-
Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
RB 58/00120 Summary of recent investigations in the Mount Toondina area of the Arckaringa Sub-basin.
Detailed mapping, drilling of 2 shallow stratigraphic wells, gravity and seismic surveys were carried out over inlier within Mesozoic sediments. Aim of drilling was to test for coal seams and describe Permian strata, but only Cretaceous / Jurassic...-
Document
Published: 18 Jun 1964
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Mount Denison. Progress reports and final report to licence full surrender, for the period 13/5/1991 to 22/3/1993.
Possible economic epithermal/hydrothermal uranium and base metal deposits hosted by Early to Middle Proterozoic meta-igneous and metasedimentary basement rocks in the northern Peake and Denison Ranges were the primary targets addressed by CRA in their...-
Document
-
Welbourn Hill. Progress reports and final report to licence expiry/full surrender, for the period 11/4/1991 to 10/4/1993.
Exploration for possible buried Olympic Dam (Cu-Au-U) style mineralisation, undertaken in the Welbourn Hill area by Newmont Australia Limited through its subsidiary Newcrest Mining, initially comprised the acquisition of ground magnetic, gravity and...-
Document
-
Todmorden area. Progress reports for the period 4/10/89 to 3/4/91.
TARGET: Diamonds. EXPLORATION: Drilling (1 rotary hole totalling 306 m) over a possible buried kimberlitic diatreme identified from seismic and gravity surveys. RESULTS: No kimberlite was intersected.-
Document
Published: 22 May 1991
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document
-
Burial history of the eastern Officer Basin, South Australia.
Burial history analysis of the structurally complex eastern Officer Basin region was performed using data from petroleum, trona exploration and stratigraphic wells, seismic upholes, coal drillholes and selected seismic sections, to construct isopachs...-
Document
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document
-
Midgerie, Barton South, Immarna, Barton Siding, Mount Christie Siding, Lake Bring, Mulgathing, Wynbring (TARCOOLA and BARTON 1:250k mapsheets region). Joint progress reports and final reports, for the period 11/4/1981 to October 1990.
Stockdale's exploration for diamonds in the Barton region, at the start of the licence period, commenced with the evaluation of 136 potential kimberlite targets generated by the detailed in-house interpretation of data acquired from an extensive new...-
Document
-
Bulgunnia. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 10/8/1981.
The base metal and uranium potential of a concealed Proterozoic basement high near Bulgunnia Homestead was evaluated using geological and hydrogeochemical reconnaissance and regional geophysical interpretation approaches. Seismic, ground magnetic and...-
Document
-
Dalhousie Block (exploration) summary and five-year plan.
A summary of Block petroleum prospectivity prepared prior to starting selective low-key exploration during the 1985-1989 licence period. The report gives the rationale for the proposed work programme of 4 wells and 1900 line km of seismic acquisition...-
Document
Published: 01 Jan 1985
-
Calcutta (subject to the Marree JV Project). First partial surrender report at licence expiry/renewal, for the period 21/6/2006 to 20/6/2011.
An area located along the southern margin of the Eromanga Basin 53 km east-northeast of Farina, which is crossed by part of the Strzelecki Track, has been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones,...-
Document
-
Margaret Creek and Francis Swamp (part of the Billa Kalina Project). Joint first partial surrender report, for the period 23/2/2006 to 22/2/2009.
Within the now relinquished portions of the subject licences, as part of a regional search across several tenements in the Billa Kalina district for possible kimberlites or diamonds, Flinders Mines carried out scout exploratory drilling in two...-
Document
-
Mulga Well. Annual reports to licence expiry/full surrender, for the period 22/6/2004 to 21/6/2009.
An area located close to the western margin of the Stuart Shelf, approximately 90-120 km south-west of the Olympic Dam deposit, and extending parallel to it for 65 km, was taken up by Marathon Resources (Marathon) to explore for possible economic IOCG...-
Document