-
Peake and Malinong. Final report at licences' joint full surrender, for the period 7/7/1980 to 6/8/1982.
In a search for economic Tertiary brown coal in the south-eastern Murray Basin, a large reconnaissance drilling programme was undertaken during February-April 1981 to test known carbonaceous sediments reported as encountered by previous drillholes and...-
Document
Published: 06 Sep 1982
-
Karoonda. Final report at licence full surrender, combined with related partial surrender reports for Peake, Swan Reach, Waikerie and Malinong, covering the period 7/7/1980 to 6/7/1981.
Within the surrendered sections of the subject exploration licences in the Karoonda, Marmon Jabuk, Swan Reach, Blanchetown and Cooke Plains areas, following the conduct there of a 45.4 line km gravity survey and the drilling and geophysical logging of...-
Document
Published: 12 Jun 1981
-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
RB 49/00001 Supplementary gravity traverses over Bungalow aeromagnetic anomaly near Cowell, Eyre Peninsula.
Supplementary gravimeter traverses have been run over the strong Bungalow aeromagnetic anomaly to further define it. Earlier in the year a percussion drilling programme was carried out over the same area. In the light of both sets of results it is...-
Document
Published: 03 Jul 1959
-
RB 49/00013 Gravity and magnetic surveys over aeromagnetic anomaly, Hundred of Chandada.
There is no abstract created for this record-
Document
Published: 01 Jan 1961
-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
RB 78/00097 Engenina adamellite and Balta granite of the Mount Woods Inlier.
There is no abstract created for this record-
Document
Published: 11 Aug 1978
-
RB 95/00037 Stonefield bedrock drilling, 1995.
Twenty-three vertical open RC drillholes with a total penetration of 2663 m were drilled by MESA during February and March 1995 along four W-E traverses in the Stonefield area near Truro, to determine bedrock geology and geochemistry below sedimentary...-
Document
Published: 01 May 1997
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-45, Old Well and New Well shear-associated gold mineral prospects. Project final report.
The Yarlbrinda and Yerda Shear Zones of the central Gawler Craton, partly present within EL 3107 in the Tarcoola-Glenloth-Lake Harris region, were the target for a number of mineral exploratory drillholes put down there by by licence farminee Minotaur...-
Document
-
Mount Mary. Combined first annual/final report at licence expiry/full surrender for the period 14/4/2008 to 13/4/2009.
During initial exploration of the Mount Mary area, located approximately 120 km north-east of Adelaide, the compilation and reprocessing of available gravity and magnetic data were used to interpret the bedrock geology hidden under a widespread...-
Document
Published: 14 Apr 1909
-
Giles Nob. Progress reports to licence expiry/full surrender, for the period 8/7/1983 to 7/7/1988.
Exploration for possible economic gold deposits in an area located approximately 25 km south of Olary addressed three principal objectives: . hydrothermally-sourced gold within quartz-albite-dolomite vein stockworks formed in phyllitic siltstones of...-
Document
-
Yarramba. Annual reports submitted until the commencement of licences' joint reporting on the South Eagle / Honeymoon Project, for the period 10/4/2000 to 26/8/2009. [ Index Part 1 of 2 ].
Southern Cross Resources Australia Pty Ltd (Southern Cross) purchased Rio Tinto Exploration Limited’s share of the Northern Olary Joint Venture, including its interest in the subject EL 2310 Yarramba, in November 2000. Southern Cross has held the...-
Document
-
Data release - as updated : Lake Gilles (part of the East Eyre [Peninsula] Project). Annual reports to licence expiry/full surrender, for the period 22/12/2005 to 28/11/2016.
Exploration aimed primarily for economic buried Menninnie Dam - style base and precious metals mineralisation hosted by Palaeoproterozoic metasedimentary basement has been conducted on a licence located in the Lake Gilles district. The subject area...-
Document
Published: 11 Jan 1917
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo (the Olary Creek Project). Annual reports for the period 15/11/2005 to 7/2/2019.
An area centred ~50 km south west of Cockburn is being explored for possible economic base and precious metal mineralisation that may have formed in buried Palaeoproterozoic basement rocks, as well as for any secondary uranium mineralisation that may...-
Document
-
Natural building stones of South Australia. Progress reports 1 to 14 for the period July 1975 to September 1989.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
South Eagle. Data release made at transfer of licence ownership : annual reports for the period 17/9/1997 to 16/9/2000.
The majority of mineral exploration undertaken in the South Eagle area, centred 40 km north-east of Olary, has targeted stratabound Pb-Zn-Ag, stratabound massive sulphide Cu-Zn-Co-Mn, and Cu-Au mineralisation that may have formed in Proterozoic rocks...-
Document