-
RB 96/00012 Dryland salinity investigation, Toolillie Gully. Progress report no. 1 - Drilling programme.
Dryland salinisation is degrading land and water resources of Lower Eyre Peninsula. It decreases land production capabilities, water quality, and the general aesthetics of the environment. Interdepartmental investigations into the occurrence and...-
Document
Published: 01 Apr 1996
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-01, Central Eyre Peninsula (Karkarook area) Mesoproterozoic unconformity - style sedimentary uranium mineral prospects. Project interim and final reports.
Investigation of the potential of a known surface radiometrically-anomalous area 20 km west-southwest of Cleve to contain unconformity - style uranium mineralisation, inferred to occur at and just above the subsurface stratigraphic contact of...-
Document
Published: 31 Mar 1907
-
Lipson Cove - Tumby Bay area. Annual and final reports to licence expiry/full surrender for the period 2/9/2004 to 1/9/2008.
Geological mapping of an historically worked lamellar talc occurrence in the Tumby Bay area showed that snow white, finely flaky talc is present over a 2 km strike length within two beds of isoclinally folded schistose dolomitic limestone, but is of...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Yalanda East (part of the Eyre Peninsula JV Project). Annual reports and final report to licence surrender, for the period 22/10/2009 to 7/5/2014.
A small licence area composed of three separate sub-blocks, which is centred approximately 80 km south-west of Whyalla, has been explored for possible economic buried base metal and/or gold and/or uranium mineralisation that may have formed in...-
Document
Published: 30 Jul 1914
-
Carpie Puntha Hill. Annual reports, first partial surrender report, and final report to licence surrender, for the period 12/11/2010 to 2/5/2014.
An area centred approximately 30 km south-east of Kimba has been explored for possible economic buried base metal and/or gold and/or uranium mineralisation that may have formed in Archaean to Palaeoprotrozoic basement rocks in this part of the...-
Document
Published: 11 Jun 1914
-
Yalanda Hill. Annual reports and final report to licence full surrender, for the period 5/12/2005 to 20/3/2014.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the subject licence which is centred approximately 90 km south-west of Whyalla, initially consisted of a field reconnaissance using a spectrometer, and...-
Document
-
Peterlumbo. First partial surrender report for the period 1/9/1999 to 31/8/2001.
Gold and copper were the targets of exploration in the Peterlumbo Hill area, 40 km north of Kimba. 581 calcrete samples collected at 400 m centres outlined broad anomalous areas at > 5 ppb Au. Limited rock chip sampling, and 200 m infill calcrete...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-36, Dingo Hill (Cariewerloo Basin) Palaeozoic / Mesoproterozoic unconformity - related uranium mineral prospects. Project interim and final reports.
The Dingo Hill prospect lies within the eastern Gawler Craton, approximately 90 km west of Port Augusta. EL 3579 licensee Hindmarsh Resources is exploring for possible economic secondary stratiform uranium mineralisation associated with regional...-
Document
-
Woollinie. Progress reports and annual reports plus final report to licence full surrender, for the period 20/12/1991 to 20/11/1995.
Exploration for Broken Hill / Menninnie Dam type Pb-Zn, and later for iron oxide - associated Cu-Au, that was undertaken over an area located north of Kimba within and adjacent to the Pinkawillinie Conservation Park, comprised the acquisition during...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document
-
Corrobinnie Hill. Progress reports and annual reports to licence full surrender, for the period 8/5/1991 to 20/11/1995.
Exploration undertaken principally to search for possible buried Palaeoproterozoic iron oxide - associated copper-gold (IOCG) deposits within concealed bedrock, mostly within the north-western portion of the Pinkawillinie Conservation Park, comprised...-
Document
-
RB 2016/00030 Mineral Systems Drilling Program in the southern Gawler Ranges, South Australia.
The Mineral Systems Drilling Program (MSDP) was a $3.5M cash and $4.11M in-kind collaborative drill program involving government, researchers, service providers and the minerals industry. The objective of the MSDP was to further the understanding of...-
Document
Published: 01 Sep 2017