-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
RB 91/00041 Geology of the KINGOONYA 1:250 000 map sheet area.
Extensive field geological mapping, augmented by petrological and geochemical studies, reinterpretation of company drilling and water-bore logs and a nine-hole drilling programme has detailed the geology of the KINGOONYA area. The stratigraphy spans...-
Document
Published: 01 Apr 1991
-
RB 96/00006 Palynological dating and correlation of Mesozoic sediments from the ABMINGA 1:250 000 sheet, SA.
The sample from A68 E427190/53J N7068100 is Early Cretaceous (uppermost Barremian) in age and correlative with the Cadna-owie Formation. Open marine conditions are indicated, this being typical of the upper part of the formation in the southwestern...-
Document
Published: 01 Jan 1996
-
RB 89/00066 GAB field survey - 1986/1987.
Data collected from 116 flowing and 24 non-flowing wells included shut in pressure, temperature, flow rate, pH, headworks condition and full chemical analyses of water samples. An observation network is to monitor controlled flowing wells every 2 years.-
Document
Published: 01 Aug 1989
-
RB 88/00087 Coober Pedy Precious Stones Field - CRA Exploration Pty Ltd drilling, 1987.
3 diamond and 15 rotary-percussion holes were drilled in 1987 by CRA within EL 1330 on the southern part of the Field (PSF), this licence having been granted to the company for the exploration of strata below 50 metres depth in the subsurface. The...-
Document
Published: 01 Nov 1988
-
RB 91/00052 Ruby Hill 1. Well completion report.
SADME stratigraphic drillhole Ruby Hill 1 was sited 10.4 km east of William Creek, and was designed to penetrate Early Cretaceous rocks of the Eromanga Basin and to sample pre-Mesozoic basement. It intersected 191 m of the Eromanga Basin sedimentary...-
Document
Published: 01 May 1991
-
RB 96/00021 Palynological dating and correlation of Mesozoic sediments from the ABMINGA 1:250 000 sheet, SA.
Palynological evidence indicates that all 13 submitted drill core sedimentary rock samples, excepting one (taken at 138.2 metres depth in hole A68-1), are late Aptian to earliest Albian in age. The sediments were deposited in environments ranging...-
Document
Published: 01 May 1996
-
Haggard Hill, Whymlet Well, Bon Bon Outstation, McDouall Peak and Phar Lap Outstation (the Kingoonya Project). Joint annual reports and final report to licences' surrender, for the period 21/6/2006 to 9/4/2010.
Exploration of a 4600 square km project area comprising five licences in two contiguous groups within the Kingoonya region has targeted two distinct styles of uranium mineralisation. The primary focus was on possible sandstone - hosted deposits within...-
Document
Published: 16 Apr 1910
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
Olympic Dam Project : operator's reports on hydrogeological investigations, Great Artesian Basin wellfields, for the period 1995-2004.
There is no abstract created for this record-
Document
-
Wintinna Coalfield hydrogeological study.
This report presents a description of the hydrogeology of the Wintinna coal deposit proposed mine site area, and of the investigative work performed to acquire specific data on aquifer properties and groundwater behaviour. Two production bores were...-
Document
Published: 14 Sep 1983
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
Peake Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 70 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Edward Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 90 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Water resources assessment for Lake Phillipson, South Australia.
The Lake Phillipson coal deposits currently under consideration by Utah Development Company as a potential mine, are located in a remote and arid region of Australia. Surface water sources simply do not exist in this area and any development will...-
Document