-
Trans-Australia Seismic Survey (TASS) 1972 - operational report.
During 1970/71, two large explosions set off at the Ord River Dam building site in Western Australia were recorded on 2000 km long land-based shot recording lines by the BMR and a number of university seismic research groups, and the results were used...-
Document
Published: 01 Jan 1974
-
University student thesis : Detailed geological investigation of the Burra open pit, Burra, SA.
Detailed geological and structural mapping of Samin's partly excavated new Burra open cut was performed by the author at a scale of 1:480 during the period December 1972 to end of January 1973. By the latter date the pit had been excavated downwards a...-
Document
-
Clare Valley groundwater resources. Progress report 4: drilling Phases III and IV.
Two additional phases of the drilling program to assess the groundwater resources in the Clare Valley were undertaken during March 1998 at Wendouree (Phase III), and during July 2000 at Wendouree and Watervale Oval (Phase IV). The Phase III program...-
Document
-
Report on the computerised Landsat lineament analysis, North Flinders Ranges, South Australia.
A computerised lineament analysis of Landsat digital image data covering the northern portion of the Flinders Ranges has shown a strong correlation between the known mineralisation and fracture structuring peripheral to granites, suggesting that...-
Document
-
Hallett Brick Landfill Pty Ltd, proposed sanitary land fill site at Smart Road, St Agnes, South Australia. Environmental Impact Statement.
The proposal for development of sand and clay pit for solid waste disposal is environmentally sound. The study included geotechnical investigation and concluded that management of a Council commercial and industrial waste disposal facility would be...-
Document
-
Bendigo Station. Progress reports to licence expiry/renewal, for the period 6/8/1987 to 5/8/1992.
Copper and gold exploration comprising outcrop, stream sediment and soil geochemical sampling, and the conduct of ground magnetic and IP surveys, plus RC percussion (67 vertical holes, total 6624 m) and diamond cored tail drilling (in 2 holes, total...-
Document
Published: 02 Jul 1992
-
Landsat thematic mapper study of the Yardea Dacite, Gawler Range Volcanics, YARDEA 1:250 000 scale map sheet.
The South Australian Department of Mines and Energy (SADME) commissioned the South Australian Centre for Remote Sensing (SACRS) to undertake a digital analysis of Landsat Thematic Mapper (TM) data in an attempt to locate prospective areas for...-
Document
-
RB 37/00028 Leigh Creek Coalfield: Report on exploration of the north-eastern margin - Telford Basin area 'Telford Opencut, extension east'. (CONFIDENTIAL)
An area located on the north-eastern margin of the Telford Basin, to the east of the present extent of theTelford Open Cut mine main pit, which is known to contain potentially mineable buried coal seams, has been examined geologically and...-
Document
Published: 03 Mar 1954
-
RB 37/00039 Report on the Copper King ochre deposits (near Beltana).
The Copper King orebody, located approximately 10 miles north-northeast of Beltana township, is a massive deposit of iron carbonate, the upper portion of which has been altered by oxidation and hydration to oxides of iron. The deposit was worked...-
Document
Published: 09 Mar 1954
-
RB 39/00062 Preliminary report on a building stone deposit at Basket Range.
The deposit is within Section 250, Hundred of Onkaparinga, on the southern side of the main road between Basket Range and Forest Range, 15 miles easterly from Adelaide. The land is owned by Mr. W. Bishop of Forest Range, to whom royalties on minerals...-
Document
Published: 01 Jan 1957
-
RB 54/00057 Landslide area, Torrens Gorge Road deviation. Supplementary report.
There is no abstract created for this record-
Document
Published: 01 Jan 1964
-
RB 53/00045 Final report on site investigation proposed oil refinery site, Port Stanvac, sections 581, 582, 586 and 602, part sections 588, 603, and 604 Hd Noarlunga.
A final site investigation has been carried out at the proposed oil refinery site at Port Stanvac, S.A. on behalf of the contractors for construction, the M.W. Kellogg Company. The test boring, involving 26 boreholes totalling 1420`0½”, and the...-
Document
Published: 01 Jan 1961
-
RB 53/00045A Report on site investigation, of proposed oil refinery site near O'Sullivans Beach, Hd Noarlunga, South Australia.
At the request of the Vacuum Oil Company Pty. Ltd. responsibility was undertaken for the submission of a report on the physical and engineering properties of the soils from the proposed oil refinery site north of O’Sullivans Beach, Hundred Noarlunga...-
Document
Published: 01 Jan 1961
-
RB 51/00088 Report on site investigation proposed oil refinery site near O'Sullivans Beach. Characteristics of the soils and design of footings for installation.
The topography, geology, bore data and soil mechanics data were given in Parts A and B of this report. As far as the geology of the site is concerned this was comprehensively and adequately described in Part A of the report and in summary form in the...-
Document
Published: 01 Jan 1960
-
RB 51/00019 Report on site investigation proposed oil refinery site near O'Sullivans Beach, a bore data and geology, PTB soil mechanics data.
It is proposed to construct an oil refinery on a site containing 604 acres (approximately) near O’Sullivan’s Beach. After a preliminary geological examination a test boring programme was worked out, approved and executed. This involved 27 percussion...-
Document
Published: 01 Jan 1960
-
RB 59/00134 Mount Gambier pumping station. Geological progress report no. 1, December 1964.
The sites for a proposed pumping station and pipeline were examined on 28th October, together with Mr W. Moore, Resident Engineer, Southern District, Engineering and Water Supply Department. The examination followed a request from the...-
Document
Published: 01 Jan 1964
-
RB 60/00001 Report on site investigation for a proposed surface tank at Minlacowie.
The site for a planned 1 million gallon capacity, reinforced concrete water storage tank to be constructed on the ground surface at Minlacowie was inspected on 27th November 1964, together with S. Warwycke of the SA Engineering and Water Supply...-
Document
Published: 04 Jan 1965
-
RB 55/00064 Geological investigation of leakage from Aroona Dam. Final report on drilling.
Drilling of the four diamond drill holes recommended in the interim report was completed on 30 July 1962 and pressure water testing of the holes was done in the same week. This present report discusses the results of drilling and testing and the...-
Document
Published: 01 Jan 1962
-
RB 58/00142 Limestone deposit, sections 671, 672 Hundred of Davenport, laboratory testing.
Results of laboratory testing of selected drill core samples, carried out by the Highways and Local Government Department, are presented. Those support an earlier recommendation for trial pits.-
Document
Published: 01 Jan 1967
-
RB 57/00100;Amdel 00297 Lightweight aggregate rotary kiln tests.
There is no abstract created for this record-
Document
Published: 01 Nov 1963