-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
The Gawler Craton Project [Part]. Data release made in lieu of partial surrender/joint annual reports for the period 3/2/2010 to 1/2/2019, plus letters giving permission to release owed licence partial relinquishment and surrender reports.
As part of a regional search for possible major deposits of IOCG type mineralisation, Golden Cross Resources took up six exploration tenements in the northern Gawler Craton that lie to the north and north-east of Coober Pedy, and which are within or...-
Document
Published: 23 Jun 1915
-
Oakden Hills. Annual reports plus final report to licence expiry/full surrender, for the period 12/12/2018 to 11/12/2022.
A small area centred ~50 km south-east of Woomera, in hilly terrain just west of Pernatty Lagoon, was taken up to cover an EM conductor identified from a recently flown SA Government SkyTEM survey, which coincides with a weak regional magnetic...-
Document
Published: 15 Dec 1922
-
Lake McFarlane. Final report at licence full surrender, for the period 14/9/2017 to 10/4/2019.
No field work was done - office studies only. In a search for possible buried Olympic Dam type IOCG mineralisation, a review that Rio made of recently released open file geophysical data did not disclose any targets of interest.-
Document
Published: 13 Sep 1918
-
Data release : Yeltacowie, Pernatty [Station] and Whittata (the Punt Hill IOCG Project). Joint annual reports, plus final report to expiry of EL 5774 Punt Hill, for the period 7/1/2012 to 6/1/2017.
During the eighth, 2012-2013 year of tenure of the Pernatty EL area, now being explored in concert with two other adjoining Punt Hill IOCG Project licences, Monax reviewed its past drillhole data, undertook further processing of the project's amassed...-
Document
Published: 29 Aug 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty Lagoon. Annual reports for the period 27/6/2007 to 22/7/2018.
Continuing exploration for possible buried economic IOCG mineralisation on the western side of an area located between Lake Torrens and Pernatty Lagoon, under tenure of renewed EL 3854, was focussed on determining mineral systems geochemical...-
Document
Published: 23 Aug 1918
-
Andamooka Ranges, Island Dam and Stuart Shelf (part of the Stuart Shelf Project). Joint third partial surrender report, for the period 16/1/1981 to 25/9/2018.
There is a long history of exploration on the subject three Stuart Shelf tenements, with first tenure originally taken up in 1981. A summary of significant exploration activities conducted on the three now relinquished ground portions is believed by...-
Document
Published: 22 Nov 1918
-
Port Hughes. Annual reports and final report to licence full surrender, for the period 29/11/2010 to 17/8/2017.
A licence consisting of three separate small sub-blocks that cover a large number of freehold broad-acre farms in the Bute - Agery - Moonta South district has been explored for possible buried economic IOCG mineralisation, which may have formed on or...-
Document
Published: 31 Aug 1917
-
Woordlemmie (aka the Mount Gunson South Project). First partial surrender report, for the period 22/6/2011 to 21/6/2018.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings is being explored for possible buried economic base metal deposits that may exist in a variety of geological settings and...-
Document
-
Phar Lap Outstation. Combined first annual/final report at licence full surrender, for the period 17/7/2018 to 22/11/2019.
An area centred ~228 km south-southeast of Coober Pedy has been explored for possible buried IOCG type mineralisation, which could have formed in Mesoproterozoic basement rocks in a position which it was thought had not been properly tested by past...-
Document
Published: 12 Sep 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Vivian. First annual report for the period 29/11/2012 to 28/11/2013.
A large area centred ~38 km east-northeast of Kingoonya is being explored for possible economic metallic mineralisation that may have formed in buried Proterozoic volcanic and plutonic basement rocks that are thought to lie at a shallowest depth of...-
Document
Published: 04 Dec 1913
-
Pernatty Lagoon. Sixth partial surrender report, for the period 27/6/1997 to 22/7/2017.
Approximately 27% of the former area of EL 5107, consisting of four separate peripheral sub-blocks located on the southern, eastern and northern sides of the licence, was partially relinquished by the JV partners on 22/7/2017 due to its perceived...-
Document
Published: 09 Oct 1917
-
Arcoona. Annual reports and final report to licence expiry/full surrender, for the period 21/5/2019 to 20/5/2021.
An area located immediately south-east of Pimba has been explored for possible shallowly buried IOCG mineralisation, with a focus on the iron ore potential of magnetite/haematite breccias associated with this mineralisation type. During the first...-
Document
Published: 13 Jul 1921
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/2002 to 26/6/2007.
An area lying along the eastern side of Pernatty Lagoon is being explored primarily for possible buried economic IOCG style mineralisation of possible Olympic Dam type, that may be hosted by poorly known Proterozoic or older basement rocks which...-
Document
Published: 20 Aug 1907
-
Mount Eba. Annual reports and final report to licence expiry/full surrender, for the period 18/6/2012 to 17/6/2017.
No new work - licensee only made reviews of existing data. Westernx’s primary exploration target was IOCG-U mineralisation hosted in haematite-magnetite breccia complexes. EL 4915 was selected due to its location on the boundary of the Olympic...-
Document
Published: 31 Aug 1917
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 1919
-
Hidden Swamp and Stuart Creek South (part of the Theseus copper exploration Project). Joint second partial surrender report, for the period 18/6/2012 to 25/9/2018.
Brownfields exploration for possible buried economic Mesoproterozoic basement-hosted IOCG type mineralisation undertaken within three now relinquished licence portions located between ~25 km to ~75 km north-northwest of the Olympic Dam mine has...-
Document
Published: 22 Nov 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document