-
RB 60/00051 Stratigraphy and micropalaeontology of three deep bores, Hd Port Gawler.
Three relatively deep bores, drilled recently on the northern Adelaide Plains in the Hundred of Port Gawler, about 20 miles north of Adelaide, have intersected useful complementary sections of the Cainozoic succession, ranging from 560 feet to 1148...-
Document
Published: 15 Mar 1965
-
RB 78/00057 Adelaide city stratigraphic drilling 1976, hydrogeological completion report.
Two exploration wells have been drilled through the Cainozoic sequence to Precambrian bedrock to provide stratigraphic and hydrogeological data. At the South Parklands site two aquifers were tested. The upper one yielded a large supply of marginally...-
Document
Published: 01 Jan 1978
-
RB 80/00040 Northeast Transit Project - King William Street tunnel investigation.
Eighteen stratigraphic and material testing rotary mud/core drillholes were drilled along King William Street, as part of a feasibility study for an underground railway. All of the holes penetrated the Hindmarsh Clay and the calcareous Hallett Cove...-
Document
Published: 01 Apr 1980
-
RB 97/00045 Briefing on Adelaide South Parklands aquifer storage and recovery potential.
MESA has been approached by civil engineering firm B.C. Tonkin and Associates to help with assessing the possibility of developing an aquifer storage and recovery scheme in the Adelaide South Parklands. Their client the Adelaide City Council is...-
Document
Published: 01 Aug 1997
-
Bull 051 Engineering Geology of the Adelaide City Area
The importance of engineering geology has been emphasised since the 1950s. when construction commenced in the city of a new generation of multistorey buildings. Foundation drilling along with geological and geophysical services provided by the...-
Document
-
RB 71/00061 Stratigraphy and engineering properties of the soil and rock horizons beneath the Adelaide city area, Hds Adelaide and Yatala.
The geological conditions and rock and soil properties existing beneath the Adelaide city area, have, of necessity, become more important as both the size of buildings, and the extent of construct ion has increased. Drilling and excavation in the area...-
Document
Published: 08 Apr 1971
-
RB 72/00237 Forensic Science and Motor Vehicles Department buildings, TA 300, 301, Hd Adelaide. Foundation investigations, design stage - Public Buildings Department.
Drilling to determine foundation conditions for the proposed Forensic Science and Motor Vehicles Buildings was requested by Mr. A. Dancauskis of the Public Buildings Department. The two buildings will be from 6 to 9 stories high, will have basements,...-
Document
Published: 08 Dec 1972
-
RB 61/00108 Immanuel College, Camden Park, bore no. 1 stratigraphy and micropalaeontology.
Water bore No. 1 located at Immanuel College in Camden Park, 4½ miles south-west of Adelaide, was sunk to a total depth of 350 feet on a portion of the Para Fault Block bounded by two splinters of the Para Fault. Recent to Pleistocene clays overlie...-
Document
Published: 01 Jan 1965
-
RB 74/00185 Adelaide subway study reconnaissance drilling North Adelaide. Report on geological investigations - Director General of Transport.
A programme of reconnaissance drilling has been completed in the North Adelaide and Torrens Valley areas to assist in the selection of a route for the proposed Adelaide Metropolitan Subway. The drilling was carried out to augment knowledge of the...-
Document
Published: 01 Jan 1974
-
RB 74/00082 Cowandilla Primary School completion report, bore no. 1, section 92 Hundred of Adelaide - Public Buildings Department.
Following a quotation from this Department to sink a 6 inch water supply bore to a depth of approximately 137 metres (m) at Cowandilla Primary School a letter was received from Public Buildings Department dated 14th February, 1973, requesting the...-
Document
Published: 01 Jan 1974
-
RB 76/00032 Hilton Bridge, Burbridge Road, secns Parklands, Hd Adelaide. Foundation investigations - South Australian Railways.
Three cable tool holes have been drilled to investigate the foundation conditions for a proposed new bridge over the railway line, on Burbridge Road, Hilton. Drilling disclosed a near horizontal sequence of Quaternary and Tertiary sediments which are...-
Document
Published: 11 Mar 1976
-
Northern Adelaide Plains groundwater review.
The availability of good quality groundwater from two Tertiary confined aquifers (T1 and T2) under the Northern Adelaide Plains (NAP) has encouraged the development of over 3000 hectares of horticulture in the area since the 1950s. At present,...-
Document