Landsat thematic mapper study of the Yardea Dacite, Gawler Range Volcanics, YARDEA 1:250 000 scale map sheet.
The South Australian Department of Mines and Energy (SADME) commissioned the South Australian Centre for Remote Sensing (SACRS) to undertake a digital analysis of Landsat Thematic Mapper (TM) data in an attempt to locate prospective areas for...-
Document
-
RB 97/00057 Gawler Craton excursion guide - September 21-26, 1997.
This 5-day field excursion was mounted by the GSSA to inform government and industry participants about significant newly identified geological features within the central Gawler Craton which are the subjects of ongoing study. The itinerary chosen...-
Document
Published: 19 Sep 1997
-
Kolendo. First annual and final report to licence expiry for the period 10/3/2004 to 9/3/2005.
Gawler Range Volcanics outcrop and subcrop near some NW-SE trending regional magnetic lineaments passing south-east of Lake Gairdner, were investigated for possible shear-related epithermal / hydrothermal gold occurrences. Limited rock chip and soil...-
Document
-
Wipipippee Hill. First partial surrender report, for the period 3/5/2012 to 2/5/2016.
Two separate blocks of ground in the centre and the east of EL 4865, together comprising ~43% of the original area of the licence, have now been relinquished. To date, exploration work undertaken generally on the licence has focused on data...-
Document
-
Toondulya Bluff. First annual and final report for the period 21/9/99 to 1/2/2000.
Detailed gravity survey results obtained over a regional anomaly recognised 90 km north-east of Streaky Bay were not typical of an iron oxide body likely to host a Cu/Au deposit, but were more consistent with an expected gravity signature of a mafic...-
Document
-
Unalla Hill, Moonaree and South Lake Gairdner (Lake Gairdner Project). Annual and final reports for the period 25/10/96 to 24/10/99.
Exploration targeted Olympic Dam style mineralisation associated with Hiltaba Suite intrusives and Gawler Range Volcanics at the southern end of Lake Gairdner, between Mount Ive and Moonaree. Sampling of poorly developed calcrete together with rock...-
Document
Published: 02 Dec 1998
-
Yardea. Annual reports to licence expiry/full surrender, for the period 7/6/1996 to 6/6/1998.
Regional calcrete geochemical sampling carried out approximately 140 km north-east of Streaky Bay has outlined a northeasterly-trending 5 km x 1.5 km area containing weakly anomalous gold values of 3-9 ppb Au (Toondulya prospect), which appear to be...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Nonning (latterly part of Terramin's Menninnie Zinc Project). Annual reports for the period 30/3/2006 to 30/11/2012.
An area centred ~70 km north of Kimba, which also lies about 7 km north of the Menninnie Dam lead-zinc-silver deposit, was taken up to explore for possible buried economic volcanic epithermal/hydrothermal Mesoproterozoic Fe-rich Cu-Au mineralisation...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Kolendo [not "Taringa"] (part of the Menninnie Zinc Project). Annual reports for the period 21/2/2011 to 20/2/2013.
An area located adjacent to the southern margin of the Gawler Ranges, that includes some exposures of Mesoproterozoic Gawler Range Volcanics (GRV), and which at its southern boundary lies approximately 15 km north-east of the Menninnie Dam Pb-Zn-Ag...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gairdner - Unalla Hill (part of the Mount Ive Project). Annual reports for the period 7/6/2013 to 6/6/2015.
A licence consisting of three separate small sub-blocks located on the northern part of Mount Ive Station is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal Au-Ag-(Cu) vein...-
Document
-
Data release [made at SA Director of Mines' discretion] : Tanner (part of the Mount Ive Project). First annual report for the period 01/8/2014 to 31/7/2015.
A licence area centred on Tanners Dam which is located ~26 km south-west of Lake Gairdner is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal Au-Ag-(Cu) vein style...-
Document
-
Data release [made at SA Director of Mines' discretion] : Thurlga. First annual report for the period 28/11/2014 to 27/11/2015.
A large area of the southern Gawler Ranges comprising two separate sub-blocks has been taken up to allow Menninnie Metals to conduct further regional exploration to try to delineate structurally controlled hydrothermal Ag-Zn-Pb and epithermal...-
Document
-
Charba Hill, Peltabinna Hill and Unalla Hill. Joint progress reports plus joint final report to licence full surrender, for the period 22/12/1989 to 14/11/1990.
TARGET: Possible epithermal gold and base metal deposits associated with volcanic centres; related hydrothermal alteration deposits; and diamonds. EXPLORATION: Regional and follow-up geochemical sampling (gravel, stream sediment and rock chip, plus...-
Document
Published: 10 Dec 1990
-
Data release - as updated [made at SA Director of Mines' discretion] : Kolendo, Taringa, Nonning, Wipipippee and Menninnie Dam (the Menninnie Project). Joint annual reports for the period 1/1/2013 to 31/12/2016.
The Menninnie JV Project area consists of five contiguous exploration licences, and is considered prospective for Pb-Zn-Ag-Cu-Au-Mo-U deposits associated with past epithermal, porphyry, IOCG and skarn - forming geological environments. It lies in a...-
Document
-
Yarna Hill. Annual reports to licence expiry/full surrender for the period 19/11/2002 to 4/12/2010.
An area of sparse basement outcrop situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data...-
Document
-
Palthrubie Hill. Annual reports to licence expiry/full surrender for the period 21/5/2002 to 4/12/2010.
An area situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data which indicated that a number...-
Document
-
RB 2015/00014 Chief Government Geologists' excursion, 2015.
This report contains the excursion guide for the field trip which was held as part of the Chief Government Geologists' Meeting convened in South Australia on 23rd and 24th March 2015. The focus of the field trip was to see rocks of the Gawler Range...-
Document
Published: 01 May 2015
-
RB 2016/00024 Mineral Systems Drilling Program Rock Shack - [a pictorial catalogue of the] outcrop sample collection for the MSDP southern Gawler Ranges margin.
Between July 2015 and April 2016, the Geological Survey of South Australia, in collaboration with the Deep Exploration Technologies Cooperative Research Centre (DET CRC), Minotaur Exploration Limited and Kingston Resources Limited, carried out a...-
Document
Published: 01 Dec 2016
-
RB 2016/00025 Geology of the Peltabinna 1:75 000 Special Edition Map Sheet.
The Peltabinna 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Sep 2017
-
RB 2000/00050 Gawler Craton PIRSA / AGSO / WMC field trip, 28 August - 12 September 2000. Trip itinerary and planned stops field guide.
The subject field excursion performed in August-September 2000 in part mimicked that held by the GSSA during September 1997, but included 6 additional stops programmed for Day 1 (31st August 2000) to examine Archaean geology at the southern tip of...-
Document
Published: 01 Aug 2000