Meadows (part of the Mount Barker Project). First annual report plus final report to licence expiry/full surrender, for the period 20/4/2017 to 19/4/2019.
A small area covering part of the Meadows Fault scarp and part of the adjoining Tertiary-Recent Meadows Basin has been explored for inferred sediment-hosted primary gold mineralisation that may have formed in favourable Neoproterozoic bedrock...-
Document
Published: 13 Jun 1919
-
Willow Springs. Annual reports and final report to licence expiry/full surrender, for the period 1/12/2011 to 30/11/2016.
An area centred ~65 km north-east of Hawker in the Central Flinders Ranges, and located adjacent to the eastern side of the Oraparinna Diapir, has been explored for possible buried economic epigenetic copper, gold and uranium mineralisation. During...-
Document
Published: 03 Jan 1917
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-42 - Mount Woods Project area, Gawler Craton: assessing the potential for ISGC style mineralisation within the Mount Woods Inlier. Drilling final report
Historically, exploration undertaken for finding Iron Oxide - associated Copper-Gold (IOCG) mineralisation on the eastern Gawler Craton, over the long period since the discovery of the Olympic Dam deposit in July 1975, has targeted positive gravity...-
Document
-
Mount Neville. Progress and final reports to licence expiry/full surrender for the period 17/3/1969 to 16/3/1970.
Inspection of an area showing diapiric and fault disturbance within upper Adelaidean and Lower Cambrian metasediments in the vicinity of Mount Neville sought to find barite deposits of sufficiently high grade and quantity to resemble those of the...-
Document
-
Teetulpa, Wattle Dam and Manna Hill. Progress and final reports for the period 24/3/86 to 23/12/86.
Exploration which was centred on the Teetulpa and Mannahill gold fields comprised intensive geochemical sampling (rock chip, soil, stream sediment, battery slimes and mine dumps) and IP, Sirotem and ground magnetic surveys. Several significant gold...-
Document
-
Jones Dam [Mutooroo Station]. Progress reports to licence expiry/full surrender, for the period 4/1/1979 to 3/1/1981.
81 closely-spaced rotary mud vertical open drillholes (total penetration 9218 m) evaluated known low grade palaeochannel uranium mineralisation previously detected in Miocene sand sequences adjacent to the Anabama - Redan Fault by Tricentrol Australia...-
Document
-
Paratoo. Progress reports to licence expiry/full surrender, for the period 1/3/1988 to 30/2/1990.
TARGET: Possible economic, open-pit mineable stratiform low grade gold and copper deposits within Adelaidean units of the Nackara Arc, in an area lying west of and including Yunta. EXPLORATION: A detailed geological field reconnaissance, review of...-
Document
Published: 19 May 1990
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-25 - Wilcherry Hill area, Eyre Peninsula, Zealous prospect Mesoproterozoic epithermal calc-silicate skarn Sn-U-Pb-Cu-Ag mineral occurrence. Final report.
Arising out of exploratory drilling carried out by Ironclad Mining in 2012, which aimed to test the shallow subsurface haematite ore potential of an ironstone outcrop located in the central north of the Wilcherry Hill licence area, an unexpected...-
Document
-
Preliminary source rock analysis and petrographic description of cores from Old Motpena 1.
Total organic carbon analyses on two diamond drill core samples taken from 334 m and 436 m depth respectively in Old Motpena 1 showed that the Cambrian sediments are organically very lean to barren, displaying no source potential for hydrocarbons.-
Document
Published: 23 Oct 1983
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-21 - Yerelina Gladstone Mining Field sediment-hosted and structurally controlled hydrothermal/replacement style stratabound base metal prospects. Final report.
High-grade silver-lead-zinc mineralisation formed within the Neoproterozoic Tapley Hill Formation (THF) was historically mined 100 years ago at Yerelina in the northern Flinders Ranges. Despite the existence of numerous poorly documented small-scale...-
Document
Published: 08 Dec 1915
-
Birthday Hill (part of the Stuart Range Joint Venture Project). First progress report plus final report to licence expiry/full surrender, for the period 30/3/1977 to 29/3/1978.
