-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-46, western Gawler Range Volcanic Province mineral prospects. Project interim and final reports.
An area of the Gawler Range Volcanic Province that straddles the southern portion of the Yarlbrinda Shear Zone, 80 km south of Kingoonya, and which contains mylonitised and sericite-altered Palaeoroterozoic intrusive rocks, was the target for three...-
Document
-
Childara Well. Annual reports and final report to licence expiry/full surrender, for the period 19/2/2004 to 18/2/2009.
An area lying along the south-western margin of the Gawler Ranges has been explored by Minotaur Resources to assess the economic iron oxide - associated copper-gold mineralisation (IOCG) potential of near-coincident gravity and magnetic anomalies that...-
Document
Published: 23 Mar 1909
-
Kimba. Third partial surrender report submitted at licence expiry/renewal, for the period 6/11/2006 to 5/11/2016.
63 square km or 23% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
-
Kimba. Second partial surrender report, for the period 6/11/2006 to 5/11/2015.
112.3 square km or 29% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
Published: 07 Dec 1915
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Data release [made at SA Director of Mines' discretion] : Caralue and Kimba (the Ellemby Project, prior to inclusion as part of the East Eyre Peninsula Project). Joint annual reports for the period 6/11/2007 to 5/11/2010.
Two adjacent areas which are respectively centred near and to the south-west of Kimba are being explored for buried basement-hosted gold and nickel mineralisation, and, following establishment of a joint venture, for possible IOCG type deposits and...-
Document
-
Mount Granite. Information status at licence expiry/full surrender, for the period 27/3/2014 to 26/3/2016: no work performed.
There is no abstract created for this record-
Document
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Cooria Hill. Annual and final reports to licence expiry/full surrender for the period 1/12/2005 to 30/11/2010.
Exploration for possible epithermal / hydrothermal gold and/or IOCG drilling targets within an area located about 120 km north-east of Streaky Bay, on the north-eastern side of the Gawler Ranges near Lake Acraman, aimed at testing prominent...-
Document
Published: 27 Jan 1911
-
Kimba. First partial surrender report, for the period 6/11/2006 to 5/11/2013.
321 square km of the former area of EL 4938 has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’ resistance to mineral exploration....-
Document
Published: 23 Jan 1914
-
Deception Hill. Annual reports and final report to licence full surrender, for the period 26/10/2004 to 9/10/2013.
The iron oxide - associated copper-gold (IOCG) mineralisation potential of an area centred ~20 km south of Tarcoola, which appeared to contain untested but interesting gravity and soil geochemical anomalies, was investigated by Minotaur to try to...-
Document
Published: 28 Oct 1913
-
Yellabinna. Combined fifth annual / final report at licence expiry/full surrender, for the period 24/5/2005 to 23/5/2010.
Mineral exploration conducted in an area centred approximately 70 km west of Ceduna has addressed targets including sediment-hosted uranium, possibly present either in Tertiary to Permian palaeochannels or in the tectonically controlled Mulgathing...-
Document
Published: 23 Aug 1910
-
Data release - as updated : Kimba. Annual reports to licence expiry/full surrender, for the period 6/11/2006 to 5/11/2018.
A large, 705 square km area surrounding Kimba township was taken up to explore for possible economic buried deposits of Mount Isa or Broken Hill style base metals (Cu-Pb-Zn-Ag), and Tanami style lode gold. The licence lay in the northern part of the...-
Document
Published: 09 Jan 1919
-
Hope Downs. Information status at licence surrender, for the period 7/7/2014 to 27/8/2015: no work performed.
There is no abstract created for this record-
Document
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 1917
-
Data release - as updated [made at SA Director of Mines’ discretion] : Rounsevell Hill, Yellabinna and Mulgathing Homestead (the Ambrosia Project). Joint annual reports for the period 24/5/2005 to 1/6/2015.
Some large areas of vacant ground located in the south and west of Mulgathing Station that lie adjacent to the Bulgunnia Fault Zone were taken up by Monax Mining initially to explore primarily for Olympic Dam type IOCG-U mineralisation and also for...-
Document
Published: 06 Oct 1915
-
Moongi (part of the East Eyre Peninsula Project). First annual plus final report to licence full surrender, for the period 1/5/2013 to 5/9/2014.
A tiny licence area located near Buckleboo, ~37 km north of Kimba, has been explored for possible economic buried epithermal Paris style silver and base metals, and/or gold and/or uranium mineralisation, that may have formed in Archaean to...-
Document
Published: 24 Nov 1914
-
Mulgathing (part of the Woomera Iron Ore Project). Annual reports and final report to licence expiry/full surrender, for the period 22/6/2012 to 21/6/2016.
An area centred about 100 km north-west of Tarcoola has been explored principally for buried economic iron ore formed within Paleoproterozoic BIF strata and also for iron oxide - associated copper-gold (IOCG) mineralisation, while the central portion...-
Document
Published: 29 Jul 1916
-
Nuckulla Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/10/2002 to 28/11/2008.
Exploration for possible buried Ernest Henry or Olympic Dam style copper-gold mineralisation in the Nuckulla Hill area, 120 km north-east of Ceduna, did not progress during the first two years of tenure due to uncertainties in selecting a new remote...-
Document
Published: 22 May 1909