-
Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document
-
RB 78/00117 Bumbarlow 1 - Well completion report.
Bumbarlow 1 (TD 720.33 m) aimed to test the lithology and petroleum potential of the Cambrian section in the central part of the eastern Arrowie Basin. It continuously cored a sequence over 300 m thick of flat-lying Proterozoic sediments interbedded...-
Document
Published: 01 Sep 1978
-
RB 83/00019 1:250 000 Geological Series - Explanatory Notes. DALHOUSIE, South Australia.
The geomorphology of DALHOUSIE broadly consists of stony uplands which include mound springs in the west, and dunefield lowlands in the east on the edge of the Simpson Desert. Strongly folded ?Adelaidean sediments are overlain by a more gently folded...-
Document
Published: 01 Nov 1984
-
RB 83/00056 Edeowie 1. Well completion report.
Edeowie 1 (TD 984 metres), which aimed to identify a series of seismic reflectors mapped by SADME beneath the eastern Lake Torrens piedmont plain, has intersected a stratigraphic sequence with features indicating that complex structural changes occur...-
Document
Published: 01 Jul 1983
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release - as updated : Lake Frome North (latterly part of The Lakes Uranium JV Project). Annual reports to licence expiry/full surrender, for the period 15/8/2005 to 25/11/2014.
An area on and surrounding the northern third of the Lake Frome salina was taken up to explore for possible economic buried roll front style sedimentary or calcrete-hosted uranium deposits that may have formed within Quaternary and Tertiary sediments...-
Document
Published: 01 Dec 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Honeymoon project - hydrological report on the HC 9 pumping test conducted February-March, 1980.
Regional and site-specific geological and hydrological factors are discussed, and a groundwater model is proposed for the Honeymoon uranium deposit, based on the results of the HC 9 drilling and testing programme, and on other existing data. A...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 27/8/2009 to 26/8/2015.
During the 2009-2010 licence year, 8 vertical open rotary mud drillholes, YR035 to YR042, were completed along two drill traverses for a total penetration of 1614 m. They were designed to intersect the Eyre Formation adjacent to interpreted faults in...-
Document
Published: 10 Sep 1913
-
Lake Callabonna and Lake Blanche (the Lakes North Uranium JV Project). Farminee's joint first annual / final report submitted to Red Metal and PIRSA at its exit from JV participation, for the period 26/11/2010 to 7/12/2011.
Two adjoining areas on the piedmont plains located to the south-west of Lakes Callabonna and Blanche, at the southern margin of the Strzelecki Desert, were taken up to explore for possible economic buried roll front style sedimentary or...-
Document
-
Merty Merty (part of the Big Lake Project). Final report for approved geophysical program, Project ADI RD01-109 [part of Accelerated Discovery Initiative Round 1, 2021].
An ADI funds grant of ~A$152,400 has been provided to Alligator Energy to assist it with conducting further greenfields exploration for in situ recoverable secondary uranium mineralisation that may have formed within Tertiary cover sediments in the...-
Document
Published: 20 Aug 1921
-
Honeymoon Uranium Project. Final report for approved seismic geophysical work programme, Project ADI RD01-100 [part of Accelerated Discovery Initiative Round 1, 2021].
Within two areas located north-west of Cockburn, Honeymoon Project licensee Boss Energy (Boss) is targeting possible sandstone-hosted uranium mineralisation in primarily palaeochannel-hosted, redox-controlled type occurrences, similar to the...-
Document
Published: 30 Nov 1921
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola, Moolawatana and Mount Hopeless (the Frome Basin Project). Joint annual report for the period 1/1/2016 to 31/12/2018.
Exploration Licence 5017 Arkaroola, Exploration Licence 5118 Mt Yerila and Exploration Licence 5261 Petermorra cover a combined area of approximately 1831 square km within the northern Flinders Ranges and the Frome Basin. The area is being targeted...-
Document
Published: 16 Jan 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
Honeymoon Uranium Project. Yarramba Palaeovalley structure and fill geological modelling: deposit brownfields appraisal drilling and downhole geophysical logging. Final Report, Project ADI RD01-100 [part of Accelerated Discovery Initiative Round 1, 2022]
Ongoing exploration presently being conducted in the vicinity of the Honeymoon uranium deposit aims to define and characterise extensions to the Honeymoon resource contained within Mining Lease 6109, by testing target areas located just beyond the...-
Document
Published: 26 Apr 1922
-
Bulgunnia. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 10/8/1981.
The base metal and uranium potential of a concealed Proterozoic basement high near Bulgunnia Homestead was evaluated using geological and hydrogeochemical reconnaissance and regional geophysical interpretation approaches. Seismic, ground magnetic and...-
Document
-
RB 00839 Post-Cretaceous structure of the Cooper Basin region in SA, and its relevance to petroleum migration and entrapment.
The Cooper Basin region has had a long structural history, reflected in differing structural styles ranging from thrust faults, to extensional horst and graben developments, to wrenching. The timing of this structuring in relation to the main period...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : North Mulga. Annual reports to licence expiry/renewal, for the period 10/7/1997 to 23/9/2012.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately east and north-east of the Beverley uranium deposit and covering the northern end of the...-
Document
Published: 05 Nov 1912
-
Goulds Dam and Katchiwilleroo Dam (temporarily part of the Goulds Dam JV Project). Data release made at licences' joint expiry/lapse of tenure : joint annual reports for the period 27/8/2009 to 26/8/2014.
During 2009-2010, the first year of the subject licences' joint annual reporting, 27 vertical open exploratory rotary mud holes were drilled to basement on EL 3905 Goulds Dam for a total penetration of 3564 m, to search for redox fronts that may exist...-
Document
Published: 23 Oct 1914