-
Mikkira. Final report at licence surrender, for the period 2/3/1981 to 27/10/1987.
Exploration for graphite and base metals in the Uley - Mikkira region, south-west of Port Lincoln, comprised an aerial INPUT / magnetic / radiometric survey, with ground EM34-3, magnetic, SP and IP surveys to follow-up INPUT responses. 4 EM anomalies...-
Document
Published: 30 Nov 1987
-
Moseley Nobs (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/3/2008 to 22/11/2019.
A small area originally comprising three separate parts centred ~20 km north of Kimba on northern Eyre Peninsula has been explored for possible economic Middleback Range type stratabound BIF hosted iron ore, for shear-hosted or Menninnie Dam style...-
Document
Published: 06 Dec 1919
-
Cootra. Progress and final reports to licence surrender for the period 25/11/80 to 28/3/84.
Pioneer exploration for possible stratabound base metal deposits that have a facies relationship to metamorphic iron deposits, which was carried out in the Cootra area, located 20 km east south-east of Warramboo on central Eyre Peninsula, has...-
Document
Published: 09 Apr 1984
-
Teetulpa, Wattle Dam and Manna Hill. Progress and final reports for the period 24/3/86 to 23/12/86.
Exploration which was centred on the Teetulpa and Mannahill gold fields comprised intensive geochemical sampling (rock chip, soil, stream sediment, battery slimes and mine dumps) and IP, Sirotem and ground magnetic surveys. Several significant gold...-
Document
-
Mount Gawler. Progress reports to licence expiry/full surrender for the period 27/5/1983 to 26/5/1988.
TARGET: Evaluation of the Koppio and Kookaburra Gully graphite prospects on southern Eyre Peninsula. EXPLORATION: Prospect gridding, 1:1000 scale geological mapping, orientation Max-Min II ground EM surveys, extensive trenching and channel sampling,...-
Document
-
Statement of proposed mining operations and Declaration of Environmental Factors for the Uley graphite mine, South Australia.
There is no abstract created for this record-
Document
Published: 01 Jan 1988
-
Carpie Puntha and Peterlumbo. Joint second partial surrender report, for the period 14/2/1989 to 13/2/1992. Plus: Carpie Puntha and Waddikee. Joint final report to licences' expiry/renewal, for the period 14/2/1989 to 24/6/1992.
TARGET: Possible commercial Menninnie Dam type stratabound or stratiform base metal deposits in the Cowell - Kimba - Buckleboo region. EXPLORATION: Field reconnaissance and rock chip geochemical sampling of prospective areas identified from...-
Document
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Waddikee. Annual reports for the period 24/5/2010 to 31/1/2018.
During licence Year 6, on renewed EL 4662, Monax and its JV earn-in partner OMM undertook auger soil geochemical sampling, ground magnetic and IP surveys, and exploratory drilling in their continuing search for economic iron ore and manganese...-
Document
-
Data release - as updated - Cowell (latterly part of the Cowell JV Project). Annual reports and final report to licence expiry/full surrender, for the period 7/11/2011 to 6/11/2017.
During licence Year 10 to 6th November 2012, exploration work undertaken by JV partner Renaissance Uranium (RNU) comprised the drilling of five rotary mud-diamond drill holes targeting five local geophysical anomalies within the Glensea Prospect,...-
Document
Published: 15 Nov 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Verran and Malbrom (the Verran Project, then the Arno Graphite Project). Joint annual reports plus annual report, for the period 29/1/2014 to 28/1/2019.
Two licence areas together covering the hinterland to Arno Bay and Port Gibbon on eastern Eyre Peninsula, and extending as far north-westwards as Rudall, are being explored for economic buried graphite deposits that may have formed in deformed high...-
Document
-
EL 6789, EL 6790, EL 6791 - First and Final Technical Reports from 27/06/2022 to surrender 13/06/2024.
The tenement group consists of EL 6789 (234 km2) granted to Open Minerals Pty Ltd (subsidiary of Pinnacle Minerals), EL 6790 (300 km2) grated to Pegasus Prospecting Pty Ltd (subsidiary to Pinnacle Minerals), and EL 6791 (517 km2) granted to Titan...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 1918
-
Wirrabara. Progress and final reports to licence expiry for the period 5/9/78 to 4/9/80.
EL 417 Wirrabara was secured by CRA to investigate previously untested aeromagnetic, induced polarisation and resistivity anomalies in the Wirrabara - Charlton area, and a reported kimberlite at Bangor. Work has consisted of: - 3 line km of IP...-
Document
Published: 01 Aug 1980
-
Bull 037 Geology and Mineral Resources of Southern Eyre Peninsula
A regional geological survey covered 15 standard 1-mile map sheets. Detailed mapping established a 50 000 ft sequence of Archaean sedimentation of gneissose, schistose and granitoid rocks, migmatite, quartzite, dolomite and haematitic quartzite. These...-
Document
-
Bull 013 Pigment Minerals in South Australia
During the past twenty years attention has been directed to the natural resources of the State in pigment materials, and a considerable body of information, based 011 official reports, has been accumulated, which is now collected into this Bulletin,...-
Document
-
MR 001 Short review of mining operations in the State of South Australia during the year 1903
The total value of South Australian mineral production during the year 1903 maybe estimated at £520,000 Articles include: Copper: Paramatta and Yelta mines; Burra Mine; Kapunda mine Gold: the most important gold-mining district during the past year...-
Document
-
SP 003 Mining in South Australia - A Pictorial History
In recognition of the centenary of Henry Yorke Lyell Brown's appointment as the first Government Geologist for South Australia, and the foundation of the Department of Mines and Energy, aspects of South Australia's colourful and vital mining and...-
Document
-
RB 66/00078 Report on Darke Peak copper prospect, section 28 Hd Campoona.
At the Darke Peak copper prospect there are minor concentrations of copper in thin shears parallel to the rock layering. The copper occurs near the surface as malachite and azurite in thin veins (average thickness 1 foot) having near vertical dip. No...-
Document
Published: 01 Jan 1968