RB 80/00054 Coongra no. 1 well completion report.
Aim was 1) to determine whether Permian sediments extended across the northern Muloorina Ridge, and thereby connected the Arckaringa and Pedirka basins; 2) to identify basement high-speed seismic refractor. The well was abandoned in Early Cretaceous...-
Document
Published: 01 May 1980
-
RB 93/00010 Explanatory Notes for the WARRINA 1:250 000 geological map.
The oldest rocks on WARRINA outcrop in the Peake and Denison Inliers, which comprise the Davenport and Denison Ranges and small inliers to the east. Basement in this area consists of Palaeoproterozoic metamorphic rocks which were intruded by...-
Document
Published: 01 Jun 1994
-
McDouall Peak Station (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 70 km south of Coober Pedy, commenced with a re-assessment of open file airborne magnetic data in an...-
Document
-
Gina Outstation (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 30-45 km east of Commonwealth Hill, commenced with a re-assessment of open file airborne magnetic data...-
Document
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
Warrataddy Hill (part of the ABMINGA Diamond Project and the Tieyon Ni/PGM Project). Annual reports to licence expiry/full surrender, for the period 25/10/1993 to 16/3/2009.
Early work on the subject licence took place after 25/10/1993 as part of a regional search for possible shallowly buried diamondiferous kimberlites, conducted by Caldera Resources and Laura Holdings across a large tenement package which had been...-
Document
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
Commonwealth Hill. Combined first annual and final report to licence expiry/full surrender, for the period 2/1/2007 to 1/1/2008.
An area located approximately 90 km north-west of Tarcoola was reviewed for its potential to harbour possible economic Cu-Au-U-REE mineralisation, Archaean basement structure-related mesothermal/hydrothermal gold, or near surface sedimentary roll...-
Document
Published: 15 Feb 1908
-
Marla, Alberga River and Mount Weir areas (part of the Abminga Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 2/4/2009.
A basinal region located in the vicinity of Marla and extending for approximately 75 km to the north north-east, that borders the Musgrave Province, has been explored by farminee Eromanga Uranium under a joint venture agreement with licensee Maximus...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Sandstone Outstation area (part of the Central Gawler Project). Second partial surrender report, for the period 20/5/2005 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) for the subject 39 square km of relinquished portions of EL 3343, located about 70 km south-west of Coober Pedy, commenced with a...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Hamilton Creek. Annual reports plus final report to licence expiry/full surrender, for the period 17/5/2010 to 16/5/2015.
A large area located in the far north of South Australia, abutting the Northern Territory border ~120 km north of Marla, and centred ~30 km east of the Stuart Highway wholly on Tieyon Station, has been explored for possible economic buried secondary...-
Document
-
Mount Britton. Annual and final reports for the period 19/10/97 to 18/10/99.
Limited percussion drilling (2 holes, total 446 m) of inferred dipolar aeromagnetic anomalies in the vicinity of Ross Creek, 140 km north-east of Marla, and subsequent mineralogical examination of heavy mineral concentrates obtained from the drilled...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Hamilton Creek. First partial surrender report, for the period 17/5/2010 to 16/5/2014.
EL 4493 lies in the far north of South Australia, abutting the Northern Territory border, and is centred about 30 km east of the Stuart Highway. It falls entirely within the confines of Tieyon Station. Recently, a portion of the licence totalling 218...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mulgathing area - Annual technical report for period ending 22/03/2019.
EL 5930 is centred approximately 720 km north of Adelaide and 100 km southwest of Coober Pedy. Geologically the tenement sits in the northern Gawler Craton within the basement of the Archean Mulgathing Complex and is overlain by the Jurassic...-
Document
Published: 05 May 1919
-
Data release - as updated : Pound Creek. Annual reports and final report to licence full surrender, for the period 1/12/2010 to 16/11/2017.
South Australia Ludi Mining Pty Ltd (“SALM”) acquired Exploration Licence 4619 in the vicinity of Coward Springs to explore it for large Mesoproterozoic copper/gold/uranium deposits analogous to Olympic Dam, which is located approximately 120 km to...-
Document
Published: 21 Nov 1917