-
Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Andamooka, Stuart Creek, Arcoona, Lake Torrens, Todds Dam, Lake Arthur, Woodforde Hill and Murdie Island (the Stuart Shelf Project). Joint first partial surrender report at licences' expiry/renewal, for the period 2/5/1975 to 16/6/1986.
WMC's Stuart Shelf exploration activities from 1975 to 1985 have sought mainly Olympic Dam style mineralisation (copper - uranium - precious metals in haematitic breccia host rocks), with lesser emphasis directed at: possible distal analogues of the...-
Document
-
RB 83/00080 Precambrian correlation of the Lake Superior region, North America, and the Gawler Craton.
Geology of Lake Superior region outlined. Many similarities in tectonic evolution and depositional style of the 2 provinces. Recommends further research on Gawler Craton.-
Document
Published: 01 Sep 1983
-
RB 89/00070 Gawler Ranges Excursion, October 7th-9th, 1989.
Summarises the chemical classification and macroscopic visual attributes of basement igneous rocks seen in outcrop within the regional geological settings of northern Eyre Peninsula and the Gawler Ranges.-
Document
Published: 01 Sep 1989
-
RB 90/00016 Beda Volcanics and Backy Point Formation of the eastern Gawler Craton.
Beda Volcanics and Backy Point Formation crop out in only a few localities on northeastern Eyre Peninsula, north of Whyalla, but drilling has shown them to extend for approximately 170 km to the north below younger cover. The Beda Volcanics comprise...-
Document
Published: 01 Feb 1991
-
Lake Torrens South and Harris Crossing area, north of Port Augusta (the Torrens South Project). Combined annual reports plus separate final reports to licences' joint expiry/full surrender, for the period 31/1/2006 to 30/1/2010.
Exploration for possible buried Carrapateena or Prominent Hill type iron oxide-associated copper-gold deposits along the south-eastern side of the Stuart Shelf, in the vicinity of the southern end of Lake Torrens, initially consisted of a review of...-
Document
Published: 07 Apr 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-14, Pernatty Lagoon area (eastern Gawler Craton) IOCG mineral prospects. Project final report.
PACE proposal DPY3-14 aimed to discover a new iron oxide - associated copper-gold (IOCG) mineralised magmatic centre, similar to the Olympic Dam setting, within the eastern margin of the Gawler Craton. The Pernatty Lagoon project is located less than...-
Document
Published: 20 Sep 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-47, Myall Creek Neoproterozoic stratabound base metal (copper) mineral prospect. Project final report.
The known Myall Creek stratabound copper occurrence located ~23 km north of Whyalla, which was discovered in 1975 by Australian Selection, consists of low-grade (0.3 to 2.2% Cu) Zambian Copperbelt or Kupferschiefer - style copper sulphides extending...-
Document
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Data release - as updated : Sunset Hill. Annual reports and final report to licence full surrender, for the period 24/11/2008 to 13/4/2017.
An area taken up to comprise the middle member of a block of three tenements located in the Myall Creek region ~ 30 km west-southwest of Port Augusta has been explored for possible economic buried stratabound copper sulphide mineralisation as well as...-
Document
Published: 23 May 1917
-
Data release : Yeltacowie, Pernatty [Station] and Whittata (the Punt Hill IOCG Project). Joint annual reports, plus final report to expiry of EL 5774 Punt Hill, for the period 7/1/2012 to 6/1/2017.
During the eighth, 2012-2013 year of tenure of the Pernatty EL area, now being explored in concert with two other adjoining Punt Hill IOCG Project licences, Monax reviewed its past drillhole data, undertook further processing of the project's amassed...-
Document
Published: 29 Aug 1917
-
South Gap. Annual reports and final report to licence expiry/full surrender, for the period 24/7/2017 to 23/7/2021.
A small area situated just north of the Beda Arm of Lake Torrens, and ~20 km north-northeast of the Carrapateena deposit, has been explored for possible buried high grade IOCG mineralisation that may be present in Proterozoic basement rocks. It was...-
Document
Published: 23 Aug 1921
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/2002 to 26/6/2007.
An area lying along the eastern side of Pernatty Lagoon is being explored primarily for possible buried economic IOCG style mineralisation of possible Olympic Dam type, that may be hosted by poorly known Proterozoic or older basement rocks which...-
Document
Published: 20 Aug 1907
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
Sugarloaf Hill - Tregolana areas. Progress reports to licence expiry/renewal, for the period 30/6/1980 to 29/6/1981.
In a search for possible economic stratiform copper deposits which might have formed at the base of the Neoproterozoic Tapley Hill Formation, 4 vertical rotary mud/diamond drillholes totalling 939.5 m were put down in the vicinity of Tregolana and...-
Document
Published: 22 Aug 1984
-
Pernatty Ridge. Progress reports to licence expiry/full surrender, for the period 13/12/1989 to 12/12/1991.
Possible stratabound, Kupferschiefer - style copper sulphide within the basal sediments of the early Neoproterozoic Tapley Hill Formation was the target of exploration in the Pernatty Ridge area. Aberfoyle's work has comprised a review of existing...-
Document
-
Port Augusta (including Delhi Petroleum's Lake Torrens Salt Project). Progress reports and final report to licence expiry/full surrender, for the period 24/1/1980 to 23/1/1982.
Field tests continued as part of the salt project, to confirm salt crystallization and purification data. Results indicate that brine production rates and quality and quantity of salt output are comparable with the results from previous tests....-
Document
-
Port Augusta. Progress reports and annual reports plus final report to licence full surrender, for the period 18/3/1982 to 29/10/1986.
The principal target of ongoing exploration in the southern Lake Torrens region was a possible buried, large, high-grade base and precious metal deposit lying within the pre- Pandurra Formation basement. After completing the drilling of DDH YAD1 at...-
Document
-
Pernatty. Annual reports to licence expiry/full surrender, for the period 20/3/2018 to 19/3/23.
The Pernatty Project is located approximately 20 km SSE of the IOCG deposit at Carrapateena, within Exploration Licence 6137. The area was initially targeted by Tasman Resources Ltd due to available geophysical data, the possibility of reasonable...-
Document
Published: 25 Mar 1923