-
Callanna and Marree areas (Marree West Project). Combined first annual/final report to licences' expiry/full surrender for the period 22/10/2007 to 21/10/2008.
Exploration for possible economic buried sedimentary uranium mineralisation, thought to be associated with an interpreted palaeodrainage EM anomaly originating within Mesozoic or Tertiary strata in two areas near Marree, addressed the potential for...-
Document
-
Algebuckina and Peake [Algebuckina South]. Third and second partial surrender respectively : reports for the period 3/8/2004 to 2/8/2009.
Data from part of a heliborne EM survey conducted in September 2007 over the now relinquished portions of EL 3226 has been released. This survey was flown in a search for possible stratabound roll-front style or palaeochannel hosted sedimentary...-
Document
Published: 12 Mar 1910
-
Phar Lap Outstation. First partial surrender report for the period 27/8/2007 to 26/8/2010.
An area located at the south-eastern end of the Lake Phillipson Trough in the Arckaringa Basin has been taken up primarily to investigate potential palaeochannels containing lignites or pyritic sands of both Permian and Mesozoic age, which it is...-
Document
Published: 13 Dec 1910
-
Mundowdna, Wilpoorinna, Dalarinna Hill and Calcutta (the Marree Project). Combined annual reports plus final reports to licences' respective expiry or surrender, for the period 21/6/2006 to 29/5/2014.
The Marree Project consists of four adjacent exploration licences, ELs 3574, 3577, 3578 and 3579, which together cover 3909 square km. Work performed on the project was governed by the Eromanga Basin joint venture agreement made between Eromanga...-
Document
Published: 30 May 1914
-
Billa Kalina, Welcome Creek, Millers Creek, Margaret Creek and Francis Swamp (the Billa Kalina G2 Diamond Project). Data release made at remaining licences' joint partial surrender: joint annual reports for the period 25/2/2006 to 29/8/2012.
As part of continuing diamond exploration on the subject five licences, more of the first pass sampling program was completed by Flinders Diamonds in August 2006 via aircore drilling of 47 vertical holes for an aggregate 1852 m aimed at penetrating to...-
Document
Published: 10 May 1912
-
Mount Kingston East Areas 1 and 2, and Mount Harvey (the Denison Range Project). Joint annual reports to licences' expiry/full surrender, for the period 13/12/2010 to 12/6/2013.
The three Denison Range Project tenements, centred approximately 70 km south-east of Oodnadatta, which cover alluvial plains formed adjacent to the south-eastern edge of said range of hills that comprise eroding Palaeo- to Mid-Proterozoic uranium-rich...-
Document
Published: 22 Jul 1913
-
Calcutta (subject to the Marree JV Project). First partial surrender report at licence expiry/renewal, for the period 21/6/2006 to 20/6/2011.
An area located along the southern margin of the Eromanga Basin 53 km east-northeast of Farina, which is crossed by part of the Strzelecki Track, has been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones,...-
Document
-
Algebuckina. Fifth partial surrender report, for the period 3/8/2004 to 28/9/2012.
Portions of the subject licence located at the northern end of the Peake and Denison Ranges have been relinquished owing to their perceived lower exploration potential. All of the reported work that was done within these licence portions pertains to...-
Document
Published: 12 Oct 1912
-
Galaxy Tank (part of the Central Gawler Project). Annual reports to licence expiry/full surrender, for the period 22/3/2006 to 10/5/2013.
Tasman Resources' ("Tasman") Central Gawler Project tenement acreage, originally comprising seven exploration licences ELs 3339 to 3345, was initially applied for on the basis of perceived prospectivity for diamonds: however, following Tasman's...-
Document
Published: 16 Jul 1913
-
Lake Younghusband. Annual reports and partial surrender reports to licence expiry/full surrender, for the period 5/12/2005 to 4/12/2009.
An area located approximately 30 km east of Glendambo was taken up to explore primarily for possible economic buried sedimentary uranium mineralisation within the Tertiary cover sequence, and secondarily for possible unconformity - related uranium...-
Document
Published: 14 May 1910
-
Welcome Creek (part of the Billa Kalina JV Project). First partial surrender report for the period 19/5/2005 to 18/5/2009.
Late in 2007 joint venturer Eromanga Uranium conducted part of a combined airborne TEM and magnetic survey across the entire licence area, using a Eurocopter Squirrel helicopter with the TEM towed array suspended at a nominal height above ground of 30...-
Document
-
Peake. Fourth partial surrender report, for the period 3/8/2004 to 28/9/2012.
Portions of the subject licence located at the southern end of the Peake and Denison Ranges have been relinquished owing to their perceived lower exploration potential. All of the reported work that was done within these licence portions pertains to...-
Document
Published: 12 Oct 1912
-
Francis Swamp and Margaret Creek (part of the Billa Kalina G2 Diamond Project). Data release made upon the full surrender of subsequent licences: annual reports and combined annual reports to licences' joint renewal, 13/10/2000 to 12/10/2005.
Exploration for possible commercial diamond deposits has been carried out along a portion of the G2 gravity lineament located immediately south of William Creek and the southern Peake and Denison Ranges, looking for inferred diamondiferous kimberlite...-
Document
Published: 06 Jun 1907
-
Enungarenna Hill, Mount Treloar and Lambina (the Abminga East Project). Joint annual reports plus final reports to licences' respective surrender, for the period 22/10/2007 to 9/12/2011.
Exploration targeting possible economic sedimentary, roll front - style uranium mineralisation which might have formed in buried palaeochannels within the Mesozoic Eromanga Basin along its western margin, approximately 115 km north-east of Marla,...-
Document
Published: 06 Feb 1912
-
Margaret Creek and Francis Swamp (part of the Billa Kalina Project). Joint first partial surrender report, for the period 23/2/2006 to 22/2/2009.
Within the now relinquished portions of the subject licences, as part of a regional search across several tenements in the Billa Kalina district for possible kimberlites or diamonds, Flinders Mines carried out scout exploratory drilling in two...-
Document
-
Boundary Dam. First partial surrender report, for the period 20/7/2007 to 19/7/2010.
A small licence area taken up approximately 130 km north of Marla, near the SA/NT state border, is being explored for possible economic secondary uranium mineralisation formed in sandstone or calcrete. Prior to Tianda Resources deciding to apply for...-
Document
Published: 27 Sep 1910
-
Algebuckina. Fourth partial surrender report, for the period 3/8/2004 to 28/9/2010.
Three now relinquished licence portions located along the western margin of the Denison Inlier have been explored for possible economic stratabound roll-front style or palaeochannel hosted sedimentary uranium deposits, inferred as likely to have...-
Document
Published: 01 Feb 1911
-
Peake. Annual reports and final report to licence expiry/full surrender, for the period 3/8/2004 to 28/9/2014.
An area located to the west and south of the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, has been explored for possible roll-front style sedimentary uranium deposits...-
Document
Published: 01 Oct 1914
-
The Lake Eyre Project. Joint first annual report plus final report to project licences' joint full surrender, for the period 3/5/2011 to 7/3/2013.
A large area surrounding the southern end of Lake Eyre, which is known to be underlain by a thinning succession of Cretaceous basinal sediments, was taken up to explore for possible economic secondary sandstone-hosted uranium mineralisation. No field...-
Document
Published: 27 Mar 1913
-
Mulga Well. Annual reports to licence expiry/full surrender, for the period 22/6/2004 to 21/6/2009.
An area located close to the western margin of the Stuart Shelf, approximately 90-120 km south-west of the Olympic Dam deposit, and extending parallel to it for 65 km, was taken up by Marathon Resources (Marathon) to explore for possible economic IOCG...-
Document