-
Orroroo. Progress reports to licence surrender for the period 18/11/1971 to 28/9/1972.
In a continuation of diamond and base metal exploration of newly discovered carbonatite / kimberlite intrusive bodies in an area located immediately north of Orroroo, these bodies were examined petrographically and analysed to compare their...-
Document
-
Wynbring [Siding]. Data release made in lieu of submitting a first partial surrender report upon licence expiry/renewal : annual reports for the period 30/8/2004 to 29/8/2009.
An area located approximately 160 km north-northwest of Ceduna is being explored for possible economic nickel-copper-platinum group metal magmatic mineral deposits, which may have formed within Archaean to Proterozoic basement rocks in a geological...-
Document
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-50, Black Hill JV Project area mafic/ultramafic intrusion - hosted nickel sulphide mineral prospects. Project interim and final reports.
In the area of the Black Hill Cambro-Ordovician layered basic intrusive complex located between Cambrai, Swan Reach and Florieton, Inco Resources identified six geophysical (density contrast and magnetic) anomalies, interpreted as being closely...-
Document
Published: 06 Dec 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Frome River (part of the Copley Ni/Cu Project). Annual, partial surrender and final reports to licence expiry/full surrender, for the period 9/10/2006 to 8/10/2009.
In a search for possible Voiseys Bay style magmatic nickel-copper mineralisation within an area of historical small scale surface mining activity located approximately 60-70 km north-east of Leigh Creek, the licensee conducted a brief campaign of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 1909
-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
Koppio. Annual reports and final report to licence full surrender, for the period 6/1/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments, BLEG soils, and rock chips, targeted possible Thompson Belt - type nickel-copper and precious metal mineralisation hosted by Lower Proterozoic Hutchison Group metasediments in an area 40 km...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Sheringa. Annual reports for the period 16/12/2006 to 31/3/2019.
No field work was done on the subject renewed EL 5455 during Years 11 through 15. Geophysical data were further assessed with a view to selecting possible future drill targets.-
Document
-
Data release - as updated : Lock. Annual reports plus final report to licence's full surrender, for the period 16/12/2008 to 13/4/2017.
No field work was done during all of licence Years 6 to 13, until the tenement was eventually surrendered. An office -based assessment was performed on ground geophysical data collected during the earliest years of tenure, allowing some new targets to...-
Document
Published: 28 Mar 1917
-
Data release - as updated : Brooker (part of the Brimpton Lake Project). Annual reports to licence expiry/full surrender, for the period 12/6/2003 to 24/8/2018.
Exploration Licence 3096 “Brooker” covering an area of 682 square km lies east of Elliston on the Eyre Peninsula in South Australia. It is one of three adjacent tenements that form the “Brimpton Lake Project”; the other two are EL 2662 (initially...-
Document
-
Data release - as updated : One Tree Hill (part of the Manna Hill Project). Annual reports and final report to licence expiry/full surrender, for the period 5/11/2007 to 4/11/2017.
Exploration for possible economic vein-style and structurally controlled gold with Adelaidean bedrock sediments in an area located between the towns of Yunta and Manna Hill was conducted using low cost remote sensing, geochemical and geophysical...-
Document
Published: 15 Dec 1917
-
Data release - as updated : Benda Range (part of the Manna Hill Project). Annual reports and final report to licence full surrender, for the period 6/5/2008 to 14/12/2017.
Exploration for possible economic vein-style and structurally controlled gold with Adelaidean bedrock sediments in an area located south of Manna Hill township was conducted using low cost remote sensing, geochemical and geophysical methods. The...-
Document
Published: 15 Jan 1918
-
The Hummocks. Annual reports and final report to licence full surrender, for the period 30/6/2009 to 17/8/2017.
EL 4278 was Southern Uranium's first mineral exploration foray into the northern Yorke Peninsula. The subject tenement was pegged in January 2009 in order to secure ground surrounding the northern reaches of the Pine Point Fault. This particular...-
Document
Published: 31 Aug 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Data release [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports to licence expiry/renewal, for the period 17/2/2005 to 16/2/2010.
Tasman Resources is exploring an area that is centred about 78 km north-west of Tarcoola for possible economic buried occurrences of sedimentary roll front style uranium in Tertiary palaeochannels and nickel mineralisation in Archaean -...-
Document
Published: 19 Apr 1910
-
Fig Tree Corner. Second partial surrender report, for the period 10/3/2005 to 4/4/2019.
Most of a sizeable licence area located on SA's Far West Coast, which formerly extended for 10 to 90 km inland from the vicinity of Bookabie, has now been partially relinquished owing to its perceived diminished prospectivity for Tertiary marine...-
Document
Published: 12 Apr 1919
-
Poondinga. Third partial surrender report, for the period 27/10/2004 to 4/4/2019.
309.6 square km or ~18.77% of the pre-existing area of EL 5564 Poondinga was partially relinquished on 19/2/2019 because in the licensee's view this south-eastern portion of the licence are does not appear to exhibit the geological features required...-
Document
Published: 12 Apr 1919