-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-21 - Mulyungarie area - Junction Dam Palaeoproterozoic metasedimentary/volcanogenic base metal and precious metal mineral prospects. Project interim and final reports.
In 2008, as part of work being performed for it to earn a 51% interest in the Mundi Mundi Plains joint venture exploration licences, Teck Cominco identified two geophysical targets within South Australia on Kalkaroo EL 3328 which it thought were...-
Document
-
Emu Dam (formerly Billeroo West). Data release in lieu of partial relinquishment upon licence renewal (as EL 2878) : annual reports for the period 4/11/1996 to 3/11/2001.
Exploration for possible economic Early Proterozoic stratabound Pb-Zn-Ag deposits of Broken Hill type, and for Olympic Dam style, Middle Proterozoic Benagerie Ridge volcanogenic sediment - hosted, epithermal / hydrothermal Cu-Au-Mo(-U) occurrences of...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-54, Bonython Hill mineral prospect. Project interim and final reports.
EL 2788 (Bonython Hill) covers 120 square km of the Broken Hill Domain, and is regarded as being prospective for Broken Hill - type (BHT) lead-zinc-silver mineralisation and for iron oxide - associated copper-gold (IOCG) deposits. As one of its PACE...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-06, Mingary area stratiform, Broken Hill type base metal mineral prospects. Project final report.
Historic drilling undertaken on the NSW side of the state border with SA, adjacent to EL 2820, has encountered quartz-gahnite, meta-iron formation and meta-amphibolite rock types that have been correlated with the highly base metal - prospective...-
Document
-
Kalabity (part of the Strathearn Joint Venture Project). Data release at licence expiry/full surrender : progress reports and annual reports for the period 4/7/1988 to 15/10/2003.
The initial manager of the joint venture, CRA Exploration Pty Ltd (CRAE), targeted a range of copper, gold and uranium mineralisation styles, including vein-style uranium associated with carbonate rocks (Kintyre model), Olympic Dam style...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Boolcoomata (part of the Drew Hill Project). Final report at licence expiry/full surrender for the period 30/9/2003 to 29/9/2008.
An area situated on Boolcoomata Station, ~35 km east-northeast of Olary, was explored both for possible epithermal/hydrothermal copper-gold-molybdenum deposits and for hydrothermal or stratiform/syngenetic base metal deposits that may have formed...-
Document
Published: 29 Apr 1909
-
Bundera Well. Annual reports and final report to licence expiry/full surrender, for the period 27/6/2000 to 26/6/2005.
Possible buried Palaeoproterozoic stratiform to stratabound Cloncurry style Cu-Au mineralisation was the principal objective of exploration undertaken over an area located approximately 60 km north-east of Olary. Other conceptual targets included...-
Document
-
Data release : Goulds Dam. Annual reports submitted until the commencement of licence joint reporting with EL 3906 Katchiwilleroo Dam, for the period 18/3/1997 to 26/8/2009.
An area located on the southern edge of the Mesozoic to Tertiary Frome Embayment, 100 km north-west of Olary, which overlies Proterozoic igneous and metamorphic basement of the Curnamona Province, is being explored primarily for possible buried...-
Document
Published: 01 Feb 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Mingary. Annual reports for the period 21/6/2001 to 5/7/2014.
An area located close to the SA-NSW State border, and centred ~55 km west-southwest of Broken Hill, covers part of the south-eastern corner of the Palaeoproterozoic Olary Domain of the Curnamona Province and the western portion of Broken Hill Domain,...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : North-west of Cockburn area. Annual reports for the period 22/10/2009 to 21/10/2014.
An area centred located approximately 80 km west of Broken Hill and 19 km north-west of Cockburn is being explored for possible buried economic Broken Hill type stratiform Pb-Ag-Zn mineralisation. The tenement is also prospective for Kalkaroo or...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Outalpa (part of the Curnamona Project). Annual reports for the period 10/6/2012 to 9/6/2018.
The Outalpa (EL 3472) licence area, comprised of two separate sub-blocks respectively centred ~30 km north-northeast and ~45 km north-northwest of Manna Hill, is one of five adjacent tenements held by PepinNini Minerals within the eastern Adelaide...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2005 to 20/4/2010.
An area of shallowly covered Curnamona Province metalliferous basement rocks abutting the South Australia / New South Wales border, approximately 80 km north-east of Olary, is believed to be prospective for Broken Hill and McArthur River style...-
Document
Published: 06 Oct 1910
-
Billeroo Creek. Progress reports for the period 17/5/88 to 16/2/91.
TARGET: Broken Hill-style Pb-Zn mineralisation in the northern Olary region. EXPLORATION: Ground magnetics, an IP survey and rotary drilling (21 holes, total 1475 m). RESULTS: Low levels of copper and gold were present at the Waltherco Hut prospect.-
Document
Published: 06 Mar 1991
-
Togo Dam. Progress and final reports to licence surrender for the period 9/1/1991 to 19/3/1993.
Exploration for Hunters Dam style stratiform lead-zinc mineralisation in the Benagerie area, in geochemically anomalous Palaeoproterozoic basement units equivalent to the Bimba Formation of the Willyama Supergroup, which overlies the magnetite - rich...-
Document
Published: 06 May 1993
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2010 to 1/6/2018.
During 2010-2011, the sixth year of the subject licence, as part of its continuing search for buried economic Tertiary sediment-hosted roll front style secondary uranium deposits, Marmota conducted the following work: • acquired a 58.6 line km moving...-
Document
Published: 17 Jul 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Wadnaminga and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 19/7/2008 to 18/7/2018.
During Year 12 of the Olary JV Project (2008-2009), field work was undertaken only on EL 3849 Outalpa to make up for the earlier underspending on that licence relative to commitments. In early 2009, a ground radioactivity survey was acquired using a...-
Document
Published: 27 Nov 1918
-
Report on the regional photogeological mapping of the Willyama Block in SA, based on the study of small-scale colour aerial photographs. (Appendix 1 in yearly report to 23/9/1977).
Regional lithostructural geological map of all outcropping Middle Proterozoic rocks presented as 6 maps, scale 1:100000.-
Document
-
Bimbowrie Hill. Progress reports to licence surrender for the period 22/10/1973 to 8/6/1976.
Exploration for possible economic stratiform, Broken Hill type base metal deposits hosted within Willyama Complex metasediments in the Bimbowrie Hill - Ameroo Hill area has consisted of a structural interpretation of aerial photos and ERTS imagery,...-
Document