RB 58/00031 Geological investigation of a quartzite deposit, section 147, Hundred of Lincoln.
200,000 tonnes of ballast are required by the BHP Co. to construct a proposed tramway that will connect the calcareous sand deposits of Coffin Bay with its bulk loading installation being constructed at Proper Bay, 3 miles south-west of Port Lincoln....-
Document
Published: 10 Feb 1964
-
RB 45/00118 Final report on iron ore prospecting, Corunna area, Iron Knob district.
In an area of limited basement outcrop located between 2 and 5 miles north-northwest of Iron Knob township, the Department's surface traverse channel sampling (969'), percussion boring (643’) and diamond drilling (1270’) tested a low grade...-
Document
Published: 04 Dec 1957
-
RB 79/00121 Uranno microgranite deposit for road sealing aggregate and rail ballast.
A quarry plan, designed to yield 100,000 cubic m of in-situ material, has been outlined in a microgranite outcrop on Eyre Peninsula which is located 15 km east of Cummins and 10 km south-east of the Uranno railway siding. Diamond drilling (3 inclined...-
Document
Published: 01 Oct 1979
-
Lipson Cove - Tumby Bay area. Annual and final reports to licence expiry/full surrender for the period 2/9/2004 to 1/9/2008.
Geological mapping of an historically worked lamellar talc occurrence in the Tumby Bay area showed that snow white, finely flaky talc is present over a 2 km strike length within two beds of isoclinally folded schistose dolomitic limestone, but is of...-
Document
-
Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.
A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...-
Document
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Carappee Hill. First, second and third partial surrender report, for the period 1/2/2016 to 31/01/2021.
Two separate blocks together comprising 164 square km or ~10% of the former area of EL 5877 have been relinquished. No work was done on them. The ground had been taken up primarily to explore for possible economic graphite mineralisation which could...-
Document
-
Mikkira (south-west of Port Lincoln). Progress reports to licence expiry/full surrender for the period 2/3/1981 to 27/10/1987.
Exploration for graphite primarily, and secondarily for BIF-associated massive base metal sulphides, in the area surrounding the historic Uley graphite mine situated 15 km west south-west of Port Lincoln, initially comprised an airborne reconnaissance...-
Document
Published: 30 Oct 1987
-
Gilles Downs. Progress reports to licence expiry/renewal (as part of a larger area), for the period 12/3/1979 to 11/3/1981.
Ongoing diamond exploration by Stockdale over the PORT AUGUSTA 1:250,000 mapsheet area has concentrated on country to the east and south-east of Lake Gilles, where some microdiamonds and kimberlitic indicator minerals were discovered during the period...-
Document
Published: 18 Mar 1981
-
Elbow Hill. Information status at licence surrender, for the period 12/4/2013 to 29/5/2014: no work performed.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines’ discretion] : Uley graphite deposit. Proposed open cut mine and ore processing plant. Mining study reports submitted during 1988.
Formal mining proposal documents submitted to PIRSA for approval as part of the process of re-opening the Uley graphite mine to sustain a planned 10 years duration open pit mining operation.-
Document
Published: 01 Jan 1988
-
Pondooma / Ironstone Hut (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/12/2002 to 24/9/2015.
An area originally granted as Exploration Licence 3048 Pondooma, which consisted of two separate sub-blocks centred ~60 km south-west of Whyalla, was applied for to cover a poorly exposed belt of banded iron formation (BIF) strata identified on...-
Document
-
Rudall. Annual reports and final report to licence expiry/full surrender, for the period 24/5/2012 to 23/5/2017.
A small area centred ~ 19 km west-northwest of Cleve was taken up primarily to explore for possible economic buried graphite mineralisation that might have formed within highly metamorphosed bedrock sediments located adjacent to large crustal...-
Document
-
Cockabidnie. Second partial surrender report, for the period 25/5/2016 to 6/4/2021.
Two portions which constitute the majority of the two sub-blocks which form EL 5791, together covering 63 square km or ~82% of the formerly held area, have been relinquished due to their now perceived diminished prospectivity for economic graphite,...-
Document
-
Cowell Jade Province: rock sample petrographic descriptions.
A collection of Amdel petrographic reports providing raw data for a petrogenetic study of Cowell area jade specimens and related host rocks carried out by SADME, aimed at determining geological controls on the distribution of high quality nephrite...-
Document
Published: 01 Jan 1990
-
Data release - as updated [made at SA Director of Mines' discretion] : Verran and Malbrom (the Verran Project, then the Arno Graphite Project). Joint annual reports plus annual report, for the period 29/1/2014 to 28/1/2019.
Two licence areas together covering the hinterland to Arno Bay and Port Gibbon on eastern Eyre Peninsula, and extending as far north-westwards as Rudall, are being explored for economic buried graphite deposits that may have formed in deformed high...-
Document
-
Cummins. Progress reports to licence expiry/renewal, for the period 11/11/1971 to 10/11/1972.
In order to appraise a potentially economic discovery of very pure, high reflectivity kaolin clay located near Kapinnie on southern Eyre Peninsula, a drilling programme is planned by Endeavour Oil which aims to outline around 33 million tons of kaolin...-
Document
Published: 15 Nov 1972
-
Port Lincoln - Kimba area. Progress reports to licence expiry/full surrender, for the period 1/11/1967 to 31/10/1969.
The possible areal extent and potential in-ground resources of secondary kaolin developed from deep lateritic weathering of Early Proterozoic basement rocks on central-eastern Eyre Peninsula were investigated by the licensee, with a view to obtaining...-
Document
-
Nilginee Dam. Annual reports to licence expiry/renewal for the period 15/3/1993 to 14/3/1998.
A low-lying small area situated 40 km west of Whyalla has been explored primarily for economic gypsum occurrences within Recent surficial sediments, while latterly, a search for metallic minerals has also commenced, via a geological survey of basement...-
Document
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document