Mount Willoughby, Marla, Nicholson Hill, Hope, Manya, Emu, Moorefield, Lake Meramangye, Dingo Claypan and Alinya (Officer Basin). Progress, technical and partial relinquishment reports for the period 20/8/1980 to 19/8/1985.
TRONA EXPLORATION: Of the 9 rotary/diamond holes drilled, only the first, Meramangye 1, intersected a unit equivalent to the Observatory Hill Beds, which was the target horizon for trona. Drillholes Manya nos 2-6 and Marla 7 intersected Cambrian red...-
Document
-
Bendigo Station. Progress reports to licence expiry/renewal, for the period 6/8/1987 to 5/8/1992.
Copper and gold exploration comprising outcrop, stream sediment and soil geochemical sampling, and the conduct of ground magnetic and IP surveys, plus RC percussion (67 vertical holes, total 6624 m) and diamond cored tail drilling (in 2 holes, total...-
Document
Published: 02 Jul 1992
-
RB 79/00088 Wilkinson 1. Well completion report.
Wilkinson 1 stratigraphic well was drilled by the SA Department of Mines and Energy in mid-1978, about 250 km south-west of Coober Pedy, in the Tallaringa Trough. Here a thick section of Cambrian claystones, limestones and evaporites, at least 594 m...-
Document
Published: 01 Oct 1979
-
RB 95/00011 Hydrocarbon shows in Comalco mineral drillholes, Officer Basin.
The Officer Basin covers some 350,000 square km of central southern Australia, extending from the Yilgarn Block in Western Australia east to the Gawler Craton in South Australia. During the early 1980s Comalco Aluminium Limited explored the eastern...-
Document
Published: 01 Mar 1995
-
Mount Gunson. Reports on trial seismic refraction surveys conducted in 1966 and 1972 to map possible ore-bearing horizons.
Reports describe the results of two attempts to use seismic refraction methods to map an unconformable subsurface interface between lithic sandstone and quartzite units within the Whyalla Sandstone. This palaeosurface is important as a locus for...-
Document
-
PEL 47. Progress and technical reports for the period June 1990 to March 1993.
Anzoil NL carried out geological and geophysical studies on previous exploration data, but was unsuccessful in attracting farmin partners either locally or overseas. The licence area was reduced to ease the work commitment, by partial relinquishment...-
Document
Published: 31 Mar 1993
-
Geophysical review - Prospect evaluation, SA offshore permit SA-7.
EPP 7 work conditions for 1975 (permit Year 7) required evaluation and review studies to be carried out with the aim of defining at least three areas which may have prospects geologically and geophysically as sites for wells. This report sets out the...-
Document
-
RB 00759 Basin study of [sub-basins to] the Great Artesian Basin, South Australia: Palaeozoic and Triassic [sediments].
Report discusses via a series of maps the subsurface geology of the Cooper and Pedirka regions underlying the Great Artesian Basin in South Australia. A general tectonic and depositional environmental framework is delineated for each of 3 layers of...-
Document
Published: 31 Dec 1899
-
RB 73/00193 Seismic refraction survey at Anstey Hill - EWS Department.
It is proposed that a water filtration plant be constructed near the Anstey's Hill Tanks. Six seismic refraction traverses were made over the area concerned to test bedrock conditions. These show that the rocks comprising bedrock are phyllites and...-
Document
Published: 01 Jan 1973
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker, The Twins and Balta Baltana (the Mount Woods Project). Joint annual reports for the period 1/1/2011 to 31/12/2018.
Exploration activities undertaken on the Mount Woods Project during 2011 comprised: - ongoing target generation and geological interpretation - continued geological and structural interpretation of the Mount Woods Inlier - drilling of 80 rotary...-
Document
Published: 28 Feb 1919
-
Mount Fitton. Progress and technical reports for the period 1/7/1971 to 30/6/1973.
A review has been carried out by Amdel Ltd, under contract to the licensee, of the applicability and suitability of low-cost geophysical reconnaissance tools in prospecting for concealed talc occurrences in the Mount Fitton area. It appears that use...-
Document
Published: 13 Jun 1973
-
Woolly Dam. Progress reports and final report to licence expiry/full surrender, for the period 9/1/1978 to 8/1/1980.
Exploration undertaken in an area of practically no outcrop that is situated north and north-west of the Ediacara Range, on the eastern side of Lake Torrens, has aimed primarily at investigating the mineral potential of a large, low amplitude...-
Document
Published: 05 Jun 1980
-
Calcrete investigations. Progress report nos 1 to 3 for the period September 1974 to December 1976.
Calcrete samples taken from various likely residential and industrial sites in South Australia were examined to determine features applicable to stratigraphic classification and to engineering geology requirements for construction planning.-
Document
-
Parachilna - Mernmerna area. Progress and final reports to licence expiry/full surrender, for the period 14/6/1966 to 14/11/1969.
Continuing exploration for Ediacara - type, Early Palaeozoic carbonate sediment-hosted lead-zinc deposits in the Bunyeroo Gorge - Parachilna Gorge area of the Flinders Ranges comprised regional and detailed stream sediment, rock chip and soil...-
Document
Published: 13 May 1969