-
Yalarna. Progress reports and final report to licence expiry/full surrender, for the period 4/9/1980 to 3/9/1982.
In a search for East Alligator River - type metamorphic uranium deposits, a review of previous geophysical data plus the conduct of ground and airborne radiometric surveys disclosed a number of anomalies in an area on central Eyre Peninsula extending...-
Document
-
Peachna. Progress reports, annual reports and final report to licence full surrender, for the period 22/9/1988 to 8/9/1994.
Possible economic Broken Hill - type stratiform Pb and Zn, and Middleback Range style iron ore, were targeted near Lock on central Eyre Peninsula by Western Mining Corp., who farmed-in to Stockdale's EL 1516 on March 1st, 1990 as part of a regional...-
Document
-
Kimba area (Caralue Bluff). Progress reports and final report to licence expiry/full surrender, for the period 21/8/1979 to 9/6/1986.
An intensive search for possible banded iron formation - related Proterozoic stratiform lead-zinc mineralisation, of Gamsberg / Aggeneys / Broken Hill style, over an area surrounding Kimba on Eyre Peninsula, has included aerial magnetic and...-
Document
-
Sleaford. Partial surrender report for the period 13/2/1998 to March 1999.
Lag / laterite sampling and a geophysical data review of an area of concealed basement 25 km south-west of Port Lincoln, searching for granulite facies - hosted gold deposits within the Archaean Sleaford Complex, plus possible shear - related...-
Document
-
Cummins. Annual reports and final report to licence surrender, for the period 10/1/1997 to 16/3/1999.
Thick and often unconsolidated cover sequences of Bridgewater, Uley and Wanilla Formations prevented systematic regolith sampling of much of the area between Wanilla and Peachna, 40 km north-west of Port Lincoln, while no coherent base metal anomalies...-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Warrow. Progress and final relinquishment reports for the period 10/6/83 to 9/12/84.
Extensive geophysical prospecting, an 8 hole percussion drill coring programme (477 m) and a 140 hole RAB drilling programme (1798 m) at the Lady Franklin prospect were not encouraging. Percussion drillhole 83WP2 intersected a zone of primary but...-
Document
Published: 19 Dec 1984
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document
-
Uno [West] and Eurilla Dam (part of the Wilcherry Hill Project). Third and first partial surrenders' respectively combined report, for the overall period 10/10/2002 to 7/4/2022.
17 square km or ~65% of the former area of EL 5931, and 14 square km or ~12% of the former area of EL 6072, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
-
Cootra. Progress and final reports to licence surrender for the period 25/11/80 to 28/3/84.
Pioneer exploration for possible stratabound base metal deposits that have a facies relationship to metamorphic iron deposits, which was carried out in the Cootra area, located 20 km east south-east of Warramboo on central Eyre Peninsula, has...-
Document
Published: 09 Apr 1984
-
Triple Hill. Progress reports to licence expiry/full surrender, for the period 10/7/1979 to 4/10/1982.
Exploration for possible buried occurrences of unconformity-related uranium mineralisation, undertaken within an area located approximately 26 km west-southwest of Cowell on eastern Eyre Peninsula, has included the acquistion during July 1979 of a 500...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
Cleve West. Progress reports and final report to licence full surrender, for the period 25/9/1979 to 27/1/1985.
The target within an area centred ~35 km north-west of Cleve was massive stratiform Broken Hill and Aggenys style base metals mineralisation associated with the Lower and Upper Middleback Jaspilite units of the Hutchison Group. A world class sized...-
Document
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007
-
Elliston, western Eyre Peninsula. Annual reports and final report to licence full surrender, for the period 21/2/1996 to 23/12/1998.
Diamond, gold and platinum group element (PGE) exploration activities carried out within an area of known kimberlitic and lamproitic intrusive rocks east of Elliston comprised aircore drilling (23 holes, total 1188 metres), addressing 17 out of 36...-
Document
-
Marble Range. Annual reports plus first partial relinquishment report, for the period 30/4/1997 to 16/3/1999.
Aircore drilling of gold and base metal targets (23 holes, total 1136 m) was undertaken following lag, rock chip and leach sampling and a review of previous aeromagnetic and drillhole data from three separate areas, 40 km west and 50 km north-west and...-
Document
-
Sleaford. Annual and final reports for the period 13/2/98 to 12/2/2000.
Lag/laterite geochemical sampling carried out 20 km west of Port Lincoln identified certain areas that are anomalous in As. However, no anomalous drillcore assay results were returned from follow-up aircore drilling (5 holes, total 281 m) of a...-
Document
-
RB 2020/00026 PACE Copper Gawler Craton Airborne Survey, Region 6, Gairdner - enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Oct 2020
- ZIP,
-
Gawler Province regional geology 3D Model (3D version 1).
The Gawler Province 3D Geological Model is the second product of PIRSA's early 3D modelling trials conducted using 3D GeoModeller software. The work began with identifying the statigraphic units that were to be modelled. Due to the regional scale of...-
Model
- ZIP,
-
Cultana basement regional geology 3D Model.
The Cultana basement 3D Geological Model covers a region which includes the Roopena, and western half of the Cultana, 1:100,000 mapsheet areas. The subsurface geology that has been modelled comprises a succession of deformed Palaeoproterozoic...-
Model
- PDF,
- ZIP