-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 2012
-
Western Gawler Project. Final report, Magneto Telluric, Passive Seismic and Magnetic Modelling Study. Project ADI RD02-296 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises geophysical studies conducted by Western Areas between October 2021 and October 2022, under the ADI Agreement ADI: RD02/296-GP Magneto Telluric (MT), Passive Seismic and Magnetic Modelling Study. The discovery of magmatic Ni-Cu...-
Document
Published: 06 May 2023
-
Kalabity. Final report, Project ADI RD02-266 [Accelerated Discovery Initiative Round 2, 2022].
On 19th May 2021 Sinosteel SA secured ADI funding to carry out the comprehensive Curnamona Geochemical Sampling Program utilising the skills of the in-house geologist together with academic research collaboration to perform rigorous geochemical...-
Document
Published: 31 Aug 2022
-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill area (the Eaglehawk Joint Venture Project). Annual reports for the period 22/6/2012 to 21/6/2017.
An area centred ~115 km south-west of Coober Pedy is being explored for possible economic buried precious and/or base metal mineralisation (including iron ore) that may exist in predominantly buried Archaean or younger Proterozoic basement rocks, as...-
Document
Published: 29 Aug 2017
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-18 - Phoenix Copper Limited Yorke Peninsula Project. Drilling project final report.
Phoenix Copper is exploring tenements which cover an area of approximately 802 square km on the west coast of the Yorke Peninsula, the company's prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit...-
Document
Published: 13 Nov 2012
-
Murray Basin. Final report, Project ADI RD02-289 [Accelerated Discovery Initiative Round 2, 2022].
Hillgrove Resources Ltd (HGO) has identified a large number of geophysical targets through the south-east Cambro-Ordovician basement of South Australia prospective for Cu-Au mineralisation and covered by the Tertiary-Quaternary Murray Basin sediments....-
Document
Published: 12 Sep 2022
-
Commonwealth Hill Station - East (part of the Commonwealth Hill Project). First partial surrender report, for the period 2/7/2007 to 1/7/2017.
Five small portions of the subject licence, with a combined total area of 143 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 2017
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-34 - Coober Pedy district, Mabel Creek High, Cyclops geophysically anomalous Mesoproterozoic basement IOCG type Au & base metal prospect. Drilling final report
The Cyclops prospect is located approximately 145 km west-southwest of Coober Pedy and ~58 km north of the Challenger mine, along the common boundary between ELs 4891 and 4892, two exploration tenements held by Teck Australia Pty Ltd which were...-
Document
Published: 02 Oct 2015
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 2006
-
Reaphook Hill and Mount Frome (a tenement group having amalgamated expenditure commitments, which is part of the Flinders Ranges Project). Joint annual reports for the period 4/8/2001 to 1/7/2015.
During the third year of exploration nominally ending on 1/7/2002 [and subsequent to the starting date of 5/3/2002 for the application of provisions of the Flinders Ranges Project's multi-tenement Amalgamation of Expenditure Agreement (AEA), whence...-
Document
Published: 07 Aug 2015
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 2003
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 2012
-
RB 2013/00021 Reconnaissance LA-ICPMS zircon U-Pb geochronology from samples from the central-northern Gawler Craton.
The laser ablation - inductively coupled plasma mass spectrometry (LA-ICPMS) U-Pb zircon geochronology data reported herein derive from three rock samples sourced from the central - northern Gawler Craton, South Australia. These samples have been...-
Document
Published: 01 Jan 2013
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
RB 2005/00008 Age, Origin and Emplacement of the Oodla Wirra Volcanics
A field mapping project was set up by PIRSA to investigate the age, origin and emplacement history of newly discovered [by Goldstream Mining NL on EL 2222] volcanic rocks within the Mount Grainger Anticline, close to the town of Oodla Wirra. Outcrop...-
Document
Published: 01 Jun 2005
-
RB 2002/00036 Draft report on the structure and lithostratigraphy of the Ameroo Hill area, Olary Domain, South Australia
Approximately 30 square km of outcrop of Palaeoproterozoic basement rocks in the vicinity of Ameroo Hill were geologically mapped by the author at 1:10,000 scale, with the aim of identifying meso- and macroscopic rock structures and lithologically...-
Document
Published: 27 Jun 2002
-
RB 2006/00020 Compilation of SHRIMP U-Pb geochronological data for the Gawler Craton, South Australia, 2006
This report book contains zircon - derived U-Pb geochronological data, which was obtained between January 2005 and April 2006, for basement rock samples taken from the Gawler Craton of South Australia. The data has been generated as part of the...-
Document
Published: 01 Nov 2006
-
RB 2006/00021 Tectonics of the southeastern Gawler Craton, South Australia: A field guide to the Palaeoproterozoic gneisses of Corny Point, Yorke Peninsula
This field guide presents an introduction to the geology and tectonics of the south-eastern Gawler Craton, particularly as observed at the Corny Point locality. Topics covered include the detrital zircon age distributions within the Corny Point...-
Document
Published: 01 Dec 2006
-
RB 2006/00004 Crustal evolution of the Gawler Craton, South Australia: Application of the TerraneChron technique to detrital zircon from modern stream sediments.
This report presents the results of a Terranechron [registered brand name for this proprietary technique] study of detrital zircons from modern stream sediments of the Gawler Craton. The Terranechron approach involves obtaining uranium - lead decay...-
Document
Published: 01 Feb 2006
-
RB 2006/00005 The Southern Australian Archaean-Proterozoic Synthesis: Developing tectonic frameworks to assist mineral exploration. Abstract volume.
Includes abstracts with the following titles: 1) How magnetotellurics (MT) works, and an overview of new central Australian MT results (Kate Selway) 2) Latest MT traverse results: western Gawler Craton (Stephan Thiel) 3) A constrained 3D...-
Document
Published: 01 Feb 2006