-
Mount Mitchell. Progress reports and final report to licence full surrender, for the period 20/10/1980 to 19/10/1982.
Exploration was undertaken for lode and alluvial tin mineralisation which might exist within ground adjacent to the abandoned Mount Mitchell tin mine, and also for reef gold in altered granite and dolerites outcropping adjacent to the numerous small...-
Document
-
Lake Hart. Progress reports to licence expiry/full surrender, for the period 5/9/1980 to 4/9/1982.
Airborne magnetic/radiometric surveys and follow-up gravity surveys carried out in a search for possible Olympic Dam type orebodies have indicated depths to magnetic basement in excess of 1000 m in the Lake Hart area of the Stuart Shelf. The...-
Document
Published: 06 Oct 1982
-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
Landsat thematic mapper study of the Yardea Dacite, Gawler Range Volcanics, YARDEA 1:250 000 scale map sheet.
The South Australian Department of Mines and Energy (SADME) commissioned the South Australian Centre for Remote Sensing (SACRS) to undertake a digital analysis of Landsat Thematic Mapper (TM) data in an attempt to locate prospective areas for...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-14, Pernatty Lagoon area (eastern Gawler Craton) IOCG mineral prospects. Project final report.
PACE proposal DPY3-14 aimed to discover a new iron oxide - associated copper-gold (IOCG) mineralised magmatic centre, similar to the Olympic Dam setting, within the eastern margin of the Gawler Craton. The Pernatty Lagoon project is located less than...-
Document
Published: 20 Sep 1906
-
Cocunda and Calca (Poochera Kaolin Project). Progress reports, annual reports, and final reports to licences' full surrender, for the period 12/5/1986 to 28/3/2002.
Kaolin, derived mainly from deep weathering of Hiltaba Suite granites, was the principal target of exploration in the area south and south-west from Poochera, near Streaky Bay on western Eyre Peninsula. Following a review made of historic drillhole...-
Document
-
Lake Gilles area. Data release made in lieu of submitting a partial surrender report upon licence renewal : progress reports for the period 26/10/1989 to 10/2/2001.
Menninnie Dam - style Pb-Zn mineralisation in areas north and east of Lake Gilles was the initial target of exploration. A ground magnetic survey conducted along five lines was followed by shallow auger drilling (302 holes, total 1099 m) plus lag,...-
Document
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Gilles Downs. Progress reports to licence expiry/renewal (as part of a larger area), for the period 12/3/1979 to 11/3/1981.
Ongoing diamond exploration by Stockdale over the PORT AUGUSTA 1:250,000 mapsheet area has concentrated on country to the east and south-east of Lake Gilles, where some microdiamonds and kimberlitic indicator minerals were discovered during the period...-
Document
Published: 18 Mar 1981
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 7/4/1975 to 6/4/1977.
Ongoing exploration for a possible Cattlegrid type stratabound copper deposit over an area south-west of Lake Torrens included aerial magnetic and EM surveys, drill testing of EM anomalies by 47 percussion holes totalling 2086 m, a regional magnetic...-
Document
-
Earea Dam Goldfield. Reports on preliminary drilling programmes and on a geological investigation undertaken over the period January 1988 to January 1989.
TARGET: Possible undiscovered economic gold lodes at the Earea Dam Goldfield, which could form a resource of a size suitable for open pit mining. EXPLORATION: Reconnaissance lode outcrop geochemical sampling, later detailed surface and underground...-
Document
-
Kangaroo Bluff (Lake Gairdner area). Progress reports to licence expiry/full surrender, for the period 2/8/1984 to 5/9/1985.
In a search for possible epithermal or sedimentary uranium deposits, plus any base metal mineralisation, in an area located east of Lake Gairdner and approximately 70 km south-west of Woomera, the licensee acquired a 6240 line km airborne...-
Document
-
Port Augusta (including Delhi Petroleum's Lake Torrens Salt Project). Progress reports and final report to licence expiry/full surrender, for the period 24/1/1980 to 23/1/1982.
Field tests continued as part of the salt project, to confirm salt crystallization and purification data. Results indicate that brine production rates and quality and quantity of salt output are comparable with the results from previous tests....-
Document
-
SADM / Amdel Project 1/1/122 : Geochronology of the younger granites of the Gawler Block and its north-western margin. Progress reports 1-32 for the period 10/7/1969 to 2/3/1982.
A SADM project to attempt to determine the ages of the youngest granites of the Gawler Block, of its north-western margin, and of known subsurface granites in the Officer and Eucla Basins, was initiated with Amdel in July 1969. The project aims to...-
Document
-
Coondambo. Progress reports and final report to licence full surrender,for the period 3/5/1977 to 3/2/1978.
As part of a regional search for possible buried Olympic Dam type, Middle Proterozoic basement-hosted base and precious metal deposits, a prominent aeromagnetic anomaly located just to the east of Pinery Dam was delineated and its source modelled by...-
Document
-
ExpNotes ELLISTON: Explanatory Notes ELLISTON
There is no abstract created for this record-
Document
-
RB 71/00057 Tarcoola-Alice Springs railway ballast seismic survey. Report no. 1. The Perfection Well area in Ingomar and McDonall 1:63 360 sheet areas - Commonwealth Railways.
There is no abstract created for this record-
Document
Published: 01 Jan 1971
-
RB 75/00049 Corunna barite deposit. Co. Hore-Ruthven, Eyre planning area EL 146.
There is no abstract created for this record-
Document
Published: 01 Jan 1975