-
Copperlinka. Progress and annual reports plus final report to licence expiry/full surrender, for the period 16/4/1991 to 6/6/1997.
Exploration for possible large, potentially open cut - mineable disseminated quartz vein - type syngenetic gold and base metal deposits within a licence area located near Outalpa, 150 km south-west of Broken Hill, has comprised geological mapping,...-
Document
-
RB 97/00051 Poona copper mine, Moonta, South Australia - Investigation of alteration mineralogy using short-wave infrared analysis.
The Poona Copper Mine on northern Yorke Peninsula, South Australia, was worked from 1988-92 on an extension of the original Poona lode, a narrow, shear-hosted copper sulphide vein deposit in Moonta Porphyry of Mesoproterozoic age. The orebody is...-
Document
Published: 01 Nov 1997
-
Tarcoola - Tallaringa Bedrock Drilling Project.
Archaean, Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
-
Unalla Hill, Moonaree and South Lake Gairdner (Lake Gairdner Project). Annual and final reports for the period 25/10/96 to 24/10/99.
Exploration targeted Olympic Dam style mineralisation associated with Hiltaba Suite intrusives and Gawler Range Volcanics at the southern end of Lake Gairdner, between Mount Ive and Moonaree. Sampling of poorly developed calcrete together with rock...-
Document
Published: 02 Dec 1998
-
Mount Chandler (Musgrave Ranges Project). Annual and final reports for the period 11/11/1996 to 10/11/1999.
Cu-Au-U prospects associated with shear zones and Kulgeran age granites have been identified in an area approximately 60 km north-west of Marla. Best assay results were obtained from the Indulkana Shear Zone, where rock chip sampling returned up to...-
Document
-
Yardea. Annual reports to licence expiry/full surrender, for the period 7/6/1996 to 6/6/1998.
Regional calcrete geochemical sampling carried out approximately 140 km north-east of Streaky Bay has outlined a northeasterly-trending 5 km x 1.5 km area containing weakly anomalous gold values of 3-9 ppb Au (Toondulya prospect), which appear to be...-
Document
-
Moseley Nobs (part of the Wilcherry Project). First partial surrender report, for the period 23/3/2017 to 22/3/2019.
The easternmost and westernmost thirds (portions totalling ~52%) of the former area of EL 5931, located approximately 30 km north of Kimba, have been relinquished due to their perceived diminished prospectivity for economic buried occurrences of...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Pinkawillinie (part of the Wilcherry Project). Final report at licence full surrender, for the period 1/11/2012 to 10/4/2019.
An area originally consisting of three separate licence sub-blocks that are centred ~30 km north-west of Kimba has been explored for possible economic buried occurrences of basement-hosted epithermal/hydrothermal/metamorphic gold, silver, iron,...-
Document
-
Midgerie, Barton South and Mount Christie. Joint first partial surrender report, for the period 13/4/1981 to 29/9/1991.
TARGET: Diamonds in the Tallacootra - Barton - Wynbring region; precious and base metals (explored for by joint venture partners). EXPLORATION: Diamonds : Evaluation of targets generated by interpretation of an airborne magnetic-radiometric-VLF-EM...-
Document
-
Mining leases - Data.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Anabama North and Anabama (the Anabama JV Project). Data release made at licences' joint full surrender: joint annual reports for the period 1/5/2008 to 18/12/2014.
An area centred ~50 km south-east of Manna Hill township on the Barrier Highway was taken up to explore for possible economic buried epithermal, VHMS style copper-gold or other base and precious metal mineralisation which could have formed within...-
Document
-
Ulooloo. Progress reports and final report to licence full surrender, for the period 29/7/1986 to 6/3/1989.
TARGET: Economic fine-grained, Telfer style gold mineralisation occurring as syngenetic stratabound deposits formed in sedimentary basins during or soon after periods of basin subsidence and instability. The eastern limb of the large, overturned...-
Document
Published: 22 Feb 1989
-
Mount Grainger. Progress reports to licence expiry/full surrender, for the period 20/8/1986 to 19/2/1988.
TARGET: Stratabound gold, or hydrothermally altered vein stockwork copper-gold mineralisation that commonly is structurally emplaced within folded, brittle fractured competent Adelaidean metasedimentary units, in an area 20 km east of Peterborough....-
Document
Published: 01 Mar 1988
-
Midgerie, Barton South, Immarna, Barton Siding, Mount Christie Siding, Lake Bring, Mulgathing, Wynbring (TARCOOLA and BARTON 1:250k mapsheets region). Joint progress reports and final reports, for the period 11/4/1981 to October 1990.
Stockdale's exploration for diamonds in the Barton region, at the start of the licence period, commenced with the evaluation of 136 potential kimberlite targets generated by the detailed in-house interpretation of data acquired from an extensive new...-
Document
-
Kalabity. Data release in lieu of partial relinquishment at licence expiry/renewal : progress reports, and successive joint venturers' final reports, for the period 6/10/1978 to 14/3/1988.
This release details exploration conducted between 1978 and 1988 for uranium, base and precious metals in the Early Proterozoic rocks of the Willyama Complex, north of Olary. Initial work on searching for uranium included airborne helicopter...-
Document
-
Bimbowrie Hill. Progress reports to licence surrender for the period 22/10/1973 to 8/6/1976.
Exploration for possible economic stratiform, Broken Hill type base metal deposits hosted within Willyama Complex metasediments in the Bimbowrie Hill - Ameroo Hill area has consisted of a structural interpretation of aerial photos and ERTS imagery,...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Everard West (part of the Gawler Craton Joint Venture, and latterly part of the Tunkillia JV Project). Annual & surrender reports for the period 7/6/1996 to 18/05/2021.
An area with poor basement outcrop located approximately 60 km south of Tarcoola, which largely lies within the north-eastern corner of the Yellabinna Regional Reserve, is being explored primarily for possible economic fault or breccia-hosted...-
Document
-
Glenloth (part of the Tarcoola Joint Venture Project). First partial surrender report, for the period 11/7/2003 to 2/11/2009.
When exploring for nickel sulphide mineralisation within buried ultramafic rocks of the Archaean Lake Harris Greenstone Belt, over TEMPEST aerial EM anomalies lying ~16 km north-west of Yerda Outstation, Mithril Resources carried out a ground EM...-
Document
-
Lake Gilles - Uno [Range] area. Annual reports and final report to licence expiry/full surrender, for the period 11/2/2001 to 28/9/2010.
Exploration of an area abutting the northern side of Lake Gilles, and located in the vicinity of the major Uno Fault structure and the Gawler Ranges volcanic province, 70 km north-west of Whyalla, has sought to find economic epithermal/hydrothermal,...-
Document