-
High Bluff. Progress reports and final report to licence full surrender, for the period 9/1/1978 to 23/2/1985.
Exploration for possible Alligator Rivers (Northern Territory) style uranium deposits occurring in potential host rocks (carbonaceous pelites and carbonate rocks) within an Early Proterozoic metasedimentary sequence underlying a Middle Proterozoic...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Cowell nephrite deposit. Technical appraisal reports submitted during the period 1970 to 1988.
A consultant geologist's reports prepared in 1970 for by mining lease optionholder Murumba Minerals NL describe his detailed mapping of the then known jade (nephrite) deposits within the Cowell Jade Province. Two potentially mineable deposits were...-
Document
Published: 08 Dec 1980
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 1918
-
Mount Olinthus. Progress reports plus interim final report to licence expiry/renewal, for the period 12/7/1978 to 7/11/1987.
TARGET: Unconformity related, vein-like and vein-type uranium in the Cleve Metamorphics, Katunga Dolomite and Mangalo Schist; lead-zinc sulphides of Broken Hill or Balmat-Edwards type in the Hutchison Group. EXPLORATION: Uranium exploration...-
Document
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 16 - Cockabidnie Project airborne 25Hz TEMPEST electromagnetic geophysical survey. Project PT1-16 final report.
To help with exploration of the ~ 5 km long, NNE trending Kimban Campoona Syncline region located on central Eyre Peninsula, to look for a large range of potentially economic basement-hosted polymetallic and other mineral occurrences including iron...-
Document
Published: 15 Oct 1912
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 1919
-
Data release - as updated : Cockabidnie. Annual reports and final report to licence expiry/full surrender, for the period 31/5/2001 to 13/8/2015.
Early in 2001, Helix Resources Ltd entered into a joint venture agreement with Centrex Resources Limited to allow it to explore for precious and base metals on some of the tenements held by Centrex on the Eyre Peninsula in South Australia, including...-
Document
-
Data release - as updated : Kimba. Annual reports to licence expiry/full surrender, for the period 6/11/2006 to 5/11/2018.
A large, 705 square km area surrounding Kimba township was taken up to explore for possible economic buried deposits of Mount Isa or Broken Hill style base metals (Cu-Pb-Zn-Ag), and Tanami style lode gold. The licence lay in the northern part of the...-
Document
Published: 09 Jan 1919
-
Sleaford Mere. First annual report, plus final report to licence expiry/full surrender, for the period 19/6/2014 to 18/6/2016.
Exploration of an area extending for ~9 km along the western, shore-land side of the Sleaford Mere lagoon, located near the southern tip of Eyre Peninsula, has mainly sought to identify possible untested buried graphite occurrences which could be...-
Document
-
Mount Hill (part of the Gum Flat Iron Ore Project). Final report at licence full surrender, for the period 25/2/2008 to 27/8/2015.
A small part of the Lincoln Uplands on east-central Eyre Peninsula, which is centred ~20 km north-east of Cummins, has been explored for possible economic buried graphite and/or base metal mineralisation that may have formed in metamorphosed...-
Document
Published: 22 Jun 1915
-
Wanilla (originally part of the Wanilla JV Project). Annual reports submitted until the commencement of licences' joint reporting for the Gum Flat Iron Ore Project, for the period 13/2/2007 to 12/2/2010.
A large north-south orientated area centred ~45 km north-west of Port Lincoln was taken up to explore for possible buried Archaean komatiite-hosted nickel, volcanic hosted massive sulphides (base metals), orogenic lode gold, BIF-hosted iron ores and...-
Document
Published: 01 Jun 1910
-
Green Patch. Progress, annual and final reports to licence surrender for the period 8/7/1991 to 1/3/1996.
Following a review of previous company exploration and image interpretation of SAEI and BMR aeromagnetic data, a 3166 line km airborne magnetic/radiometric survey, with follow-up ground magnetics and air core drilling (282 holes, 4559 m), was carried...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document
-
Lincoln Uplands area. Progress and final reports to licence expiry/full surrender for the period 9/12/1971 to 8/12/1972.
Exploration conducted primarily for base metals, over an area extending for 5-50 km north of Port Lincoln, has consisted of soil sampling on a 1/4 mile grid spacing along a line 5000 feet west of the Butler Tanks magnetic trend, check geological...-
Document
-
Mount Messenger. Second partial surrender report, for the period 25/5/1973 to 13/2/1976.
1069 square km or ~79.5% of the originally granted area of EL 218 have been relinquished to comply with the licence conditions previously agreed to with SADM for renewing of tenure at the expiry of the company's former EL 67. Work undertaken on the...-
Document