-
Lilydale. Data release made in lieu of submitting a first partial surrender report : progress reports, annual reports and final report to licence expiry/renewal over a much reduced area, for the period 5/1/1988 to 4/1/1993.
Initial exploration carried out near Lilydale Homestead, 80 kilometres south-east of Yunta, targeted possible Starra-style gold in the Braemar Ironstone facies. Flying of an airborne semi-detailed magnetic and radiometric survey identified magnetic...-
Document
-
RB 77/00101 Hydrogeology of Rocky Gully Creek area, east of the Pallamanna Fault.
Three groundwater observation wells have been drilled at locations north-west of Murray Bridge to determine the effect of increased stream flows down the Rocky Gully and Preamimma Creeks. Rocky Gully Creek will be capable of accepting about 10 000 m...-
Document
Published: 01 Jan 1977
-
RB 79/00017 Completion report irrigation well for D.J. and N.P. Mount, secn 11 Hd Kingsford, Co. Chandos.
The well has been drilled into an area of low salinity groundwater occurring within the Tertiary limestone aquifer at Karte, north-west of Pinnaroo. A 48-hour well test was carried out at an average pumping rate of 2600 m3/day (23,800 gals/hr), and...-
Document
Published: 01 Jan 1979
-
RB 77/00132 Hydrogeology of the Paragum Depression, Monarto SA.
Cable tool and rotary drilling of 8 holes has enabled the geological sequence and general hydrology to be determined in the area to appraise its potential as a disposal site for stormwater runoff from urbanised Monarto.-
Document
Published: 01 Jan 1977
-
RB 95/00022 Five year technical review, 1991-1995 - Border (Groundwater Agreement) Act, 1985.
The Groundwater (Border Agreement) Act of 1985 legislated to provide a framework for the joint management of groundwater resources within a 40 km wide strip along the length of the South Australian and Victorian Border, which is referred to as the...-
Document
Published: 01 Jun 1995
-
RB 91/00009 Border Groundwater Agreement five-year groundwater resource assessment review, 1986-1990. Report.
South Australian investigations have concentrated on defining the nature of the Tertiary limestone aquifer and determining aquifer recharge rates in Zones 3A-7A, to enable a reassessment of groundwater resources for Zones 2A-8A. An examination of the...-
Document
Published: 01 Jan 1991
-
RB 96/00017 River Murray water resource management. Assessment of salt load impacts and drainage hazard for new irrigation development along the River Murray in South Australia.
The Murray-Darling Basin Commission (MDBC) has a commitment in the national interest to managing the health of the River Murray and floodplain environment by mitigating both decreases in river water quality and associated environmental degradation...-
Document
Published: 01 May 1996
-
Karoonda and Parrakie. Individual licence progress reports to licences' joint expiry/full surrender, for the period 2/9/1986 to 13/6/1991.
TARGET: Possible economic heavy mineral sand accumulations in Pliocene raised beach strandlines developed along the south-western margin of the Murray Basin. EXPLORATION: Aerial photo interpretation, regional sedimentological studies, preliminary...-
Document
Published: 05 Jun 1991
-
RB 69/00068 Review of groundwater hydrology adjacent to the River Murray in SA. Progress report no. 8, Kingston-Loxton-Renmark area.
This report completes a trilogy which surveys the regional groundwater situation along the River Murray, upstream of Blanchetown as far as the N.S.W, Victorian border. The area covered in the present report lies upstream of Kingston on Murray. The...-
Document
Published: 01 Jan 1969
-
RB 66/00060 Chowilla Project. Saline water disposal, Tilmy Flat. Geological investigation progress report no. 3. Co. Hamley - EWS Department.
This report describes the results of geological investigations carried out on the right bank of the River Murray, at and adjacent to Tilmy Flats. A summary of the work is as follows: 8 shallow observation wells to detect lateral movement of...-
Document
Published: 01 Jan 1968
-
RB 75/00010 Tepko sand deposit.
Coarse sands and gravels equivalent to the Parilla Sand Formation outcrop in road and rail cuttings situated 4 km north of Tepko railway station. Selective auger drilling (13 holes for a total penetration of 102.5 m) done on sections 107 & 110,...-
Document
Published: 01 Nov 1974
-
RB 75/00070 Recharge investigations, northern margin of the Milang Basin. Milang-Langhorne Creek area.
There is no abstract created for this record-
Document
Published: 01 Jan 1978
-
RB 74/00152 Investigation of potential evaporation basins, Upper Murray, South Australia. Progress report 1. Appendix Analogue model experiments to determine saline groundwater flow into the Murray River system
Groundwater flow in the Upper Murray region is generally towards the River Murray except in the Noora area where contours show a depression in the water table surface. The Noora area appears to be the most suitable site for an evaporation basin for...-
Document
Published: 01 Jan 1974
-
RB 76/00016 Investigation of potential evaporation basins, Upper Murray, South Australia. Progress report no. 3.
Further drilling and aquifer testing between the proposed Noora evaporation basin and the River Murray yielded an average value of about 100 m3/day/m for transmissivity of the Loxton Sand aquifer. It is therefore expected that initial effects of such...-
Document
Published: 16 Feb 1976
-
RB 76/00008 Monarto new town. Proposed city centre. Geotechnical investigations report no. 2.
Engineering geological investigations consisting of cable tool drilling of 10 holes up to 15.25m deep, penetration testing and seismic refraction surveys were completed at the proposed CBD of the Monarto city centre. Drilling encountered thin...-
Document
Published: 02 Feb 1976
-
RB 76/00107 Stratigraphy and engineering geology of the Monarto designated area - Monarto Development Commission.
Drilling of 25 cable tool holes to depth up to 20.1m in the designated area for Monarto New Town illustrates the nature, distribution and thickness of Quaternay and Tertiary sediments. The main tertiary units are the marine fossiliferous limestone of...-
Document
Published: 01 Jan 1976
-
Blanchetown. Annual report and final report to licence expiry/full surrender, for the period 25/2/2008 to 24/2/2010.
An area of the western Murray Mallee located near Blanchetown has been explored for possible economic heavy mineral sand accumulations in Pliocene raised beach strandlines. At the outset, the licensee performed a field inspection and drew up measured...-
Document
-
Mantung (part of the Murray Basin Project). Second partial surrender report, for the period 14/10/1997 to 15/10/2013.
A block comprising 319 square km or ~12.7% of the north-western corner of EL 5223 has been relinquished due to its now perceived diminished prospectivity for containing economic heavy mineral sands mineralisation, due to the apparent general absence...-
Document
-
Blanchetown. First partial surrender report, for the period 25/2/2008 to 27/5/2009.
Two separate licence portions together totalling 270 square km or ~33.5% of the former area of EL 4052 have been partially relinquished due to their perceived diminished potential to contain shallow Tertiary heavy mineral sands occurrences. Licensee...-
Document
-
RB 2003/00013 North-western Murray Basin geological synthesis, South Australia.
The Murray Basin is an intracratonic basin filled with Cainozoic fluvial to shallow marine sediments. Deposition in the Eocene and early Oligocene was characterised by floodplain and swamp deposits, emplaced with occasional interbeds of shelly clays...-
Document
Published: 01 Aug 2003