-
Stuart Creek. Progress reports to licence expiry/renewal, for the period 13/5/1977 to 12/5/1979.
Stratiform base metal sulphide deposits and sedimentary uranium accumulations were targeted in the Stuart Creek area, which straddles the Torrens Fault on the eastern margin of the Stuart Shelf. Two airborne magnetic and radiometric surveys totalling...-
Document
-
Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
Woomera, Portulacca Ridge and Red Lake. Joint final report at licences' joint full surrender, for the period 15/2/1983 to 7/11/1986.
The three licences now being surrendered were originally taken out by Seltrust in the mid-1970s to search for stratabound base metals and Olympic Dam type mineralisation. After Seltrust withdrew from the subsequently formed Stuart Shelf joint venture...-
Document
-
Gulnare. Combined first annual / final report at licence expiry/full surrender for the period 23/1/2008 to 22/1/2009.
Exploration for possible Neoproterozoic sediment-hosted, unconformity related buried uranium deposits within a synclinally-exposed area of reduced Warrina Supergroup siliclastic rocks, 160 km north of Adelaide, followed a concept that such deposits...-
Document
Published: 02 Dec 1908
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-03, Marathon South mineral prospect. Project interim and final reports.
During exploration of Exploration Licence 3209 situated on the northern Stuart Shelf, gravity and magnetic modelling performed in early 2004 highlighted several anomaly source bodies, which immediately became of much interest as potential iron-oxide...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Belton, Two Sisters, Marchant Hill and Steve's Gap (Orroroo Project). Joint annual and final reports to licences' expiry/full surrender for the period 16/2/2007 to 15/2/2009.
Exploration for possible economic secondary deposits of copper, uranium and gold that might be associated with known iron-rich sediments deposited at or near the base of the Sturtian sedimentary sequence, carried out within four tenement areas that...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Fitton. Annual reports for the period 20/9/2010 to 19/9/2018.
An area comprising two separate sub-blocks located in the northern Flinders Ranges, which adjoins outside the western outcrop edge of the Mount Painter Inlier, has been taken up to explore for possible buried primary, bedrock-hosted vein or breccia...-
Document
Published: 13 Nov 1918
-
Willow Springs. Annual reports and final report to licence expiry/full surrender, for the period 1/12/2011 to 30/11/2016.
An area centred ~65 km north-east of Hawker in the Central Flinders Ranges, and located adjacent to the eastern side of the Oraparinna Diapir, has been explored for possible buried economic epigenetic copper, gold and uranium mineralisation. During...-
Document
Published: 03 Jan 1917
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
Tthe Stuart Range Joint Venture Project. Joint progress reports and final report to licences' joint full surrender, for the period 21/4/1980 to 31/3/1981.
When Getty Oil took over management of the Stuart Range Project licences, it reviewed all of Newmont's drillhole data and undertook reclogging of the drill cores with the aim of correlating stratigraphy across the project area. Starting in October...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-02, Titan mineral prospect. Project interim and final reports.
Titan prospect is located within Exploration Licence 3209, and lies 30 km north of the Olympic Dam mine. The prospect was first drilled by Western Mining Corp. in 1976 with diamond drillhole BD 1, and in 1981 with a second hole, BD 2. Both holes hit...-
Document
-
Copley and Wearing Gorge areas. Joint annual reports to licences' surrender, for the period 18/6/2007 to 1/11/2011.
Several small areas in the vicinity of the Mount Coffin Diapir, which covers ~5 square km within the north-central Flinders Ranges immediately to the south-east of Copley, have been explored with the hope of finding additional copper resources near...-
Document
Published: 05 Sep 1911
-
Yeltacowie, Hesso, Charlinga, Bowen Hill and Kangaroo Bluff (the Stuart Shelf Project). Joint annual reports and final report to licences' joint full surrender, for the period 16/8/2005 to 14/2/2014.
Uranium One Australia (U1A) acquired the Stuart Shelf Project tenements in 2005 with the aim of exploring for uranium mineralisation that has unconformity - related genetic features broadly analogous to those of deposits of the Athabasca Basin in...-
Document
Published: 28 May 1914
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-01 - South Australia Ludi Mining Pty Ltd, Coward Springs area gravity/magnetic anomaly IOCG targets. Drilling project interim report and final report.
South Australia Ludi Mining Pty Ltd (“SALM”) acquired Exploration Licence 4619 “Coward Springs” to explore for large Mesoproterozoic copper/gold/uranium deposits analogous to Olympic Dam, which is located approximately 120 km to the south. The licence...-
Document
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
Port Pirie. Progress reports and final report to licence full surrender, for the period 21/8/1979 to 30/6/1982.
Continuing exploration for possible buried Mount Gunson and Olympic Dam type copper deposits, or other stratabound base metal occurrences within shelfal facies of Adelaidean sediments or in the pre-Adelaidean Wandearah Formation Carpentarian age...-
Document