During exploration carried out in an area located approximately 60 km south-west of Anna Creek, Newmont targeted Zambian Copperbelt - style mineralisation similar to perceived equivalents of the then newly discovered and poorly understood Olympic Dam...-
Document
-
Old Motpena 1. Test reports.
There is no abstract created for this record-
Document
-
Mulyungarie (part of the Yarramba Joint Venture Project). Data release upon first partial surrender and in consequence of a transfer of licence ownership : progress and technical reports for the period 4/7/1978 to 2/5/1991. [ Index Part 1&2 of 2 ].
Continuing exploration for sedimentary uranium occurrences in the buried Tertiary Yarramba Palaeochannel, undertaken between 1978 and 1982 by a Mines Administration (Minad) - led consortium, comprised reconnaissance and infill traverse- based open...-
Document
Published: 31 May 1992
-
RB 2018/00003 Summary and final report on pyrite, magnetite and hematite mineral geochemistry, South Australia (including samples from the Mineral Systems Drilling Program and the Emmie Bluff IOCG prospect).
Sulfide and oxide trace element geochemical analyses have been conducted on more than 290 core chip samples collected from stored drill cores of 39 drillholes located across South Australia, as part of a collaborative project being conducted between...-
Document
Published: 01 Feb 2018
-
RB 66/00119 Report on Nairne pyrite deposit, Brukunga, Hd Kanmantoo - Nairne Pyrites Pty Ltd.
In August 1966, a request for assistance with conducting pyritic sulphur exploration in the vicinity of Brukunga was received by the SA Department of Mines from Nairne Pyrites Pty Ltd. Brukunga is 29 miles east of Adelaide by road and 3.5 miles north...-
Document
Published: 01 Jan 1968
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-30 - Hanging Knoll portion of Woodroffe Project area - Proterozoic basement-hosted base and precious metal mineral prospects. Drilling project final report.
Targeted stratigraphic and mineral exploratory drilling recently carried out by PepinNini Minerals within its EL 3931 Hanging Knoll was done as part of the sixth round of Theme 2 of the PACE Initiative (Primary Industries and Resources South...-
Document
Published: 15 Feb 1911
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-39 - The Hummocks area - Ridgeback [North] IOCG mineral prospect. Drilling final report.
The greenfields Ridgeback prospect, located about 5 km east-southeast of Bute on the northern Yorke Peninsula, is being explored by EL 4278 sole licensee Investigator Resources for possible Hillside deposit look-alike, Proterozoic basement-hosted...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-37 - Eurilla JV Project, north-central Eyre Peninsula - Jungle Dam Palaeoproterozoic hydrothermal vein-hosted primary uranium mineral prospects. Drilling final report.
In 2007, Lincoln Minerals discovered greenfields uranium mineralisation near Jungle Dam on its EL 3690, located about 45 km north-east of Kimba on the northern Eyre Peninsula. EL 3690 straddles a NNW-trending splay of the Kalinjala Shear Zone (~1720...-
Document
Published: 15 Aug 1911
-
Cocata and Palkagee Well. Annual reports and final reports to licences' joint expiry/full surrender, for the period 1/12/2005 to 30/11/2010.
Exploration carried out over two adjacent areas located 50 to 70 km south-west and south of Wudinna was progressed under the terms of two separate joint venture agreements made by the licensee in October 2006, firstly with GE Resources (a subsidiary...-
Document
Published: 27 Jan 1911
-
RB 33/00098 Utilization of Nairne pyrite for the manufacture of sulphuric acid (5/8/1952).
Plans are now completed for the mining of pyrites from extensive deposits at Nairne, a distance of 25 miles from Adelaide. The pyrites will be concentrated by flotation methods, then railed to Adelaide for use in a sulphuric acid plant. The pyrites is...-
Document
Published: 01 Jan 1954