Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Anna Creek (the Peake and Denison Project). Annual reports to licence expiry/full surrender, for the period 25/10/2019 to 24/10/2021.
A large area centred ~15 km to the south-east of Algebuckina on the Oodnadatta Track has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo- to Mesoproterozoic rocks like those...-
Document
Published: 15 Nov 1921
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Peake Hill. Annual reports to licence expiry/full surrender, for the period 9/7/2013 to 8/7/2017.
A small area located on and adjacent to the eastern margin of the Denison Range, ~ 60 km south-east of Oodnadatta, has been explored for possible buried economic sediment-hosted uranium mineralisation. During licence Year 1 the licensee reviewed all...-
Document
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Edward Creek, Peake Rise and Cootanoorina Hill (the Cootanoorina IOCG Project). Annual and joint annual reports, plus final report to project licences' respective expiry/full surrender, for the period 6/4/2015 to 5/5/2017.
During all of 2015, Cootanoorina Project operator Kingston Resources continued to perform geophysical data processing and modelling, in part using all of the new detailed gravity data that it had acquired in 2014 (548 stations on EL 5487, 102 stations...-
Document
Published: 23 May 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Denison. Second annual report for the period 13/3/2016 to 12/3/2017.
During licence Year 2, work comprised: • providing ongoing land access notifications to relevant landholders and the Native Titleholders; • acquisition over the entire tenement in April 2016 of the second phase of a ground gravity survey, consisting...-
Document
Published: 12 Mar 1917
-
Data release [made at SA Director of Mines' discretion] : Mount Denison. Annual report for the period 13/3/2015 to 12/3/2019.
A small area centred ~80 km south-east of Oodnadatta is being explored for possible buried economic iron-oxide associated copper-gold-uranium (IOCGU) style mineralisation, as typified by the Olympic Dam and Prominent Hill deposits. The tenement was...-
Document
Published: 12 Mar 1916
-
Mount Kingston. Progress reports and final report to licence expiry/full surrender, for the period 10/10/1979 to 26/4/1984.
Diamond exploration undertaken over an area situated 70 km south-east of Oodnadatta included photogeological studies, the acquisition of a 2400 line km low level aerial magnetic and radiometric survey, and geochemical analyses of 452 reconnaissance...-
Document
-
Peake and Denison Ranges. Progress reports and technical reports to licence expiry/full surrender, for the period 17/2/1969 to 4/5/1971.
An airborne magnetic/radiometric survey was flown over the licence in 1969. Three anomalies located near Peake Homestead Ruins and the Coppertop mine gave disappointing ground survey uranium responses from traverses made with a hand-held...-
Document
-
Mount Denison. Progress reports and final report to licence full surrender, for the period 13/5/1991 to 22/3/1993.
Possible economic epithermal/hydrothermal uranium and base metal deposits hosted by Early to Middle Proterozoic meta-igneous and metasedimentary basement rocks in the northern Peake and Denison Ranges were the primary targets addressed by CRA in their...-
Document
-
Mount Charles. Progress reports and final report to licence full surrender, for the period 9/12/1991 to 26/10/1992.
Possible economic epithermal/hydrothermal uranium and base metal deposits, hosted by Early to Middle Proterozoic meta-igneous and metasedimentary basement rocks partly concealed by Mesozoic and Cainozoic cover in the north-eastern Peake and Denison...-
Document
Published: 13 Nov 1992
-
Algebuckina. Progress, annual and final reports to licence surrender for the period 4/4/1979 to 3/10/1980.
Four photo-interpreted possible buried kimberlite structural targets that were indicated in the Algebuckina area were investigated by a field programme of drainage and soil geochemical sampling (39 samples) and scintillometric surveying. Three areas...-
Document
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Algebuckina and Peake [Algebuckina South]. Third and second partial surrender respectively : reports for the period 3/8/2004 to 2/8/2009.
Data from part of a heliborne EM survey conducted in September 2007 over the now relinquished portions of EL 3226 has been released. This survey was flown in a search for possible stratabound roll-front style or palaeochannel hosted sedimentary...-
Document
Published: 12 Mar 1910
-
Algebuckina. Fifth partial surrender report, for the period 3/8/2004 to 28/9/2012.
Portions of the subject licence located at the northern end of the Peake and Denison Ranges have been relinquished owing to their perceived lower exploration potential. All of the reported work that was done within these licence portions pertains to...-
Document
Published: 12 Oct 1912
-
Algebuckina. Fourth partial surrender report, for the period 3/8/2004 to 28/9/2010.
Three now relinquished licence portions located along the western margin of the Denison Inlier have been explored for possible economic stratabound roll-front style or palaeochannel hosted sedimentary uranium deposits, inferred as likely to have...-
Document
Published: 01 Feb 1911
-
Peake. Annual reports and final report to licence expiry/full surrender, for the period 3/8/2004 to 28/9/2014.
An area located to the west and south of the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, has been explored for possible roll-front style sedimentary uranium deposits...-
Document
Published: 01 Oct 1914