-
Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
Lake Carnanto. Progress reports and final report to licence full surrender, for the period 30/11/1978 to 11/2/1983.
The south-eastern Lake Frome Embayment in the vicinity of Quinyambie Station was explored for Upper and Lower Tertiary 'blanket' or 'roll front' type sedimentary uranium, via the drilling of 75 open vertical rotary mud holes with a total penetration...-
Document
-
Clayton, Cooryanna and Lake Eyre (part of the Mount Flint Project). Combined first annual/final report at licences' joint full surrender, for the period 26/3/2008 to 25/3/2009.
Exploration conduced over three semi-adjacent small licence areas located 50-75 km north-east, north and north-west of Marree targeted possible near-surface sedimentary uranium deposits in sandstone palaeochannels, and also sedimentary phosphate rock...-
Document
Published: 01 May 1909
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Starvation Lake. Progress reports and final report on regional exploration programme at licence surrender, for the period 13/1/1972 to 31/7/1972.
In a search for possible economic roll-front, blanket style uranium deposits within Tertiary sediments in part of the eastern Frome Embayment, the licensee undertook 1:75,000 scale geological mapping and exploratory auger drilling of the Quaternary...-
Document
-
Honeymoon project - hydrological report on the HC 9 pumping test conducted February-March, 1980.
Regional and site-specific geological and hydrological factors are discussed, and a groundwater model is proposed for the Honeymoon uranium deposit, based on the results of the HC 9 drilling and testing programme, and on other existing data. A...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 27/8/2009 to 26/8/2015.
During the 2009-2010 licence year, 8 vertical open rotary mud drillholes, YR035 to YR042, were completed along two drill traverses for a total penetration of 1614 m. They were designed to intersect the Eyre Formation adjacent to interpreted faults in...-
Document
Published: 10 Sep 1913
-
Lake Gregory. Final report at licence full surrender, for the period 13/5/2016 to 9/3/2017.
A licence area covering a large salt lake (Lake Gregory) of the Cenozoic Lake Eyre Basin, and the underlying Mesozoic Eromanga Basin sediments situated to the north of the uranium-rich Mount Babbage and Mount Painter inliers, ~120 km north-east of...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2010 to 1/6/2018.
During 2010-2011, the sixth year of the subject licence, as part of its continuing search for buried economic Tertiary sediment-hosted roll front style secondary uranium deposits, Marmota conducted the following work: • acquired a 58.6 line km moving...-
Document
Published: 17 Jul 1918
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 1910
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola, Moolawatana and Mount Hopeless (the Frome Basin Project). Joint annual report for the period 1/1/2016 to 31/12/2018.
Exploration Licence 5017 Arkaroola, Exploration Licence 5118 Mt Yerila and Exploration Licence 5261 Petermorra cover a combined area of approximately 1831 square km within the northern Flinders Ranges and the Frome Basin. The area is being targeted...-
Document
Published: 16 Jan 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
Benagerie. Progress reports and annual reports, plus final report to licence full surrender, for the period 13/11/1979 to 9/3/1989.
TARGET: Sedimentary uranium in Tertiary sandstone, plus Olympic Dam type copper-gold mineralisation and Broken Hill or Mount Isa type stratiform base metal mineralisation in the underlying basement rocks. EXPLORATION: Stratigraphic drilling (162...-
Document
-
Bulgunnia. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 10/8/1981.
The base metal and uranium potential of a concealed Proterozoic basement high near Bulgunnia Homestead was evaluated using geological and hydrogeochemical reconnaissance and regional geophysical interpretation approaches. Seismic, ground magnetic and...-
Document
-
Lake Yantawena (East). Progress reports for the period 27/11/1970 to 26/11/1972.
An airborne scintillation spectrometer survey with follow-up ground radioactivity surveying, new geological and gamma logging of deep water bores, and subsequent road traverse drilling of 64 regional reconnaissance open rotary holes totalling 24,447...-
Document
-
ExpNotes CURDIMURKA: Explanatory Notes CURDIMURKA
There is no abstract created for this record-
Document