-
Roopena Station. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 26/6/1985.
Exploration of an area situated between Whyalla, Iron Knob and The Bluff overlooking Myall Creek, 20 km south-west of Port Augusta, aimed to test for Olympic Dam - type Cu-U-Au mineralisation associated with products of igneous activity located in and...-
Document
Published: 09 Aug 1985
-
Mount Eba. Annual reports and final report to licence expiry/full surrender, for the period 20/10/2005 to 19/10/2008.
An area within the northern Stuart Shelf which extends from 15 to 65 km south of the Prominent Hill mine site has been explored for possible similar IOCG-U type economic mineral deposits by a new industry entrant uranium explorer, Uranium Exploration...-
Document
Published: 16 Jan 1909
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Roopena. Progress reports and final report to licence expiry/full surrender, for the period 30/6/1986 to 29/6/1988.
TARGET: Uranium in Proterozoic rocks in areas where these largely concealed by alluvial or weathered materials. EXPLORATION: RAB drilling during March-April 1987 (87 vertical open holes totalling 3583 m), investigation of radiometric anomalies...-
Document
Published: 01 Jan 1988
-
Yalymboo, Dingo Hill and Black Oak Hill (the Cariewerloo Project). Joint annual reports and separate final reports to licence's respective expiry/full surrender, for the period 5/6/2006 to 20/6/2009.
Possible Mesoproterozoic unconformity-related uranium deposits within the Cariewerloo Basin, involving an inferred structural preparation component whereby basic intrusive members of the Gairdner Dyke Swarm cut across this unconformity in a manner...-
Document
Published: 19 Nov 1909
-
Wartaka [Homestead] (part of the Parkinson Dam Project). Annual reports [to the commencement of project licences' combined reporting] and final report to licence surrender, for the period 20/6/2003 to 30/6/2012.
An area located approximately 50 km west of Port Augusta has been explored for economic epithermal gold and silver mineralisation following the discovery of such mineralisation a short distance to the north on the licensee's adjoining EL 3307 / 4475....-
Document
-
Yeltacowie, Hesso, Charlinga, Bowen Hill and Kangaroo Bluff (the Stuart Shelf Project). Joint annual reports and final report to licences' joint full surrender, for the period 16/8/2005 to 14/2/2014.
Uranium One Australia (U1A) acquired the Stuart Shelf Project tenements in 2005 with the aim of exploring for uranium mineralisation that has unconformity - related genetic features broadly analogous to those of deposits of the Athabasca Basin in...-
Document
Published: 28 May 1914
-
Wirramina (part of the West Roxby Project). Annual reports to licence expiry/transfer, for the period 7/3/2007 to 6/3/2012.
An area consisting of two separate sub-blocks, centred approximately 60 km west-northwest of Woomera, was taken up to explore the IOCG-U mineralisation potential of the concealed Mesoproterozoic metasedimentary cover and underlying Meso- to...-
Document
Published: 14 Apr 1912
-
Island Lagoon (part of the West Roxby Project). Annual reports to licence expiry/transfer, for the period 7/3/2007 to 6/3/2012.
An area centred approximately 30 km south-west of Woomera was taken up to explore the IOCG mineralisation potential of an isolated, circular outline regional gravity anomaly called the Island Dam prospect, seen to have a semi-coincident magnetic high...-
Document
Published: 19 Apr 1912
-
Yalymboo (part of the West Roxby Project). Annual reports to licence expiry/transfer, for the period 7/3/2007 to 6/3/2012.
An area centred approximately 60 km south-southwest of Woomera was taken up to explore the IOCG mineralisation potential of an isolated, oval-shaped regional gravity anomaly called the Evelyn Dam prospect, which licensee Archer Exploration thought...-
Document
Published: 08 Apr 1912
-
RB 2007/00011 Original full content version of] OOLDEA, South Australia, [geological map] sheet SH52-12. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The OOLDEA 1:250 000 map area, in the far west of SA, includes portions of the Maralinga Tjarutja Aboriginal Lands, Maralinga Prohibited Area, and Nullarbor Regional Reserve. It is traversed by the Trans-Australian Railway. There is no significant...-
Document
Published: 01 Jun 2007
-
RB 2014/00005 WINTINNA, South Australia, [geological map] sheet SG53-14. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The WINTINNA 1:250 000 mapsheet area lies between latitudes 27° to 28° South and longitudes 133°30’ to 135°00’ East. This ~16 400 square km area includes the Marla and Cadney Park settlements, and is crossed by the Stuart Highway and Adelaide to...-
Document
Published: 01 Mar 2015
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-36, Dingo Hill (Cariewerloo Basin) Palaeozoic / Mesoproterozoic unconformity - related uranium mineral prospects. Project interim and final reports.
The Dingo Hill prospect lies within the eastern Gawler Craton, approximately 90 km west of Port Augusta. EL 3579 licensee Hindmarsh Resources is exploring for possible economic secondary stratiform uranium mineralisation associated with regional...-
Document
-
Lake Labyrinth (part of the Gawler and the Labyrinth Joint Venture Projects). Data release at second partial relinquishment : project licences' combined annual reports for the period 27/8/1999 to 28/9/2008.
In a continuation of exploration for economic deposits of gold and base metal mineralisation in the Lake Labyrith area, joint venture operator MIM Exploration carried out a proprietary 'MIMDAS' geophysical survey (utilising combined dipole-dipole IP...-
Document
Published: 18 Mar 1909
-
Ingomar Station and Phar Lap Outstation (part of Ingomar JV Project). Joint annual plus separate annual and final reports to licences' expiry/full surrender, for the period 13/6/2002 to 23/7/2007.
Work done on two licences covering inferred Challenger - type vein gold or Olympic Dam / Prominent Hill style IOCG mineralisation - prospective ground that is situated approximately 70 km to the south and south-east of Coober Pedy has been confined to...-
Document
Published: 22 Aug 1907
-
ExpNotes OOLDEA: Explanatory Notes OOLDEA
There is no abstract created for this record-
Document
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document