-
Report of investigations for coal in the Arckaringa Basin, [conducted during the period] September to December 1974.
TARGET: Lower Permian coal of steaming or coking grade, suitable for open cut development. EXPLORATION: Rotary drilling of 42 open and partly cored holes totalling 5122 m, including 105 m of coring, with follow-up geophysical logging. RESULTS: 7...-
Document
-
Tintinara. Progress reports and final report to licence expiry/full surrender, for the period 8/1/1979 to 7/1/1980.
Exploration for possible economic Tertiary lignite and coal seams within sediments overlying the northern flank of the Padthaway Ridge palaeo-archipelago in the western Murray Basin has consisted of the drilling and geological/geophysical logging of 7...-
Document
-
Tallacootra. Progress reports and final report to licence expiry/full surrender, for the period 3/11/1975 to 2/8/1976.
A largely soil and dune-covered area bordering the eastern side of the Nullarbor Plain near Lake Tallacootra was investigated initially for possible Precambrian metasedimentary iron ore ocurrences, that may be associated with a number of narrow...-
Document
-
Burdunga Rock Hole. Progress reports and final report to licence expiry/full surrender, for the period 28/10/1975 to 19/11/1976.
TARGET: Permian coal in the Tallaringa Trough, east of Maralinga. EXPLORATION: An 11 hole RC drilling programme totalling 1480 m. RESULTS: Eight drillholes intersected up to 4 horizons of lignite and lignitic clay of demonstrated Eocene age, that...-
Document
-
SML 299 Peesey salt, southern Yorke Peninsula. Report on methods of salt production from brines and seawater.
There is no abstract created for this record-
Document
Published: 01 Jan 1970
-
Crocker Well [ore processing] feasibility study.
Of recent times the client Electrolytic Zinc Co. has sought increased reserves of ore at Crocker Well with a view to making it a profitable uranium mining venture. Although definite limits of ore reserves and grades have still not yet been...-
Document
-
RB 23/00267 Lurgi high-pressure gasification. Record of interview with the Premier. April 27, 1948.
Report describes the technical feasibility and cost estimates for gasifying brown coal from the Moorlands and Leigh Creek deposits, which are the largest such coal deposits known to exist in South Australia. The coal would be gasified by conversion...-
Document
Published: 27 Apr 1948
-
Mullaquana. Progress reports and final report to licence expiry/full surrender, for the period 8/12/1980 to 7/12/1982.
The target was lignite or oil shale hosted by Tertiary sediments possibly preserved on top of a series of tilted fault blocks bordering the western shoreline of Spencer Gulf, due south-west of Whyalla. 29 vertical rotary mud drillholes (total 2729...-
Document
-
Absorbent Clay Project. Progress reports for the period January 1994 to January 1996.
This project was designed to determine the potential of various clays to absorb harmful or toxic substances present in water intended for human use. The clay samples that were selected for study contain significant amounts of either smectite, kaolin,...-
Document
-
Chundie Swamps. Progress reports to licence expiry/renewal, for the period 13/3/1980 to 12/9/1981.
Drilling of 49 rotary mud and partially cored holes totalling 1443 m (of which only 20 holes penetrated into the top of the basement) has been undertaken at the eastern margin of the Eucla Basin to further outline an occurrence of Tertiary lignite...-
Document
Published: 05 Sep 1981
-
Mount Igy. Progress reports to licence expiry/full surrender, for the period 13/3/1980 to 12/9/1981.
TARGET: To define lignite in the Wilkinson Lakes lignite deposit which is of a composition that would be suitable to undergo carbon beneficiation and/or coal liquefaction processes; also, any economic oil shale occurrences and/or sedimentary uranium...-
Document
Published: 02 Sep 1981
-
Hesso, Bookaloo, Arcoona and Lake Torrens South (the Torrens Project). Annual reports and final reports to project licences' respective sequential full surrender or expiry/full surrender, for the period 23/9/2002 to 18/4/2006.
Olympic Dam or Moonta-Wallaroo style concealed iron-oxide copper-gold mineralisation hosted in Palaeoproterozoic and Mesoproterozoic basement rocks of the Stuart Shelf, and Mount Gunson type younger Neoproterozoic sediment-hosted buried copper...-
Document
Published: 12 Oct 1906