RB 83/00017 SADME Oakvale 1. Well completion report.
The fully rotary cored Oakvale 1 vertical stratigraphic drillhole was drilled by SADME Regional Geology Branch, 13 km east of Oakvale Station homestead in the north of the Murray Basin within SA, over the period 22/5/1981 to 10/6/1981. The hole was...-
Document
Published: 01 Mar 1983
-
RB 83/00016 Murray Basin hydrogeological investigations, drilling programme northwestern margin. Progress report no. 5.
As part of investigation on effect of groundwater on Murray River salinity, 12 holes were drilled to depths of 60 - 234 metres to obtain data on unconfined Murray Group aquifer and underlying Renmark Beds confined aquifer.-
Document
Published: 01 Mar 1983
-
RB 84/00013 Wilgena 1. Well completion report.
Wilgena 1 (TD 973 m) penetrated 964 m into Tarcoola Formation within the Wilgena Sub-basin, without encountering magnetic basement. Thin dacitic to basaltic tuffs and basaltic flows, interbedded with carbonaceous siltstones, indicate contemporaneous...-
Document
Published: 01 Mar 1984
-
RB 84/00057 Apparent conductivity ground electromagnetic test survey of the proposed solid waste disposal depot - Pt.secn 5028 Hundred of Port Adelaide, South Australia.
An experimental survey using Geonics EM 31 meter was carried out near 2 solid and 1 liquid disposal depots. The area is part of Government Environmental Impact Study (EIS). Results show local near surface variations with broad deeper variations...-
Document
Published: 01 Jul 1984
-
RB 85/00008 Stratigraphic drilling of Cainozoic sediments near Lake Eyre, BMR 1983, well completion report.
10 fully cored shallow holes (total 543.2 m) were rotary mud drilled at four localities by the Australian Commonwealth Bureau of Mineral Resources (BMR) to elucidate the cover stratigraphy, particularly the upper age limit of the Etadunna Formation,...-
Document
Published: 01 Feb 1985
-
RB 85/00047 Shallow refraction seismic survey of proposed Mobilong Medium Security Prison. - Department of Housing and Construction.
Aim was to delineate the top of the granite which had been detected in auger drilling. Results show that the granite was probably in the form of boulders as the seismic velocity of the layer containing the granite was extremely low. Some test trenches...-
Document
Published: 01 Feb 1986
-
RB 87/00048 Ooldea 2. Well completion report.
Ooldea 2, located 19 km south of Ooldea Railway Siding, was spudded on 25/9/85. It was sited next to Amoco drillhole ORP1, which had intersected 90 metres of basement gneiss with a composition including hypersthene + sillimanite + quartz, with...-
Document
Published: 01 Feb 1987
-
RB 87/00100 Cavity investigation over proposed ETSA substation.
A pole-dipole resistivity survey north of Mount Gambier, delineated anomalies attributed to subsurface cavities or variations in the thicknesses of clay and sand above the Bridgewater Formation. Drilling proved them to be caused by the latter.-
Document
Published: 01 Dec 1987
-
RB 83/00025 Beachport town water supply, well no. 4 completion report.
Well drilled to 363 metres to the Dilwyn Formation confined aquifer system and completed as production well.-
Document
Published: 01 Apr 1983
-
RB 83/00021 Coal exploration in the Leigh Creek Farina area, South Australia. EL 938, final report.
The subject exploration licence was taken up for a 1-year term to enable ETSA and SADME to jointly conduct exploration for possible Triassic coal basins that might be concealed beneath alluvial cover in sparsely drilled areas to the north and...-
Document
Published: 01 Mar 1983
-
RB 84/00069 Groundwater supply at Balyana for Bedford Industries.
Successful water well was drilled to 76 metres in quartzite and siliceous siltstone to provide irrigation supply and to elucidate the stratigraphic and hydrogeologic nature of the area adjacent to the Eden Fault. Ground water intersected in fractured...-
Document
Published: 01 Sep 1984
-
RB 84/00072 Woolpunda groundwater interception scheme. Core drilling programme.
5 drill holes (580.2 metres) between Waikerie and Overland Corner to investigate scheme to intercept saline ground water inflows to River Murray, revealed consistent lithology and sequence in Murray Group carbonate sandstone aquifer and average value...-
Document
Published: 01 Sep 1984
-
RB 84/00073 Cape Jervis Seismic Survey, report no. 2 - Department of Marine and Harbours.
Rippability of the near surface material below the low water mark was determined for proposed excavations below a boat ramp. Excavation by backhoe should be possible, but 2 areas may be difficult. Basement depth contours were calculated to indicate...-
Document
Published: 01 Apr 1986
-
RB 84/00070 Preliminary geological assessment of the proposed South Para Warren Reservoirs pumped storage scheme.
Geological conditions are suitable for the proposed alignments of tunnel and racechannel.-
Document
Published: 01 Jul 1985
-
RB 85/00029 Geophysical interpretation - Brompton pughole (Anne Street, Brompton) - SA Housing Trust.
The probable extent of excavation prior to infill of various materials was delineated at an old clay pit including areas with apparently high concentrations of ferro-metallic debris along with a deeper section of relatively uncompacted material....-
Document
Published: 01 Feb 1986
-
RB 85/00028 Report on a shallow refraction survey - Noarlunga Embayment.
4 shallow spreads have provided additional basement depth information over possible basement high, as indicated from shallow borehole date over the area. Results indicate a small ridge below spread 3 which extends into the overlying sediments. This...-
Document
Published: 01 Feb 1986
-
RB 86/00021 Whyalla Cowell road, drilling for construction water 1985.
Geophysical work and 10 wells were drilled using rotary and cable tool, (6331WW 224 - 227, 231 - 238). 1 well in Cowell Basin is capable of yielding 6 L/s. 2 wells in Precambrian bedrock, (1 on EM anomaly), were unsuccessful. 1 well in palaeochannel...-
Document
Published: 01 Apr 1986
-
RB 86/00059 Berri East groundwater interception scheme hydrogeological investigation.
This detailed investigation evaluates data from both SADME drilling and investigations, and EWS drilling primarily in the alluvial sediments on Martins Bend. The aim was to determine aquifer properties, confirm water table gradients toward the river...-
Document
Published: 01 Oct 1986
-
RB 86/00086 Bowmans coal deposit. 1986 drilling programme data report.
Drilling within preferred mining area of the deposit was undertaken to obtain coal quality and tonneage data.18,100 mm diameter cored holes (554 metres) and 18 open holes (3138 metres) were drilled to delineate optimum mining area (6529 : 4 MW558 -...-
Document
Published: 01 Nov 1986
-
RB 87/00060 Hallet Brick Landfill Pty Ltd solid waste disposal site, Saint Agnes.
Site of relatively high groundwater pollution potential has been rendered safe because of thorough leachate collection, treatment and disposal system designed for the then proponent by its consultant. The site is located within shallow (less than 40...-
Document
Published: 01 Mar 1987