-
Rudall. Progress and final reports to licence surrender for the period 10/9/1971 to 9/9/1972.
In a search for possible economic primary or secondary uranium deposits in the Rudall area, five streambed mud samples and 2 springwater samples from the Driver River drainage basin were analysed for Central Pacific Minerals by the Australian Atomic...-
Document
Published: 02 Nov 1972
-
Kalabity. First annual report for the period 22/7/1968 to 21/7/1969.
Exploration for possible economic primary and secondary uranium deposits, within an area extending for 50 miles north-westwards from Cockburn and Mingary, has consisted of the first-time (for this locality) acquisition by the licence operator of an...-
Document
-
RB 78/00073 Land use conflicts. Plumbago pastoral lease and historic reserve.
Discusses impact of mineral exploration on Aboriginal historic sites with pictorial record of principal areas of concern.-
Document
Published: 01 Jan 1978
-
Whyalla. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2003 to 11/6/2008.
Evaluation of the perceived Olympic Dam style copper-gold and Stuart Shelf type stratabound copper potential of, respectively, the Proterozoic basement and the Adelaidean cover rocks in an area lying immediately to the west of the Cultana Inlier was...-
Document
Published: 01 Oct 1908
-
Beverley Uranium Project - Environmental Impact Statement, June 1998, and related reports.
There is no abstract created for this record-
Document
-
Houghton. Annual reports and partial relinquishment report to licence expiry/full surrender, for the period 22/10/2001 to 21/10/2006.
Three potentially economic gold and platinum / palladium - bearing, known primary uranium-mineralised targets in the Palaeoproterozoic Houghton basement inlier have been evaluated through the conduct of office-based geological and geophysical studies,...-
Document
Published: 26 Apr 1907
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Data release - as updated [made at SA Director of Mines' discretion] : Kainton, Melton and Paskeville (the Melton Project). Joint annual reports for the period 27/8/2007 to 26/8/2019.
Exploration for possible buried sandstone-hosted uranium mineralisation which could have formed within early Tertiary palaeochannel sediments of the northern Saint Vincent Basin is being carried out in a small area near Kainton on north-eastern Yorke...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-06 - Intercept Hill, Stuart Shelf, Mesoproterozoic IOCGU mineral prospects. Drilling project final report.
EL 5372 Intercept Hill is centrally located in the world class Olympic Dam Iron Oxide Cu-Au-U Province, at the centre of a cluster of iron oxide copper occurrences including Emmie Bluff, Oak Dam and Winjabbie. The Intercept Hill area has available...-
Document
Published: 19 Jan 1916
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ooldea. Annual reports for the period 1/9/2010 to 19/9/2018.
Due to catastrophic flood damage to Cosmo’s financial investments, no field work was undertaken during the twenty-first year of tenure under renewed EL 4565. In December 2010, Cosmo submitted to PIRSA a Declaration of Environmental Factors for its...-
Document
-
Frome Downs Homestead. Progress and technical reports to licence expiry/renewal, for the period 1/1/1969 to 31/12/1970.
Reconnaissance shallow stratigraphic drilling with subsequent borehole geophysical electric and radioactivity logging in the south-western Frome Embayment (21 rotary mud partly cored holes, total 8841 feet), over areas lying adjacent to outcropping...-
Document
Published: 31 Dec 1970
-
Honeymoon project - hydrological report on the HC 9 pumping test conducted February-March, 1980.
Regional and site-specific geological and hydrological factors are discussed, and a groundwater model is proposed for the Honeymoon uranium deposit, based on the results of the HC 9 drilling and testing programme, and on other existing data. A...-
Document
-
Preliminary [mining] feasibility study [for the] Lake Frome uranium orebodies. Final report.
Report presents the results of a preliminary study of the commercial feasibility of producing yellowcake from the Beverley sedimentary uranium deposit located near Lake Frome. All of the available drillhole data for this deposit was examined and...-
Document
-
Mount Chandler (Musgrave Ranges Project). Annual and final reports for the period 11/11/1996 to 10/11/1999.
Cu-Au-U prospects associated with shear zones and Kulgeran age granites have been identified in an area approximately 60 km north-west of Marla. Best assay results were obtained from the Indulkana Shear Zone, where rock chip sampling returned up to...-
Document
-
Murloocoppie North-west (part of the Nawa Domain Project). Annual reports to licence surrender, for the period 25/6/2013 to 4/6/2015.
An area centred approximately 115 km south-east of Marla was taken up to explore for possible economic buried gold and base metal mineralisation that may have formed in Archaean to Proterozoic basement rocks or the overlying Palaeozoic sedimentary...-
Document
Published: 29 Sep 1914
-
Algebuckina. Annual reports to licence expiry/full surrender, for the period 3/8/2008 to 28/9/2014.
The only field work undertaken by Red Metal during its final six years of tenure of EL 3226/4307 Algebuckina was the assaying in 2011 of 88 soil and rock chip samples which it had collected from the vicinity of historically reported surface copper...-
Document
Published: 01 Oct 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Midgee (latterly part of the Cowell JV Project). Annual reports for the period 26/11/2003 to 24/3/2019.
An area of the northern Cowell Hills was taken up to explore for possible economic basement-hosted copper-gold mineralisation of epigenetic style, analogous to that found at the Ernest Henry deposit, which may be associated with magnetic anomalies and...-
Document
Published: 08 May 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Indooroopilly Outstation. Annual reports to licence expiry/re-issue, for the period 17/5/2009 to 16/5/2010.
A large area centred approximately 170 km south-west of Coober Pedy is being explored for possible economic buried secondary uranium mineralisation in the form of palaeochannel - hosted roll front or unconformity type deposits which may have formed...-
Document
Published: 22 Oct 1910
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Brady. Annual reports to licence expiry/renewal, for the period 25/1/2010 to 24/1/2015.
An area centred over the central Coober Pedy Ridge tectonic feature, 28 km east-southeast of Coober Pedy township, is being explored for possible economic buried massive haematite and magnetite within banded iron formation (BIF) type iron ore...-
Document
Published: 05 Mar 1915