Skip to content
Search Home
SARIG catalogue
  • HomeHome
  • Search Records
  • FAQs
  • Vocabularies
  • SARIG map SARIG map
  1. Datasets

Datasets

The mesac Open Data Portal datasets contain detailed records of seismic surveys and geochemical data, and they are made available here to industry, researchers and the public.
FILTER RESULTS
RESET
draw to search by area BY DRAWN AREA
RESET
Location SA

TYPE OF RECORD

  • document - (91)

TOPIC

  • Geoscientific Information - (91)

CATEGORY TYPE

  • Earth Sciences - (91)
    • Geology - (91)
      • Mineral System Geology - (87)
      • Resource Geology - (85)
        • Mineral Resource Geology - (84)
        • Quarry And Extractive Resource Geology - (16)
      • Regional Geology - (82)
      • Stratigraphy - (81)
      • Petrology - (63)
        • Igneous And Metamorphic Petrology - (31)
      • Sedimentology - (58)
      • Historical Geology - (57)
      • Basement Geology - (56)
      • Surface Geology - (40)
      • Mineralogy And Crystallography - (37)
      • Volcanology - (21)
      • Basin Analysis - (6)
      • Geochronology - (6)
      • Marine Geoscience - (2)
    • Geochemistry - (90)
      • Exploration Geochemistry - (88)
      • Isotope Geochemistry - (3)
      • Biogeochemistry - (2)
    • Geophysics - (72)
      • Electrical And Electromagnetic Methods In Geophysics - (61)
      • Magnetics - (61)
      • Gravity - (27)
      • Radiometrics - (24)
      • Petrophysics - (10)
    • Physical Geography - (57)
      • Geomorphology And Regolith And Landscape Evolution - (16)
      • Surface Processes - (14)
      • Hydrogeology - (9)
      • Surfacewater Hydrology - (7)
      • Quaternary Environments - (4)
  • Policy And Administration - (86)
  • Engineering - (79)
    • Geomatic Engineering - (74)
      • Geospatial Information Systems - (6)
      • Photogrammetry And Remote Sensing - (6)
      • Remote Sensing - (5)
      • Cartography - (2)
    • Resources Engineering - (51)
      • Drilling Engineering - (50)
      • Mineral Processing/Beneficiation - (10)
      • Mining Engineering - (7)
      • Geomechanics And Resources Geotechnical Engineering - (2)
      • Petroleum And Reservoir Engineering - (1)
    • Civil Engineering - (5)
  • Mineral Resources (Excl. Energy Resources) - (76)
    • Mineral Exploration - (89)
    • Primary Mining And Extraction Of Mineral Resources - (25)
    • First Stage Treatment Of Ores And Minerals - (6)
  • Environmental Sciences - (63)
    • Environmental Science And Management - (48)
      • Environmental Management - (22)
      • Environmental Monitoring - (4)
      • Natural Resource Management - (3)
    • Soil Science - (44)
      • Soil Chemistry - (37)
  • Information And Computing Sciences - (40)
    • Artificial Intelligence And Image Processing - (18)
      • Image Processing - (20)
      • Expert Systems - (4)
      • Simulation And Modelling - (1)
    • Computation Theory And Mathematics - (2)
  • Energy - (29)
    • Energy Exploration - (25)
    • Environmentally Sustainable Mineral Resource Activities - (4)
    • Environmentally Sustainable Energy Activities - (1)
    • Renewable Energy - (1)
  • Built Environment And Design - (5)
    • Urban And Regional Planning - (5)
  • Biological Sciences - (3)
    • Ecology - (3)
  • Cultural Understanding - (2)
  • History And Archaeology - (2)
    • Conserving Aboriginal And Torres Strait Islander Heritage - (2)

DOCUMENT TYPE

  • Mineral Company Report - (84)
    • Mineral Exploration - (84)
  • Departmental Publication - (6)
    • Geological Survey Geoscience Publication - (6)
  • Exploration Initiative - (1)
    • Collaborative Exploration - (1)

