-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Lobethal (part of the Adelaide Hills Project). Data release made upon the commencement of project licences' joint reporting] : annual reports for the period 29/9/1993 to 3/3/2003.
A large, 722 square km area of the central Adelaide Hills extending between Jupiter Creek and the Warren Conservation Park is being explored for diamonds, gold and base metals, in host geological structures that appeared to be associated with...-
Document
-
Mount Plantagenet. Progress reports to licence expiry/full surrender, for the period 11/2/1971 to 10/2/1973.
Ongoing exploration for economic epigenetic and syngenetic copper occurrences in the vicinity of the Worumba Diapir, east of Hawker, has concentrated on field mapping, soil and channel sampling and shallow percussion drilling (47 holes for 3755+ feet)...-
Document
Published: 23 May 1972
-
Mount Neville. Progress and final reports to licence expiry/full surrender for the period 17/3/1969 to 16/3/1970.
Inspection of an area showing diapiric and fault disturbance within upper Adelaidean and Lower Cambrian metasediments in the vicinity of Mount Neville sought to find barite deposits of sufficiently high grade and quantity to resemble those of the...-
Document
-
Stuart Creek. Final report at licence surrender for the period 6/3/1978 to 4/5/1978.
Exploration for possible stratabound base metal deposits, hosted within Adelaidean rocks overlapping an inferred shallow basement high that had been modelled as present to the west of the Torrens Fault, was not progressed after a re-interpretation of...-
Document
Published: 13 Jun 1978
-
Data release [made at SA Director of Mines' discretion] : Hedley Hill. Annual reports submitted until the commencement of joint reporting for the six Lake Torrens Project licences, for the period 26/5/1997 to 25/5/2000.
Exploration Licence 2340 “Hedley Hill” is located adjacent to the northeast extremity of Lake Torrens. During the 80’s and 90’s exploration of the Lake Torrens district has had the prime objective of the discovery of an "Olympic Dam" style deposit...-
Document
Published: 20 Jul 1900
-
Mount McCallum, Mount Morris and Mount Roebuck (part of Flinders Ranges Project). Combined first annual report, plus progress and final reports to licences' expiry/full surrender, for the period 23/5/2005 to 22/5/2008.
Neoproterozoic glacial sedimentary units in the intramontane basinal valley located east of Leigh Creek and Copley, which were considered likely to contain possible geologically suitable palaeo-depositional sites for secondary uranium mineralisation...-
Document
Published: 16 Jun 1908
-
Oraparinna. Progress and final reports to licence expiry/renewal for the period 22/7/1969 to 21/7/1970.
Exploration of the area around the margins of the Oraparinna Diapir for commercial barite deposits has consisted of aerial photographic studies, plus ground geological traverses of photo-interpreted fault structures, and geological mapping, trenching...-
Document
-
Sundown Creek. Progress and final reports to licence expiry/full surrender for the period 3/10/1977 to 2/10/1979.
Exploration undertaken in an area of practically no outcrop that is situated north and north-west of the Ediacara Range, on the eastern side of Lake Torrens, has aimed primarily at investigating the mineral potential of a large, low amplitude...-
Document
Published: 26 May 1980
-
RB 2018/00037 Gawler Craton Airborne Geophysical Survey Region 3A, Andamooka – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Dec 2018
- ZIP
-
Teatree Well. Progress and final reports to licence expiry/full surrender for the period 5/1/1984 to 4/1/1986.
Exploration for possible fault-related epigenetic lead-zinc deposits formed in calcareous rocks outcropping along the Mount John - Arrowie fault system, to the south-east of the Moro mine, has included extensive stream sediment and rock chip sampling...-
Document
-
Woolly Dam. Progress reports and final report to licence expiry/full surrender, for the period 9/1/1978 to 8/1/1980.
Exploration undertaken in an area of practically no outcrop that is situated north and north-west of the Ediacara Range, on the eastern side of Lake Torrens, has aimed primarily at investigating the mineral potential of a large, low amplitude...-
Document
Published: 05 Jun 1980
-
Blinman. Progress, annual and final reports to licence expiry/full surrender for the period 29/1/1970 to 28/1/1972.
After conducting a thorough evaluation and gap analysis of the past exploration carried out on the Blinman Dome and environs, the licence operator decided to carry out regional stream sediment sampling (1000 samples taken over 60 square miles) in the...-
Document
-
Carrieton. Progress and final reports to licence expiry for the period 19/6/1970 to 18/12/1971.
An area of 117 square miles surrounding Carrieton Railway Siding was prospected for possible economic diapir-related base and precious metals hosted within bounding Adelaidean strata. A comprehensive regional stream sediment survey was conducted...-
Document
Published: 24 Dec 1971