-
Harris Bluff (Uno Station). Progress reports and final report to licence full surrender, for the period 7/9/1982 to July 1986.
Exploration undertaken over an area located 60 km west of Port Augusta targeted possible Broken Hill or Aggeneys - Gamsberg type massive Pb-Zn deposits within Early Proterozoic Hutchison Group banded iron formation metasediments, and also any Early...-
Document
-
Cooyerdoo Station. Progress reports to licence expiry/re-issue as part of another licence, for the period 14/9/1981 to 13/3/1983.
Following the signing of an eighteen month exploration joint venture agreement with Stockdale, farminee Mobil Energy Minerals undertook continuation of the uranium search over the anomalous ground lying east and south-east of Lake Gilles, besides...-
Document
Published: 12 Apr 1983
-
Kimba area (Caralue Bluff). Progress reports and final report to licence expiry/full surrender, for the period 21/8/1979 to 9/6/1986.
An intensive search for possible banded iron formation - related Proterozoic stratiform lead-zinc mineralisation, of Gamsberg / Aggeneys / Broken Hill style, over an area surrounding Kimba on Eyre Peninsula, has included aerial magnetic and...-
Document
-
Lake Gilles area. Data release made in lieu of submitting a partial surrender report upon licence renewal : progress reports for the period 26/10/1989 to 10/2/2001.
Menninnie Dam - style Pb-Zn mineralisation in areas north and east of Lake Gilles was the initial target of exploration. A ground magnetic survey conducted along five lines was followed by shallow auger drilling (302 holes, total 1099 m) plus lag,...-
Document
-
Sheoak Hill. Progress reports to licence expiry/full surreender, for the period 15/3/1983 to 14/3/1988.
TARGET: Stratiform lead-zinc-silver mineralisation of the Broken Hill or Aggeneys - Gamsberg type, associated with banded iron formations in Early Proterozoic metasediments. EXPLORATION: Data from the 1975 joint SADME / BMR Barna 1:100 000 scale...-
Document
-
Carappee Hill. Progress reports to licence expiry/full surrender for the period 8/7/1983 to 7/7/1984.
Possible exhalative sulphide orebodies of the Broken Hill - Aggeneys type, associated with Lower Proterozoic banded iron formations that are known to be Pb-Cu anomalous in the Cleve area (Campoona Syncline) 35 km to the south-east, were the prime...-
Document
-
Strawberry Hill. Progress and final reports to licence expiry for the period 4/10/89 to 3/1/94.
Exploration in the Wanilla - Cummins area searching for economic accumulations of heavy minerals in Eocene sands comprised 2 phases of aircore drilling (167 holes, total 4049 m). A resulting drill intersection yielded a 0.72% heavy-mineral...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-30 - Trafford Resources Ltd, Wilcherry Hill Project, Oxy's Bore prospect magnetic anomaly IOCG target. Drilling project final report.
Trafford Resources Ltd ('Trafford'), the owner since March 2007 of the seven exploration licences comprising the Wilcherry Hill Project, has as its primary focus exploration of these tenements for economic precious and base metal deposits. The...-
Document
-
Cowell. Progress reports to licence full surrender, for the period 27/7/1981 to 7/7/1982.
Appraisal of the southern Middleback Range to Cowell area for possible buried diamondiferous kimberlites and for economic extensions to stratiform iron ore deposits was undertaken. A limited drainage bulk sampling programme was unsuccessful in...-
Document
Published: 27 Aug 1982
-
Port Neill. Annual reports and final report to licence surrender, for the period 26/5/1997 to 29/4/1999.
Calcrete and rock chip sampling, the latter including outcrop follow-up of weakly anomalous Cu and As found in re-assayed drillcore, was carried out in the hinterland to Port Neill, 80 km north-east of Port Lincoln. Calcrete Au results peaked at only...-
Document
-
Mount Messenger. Progress reports and final report to licence expiry/full surrender, for the period 27/11/1992 to 26/11/1994.
Lead-zinc exploration undertaken in the vicinity of Mount Messenger, and which also covered an area extending from 5 km to 50 km south-eastwards of Kimba, comprised the acquisition during November 1993 of a 4386.5 line km airborne magnetic /...-
Document
-
Green Patch. Progress, annual and final reports to licence surrender for the period 8/7/1991 to 1/3/1996.
Following a review of previous company exploration and image interpretation of SAEI and BMR aeromagnetic data, a 3166 line km airborne magnetic/radiometric survey, with follow-up ground magnetics and air core drilling (282 holes, 4559 m), was carried...-
Document