COMMODITY

  • Critical minerals - (91)
  • precious metal - (46)
  • graphite - (44)
  • uranium - (34)
  • industrial material - (30)
  • iron ore - (29)
  • gold - (18)
  • copper - (17)
  • iron - (16)
  • magnetite - (13)
  • manganese - (12)
  • silver - (12)
  • granite - (11)
  • zinc - (9)
  • lead - (8)
  • dimension stone - (6)
  • rare earth element - (6)
  • base metal - (4)
  • nickel - (4)
  • gemstone - (3)

GEOLOGICAL PROVINCE

  • Cleve Subdomain - (91)
  • Gawler Craton - (91)
  • Gawler Range Volcanic Province - (16)
  • Spencer Domain - (11)
  • Coulta Subdomain - (5)
  • Moonta Subdomain - (2)
  • Polda Basin - (2)
  • Eucla Basin - (1)
  • Itiledoo Basin - (1)
  • Nuyts Subdomain - (1)
  • Pirie Basin - (1)
  • Torrens Hinge Zone - (1)

STRATIGRAPHY

  • Hutchison Group - (75)
  • Middleback Subgroup - (29)
  • Hiltaba Suite - (23)
  • Lincoln Complex - (22)
  • Gawler Range Volcanics - (19)
  • Sleaford Complex - (18)
  • Katunga Dolomite - (11)
  • Blue Range Beds - (9)
  • Lower Middleback Jaspilite - (9)
  • Cook Gap Schist - (7)
  • Minbrie Gneiss - (7)
  • Warrow Quartzite - (7)
  • Miltalie Gneiss - (6)
  • Corunna Conglomerate - (4)
  • Yardea Dacite - (4)
  • Bridgewater Formation - (3)
  • Carnot Gneisses - (3)
  • Carpa Granite - (3)
  • Charleston Granite - (3)
  • Donington Suite - (3)

FORMAT

  • PDF - (81)

UPDATE FREQUENCY

There are no UPDATE FREQUENCY that match this search

PUBLICATION DATE

Specific date: 1980, 20/04/1980, 04/1980

Date range: 1980-2022, 04/1980-08/1990

close
Search records
ADVANCED KEYWORD SEARCH
Include the following keywords:

91 records found

Category type: Earth Sciences Commodity: Critical minerals Geological province: Cleve Subdomain

Filter Results
  • Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.

    Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...
      Document
    • PDF
  • RB 45/00118 Final report on iron ore prospecting, Corunna area, Iron Knob district.

    In an area of limited basement outcrop located between 2 and 5 miles north-northwest of Iron Knob township, the Department's surface traverse channel sampling (969'), percussion boring (643’) and diamond drilling (1270’) tested a low grade...
      Document Published: 04 Dec 1957
    • PDF
  • Botenella Range (now part of the Wilcherry Hill JV Project). Progress, annual and final reports to the commencement of the project licences' combined reporting status, for the period 14/2/1991 to 18/9/2002.

    Exploration of an area lying west of Lake Gilles concentrated initially on assessing its potential for hosting syngenetic Palaeoproterozoic stratiform base metal deposits along perceived stratigraphic extensions of the beds containing the recently...
      Document Published: 16 Oct 1903
    • PDF
  • Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.

    An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...
      Document Published: 11 Jan 1921
    • PDF
  • Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.

    During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...
      Document
    • PDF
  • Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.

    Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...
      Document Published: 01 Apr 1970
    • PDF
  • Carappee Hill. First, second and third partial surrender report, for the period 1/2/2016 to 31/01/2021.

    Two separate blocks together comprising 164 square km or ~10% of the former area of EL 5877 have been relinquished. No work was done on them. The ground had been taken up primarily to explore for possible economic graphite mineralisation which could...
      Document
    • PDF
  • Data release - as updated [made at SA Director of Mines' discretion] : Eurilla, Lake Gilles, Moseley Nobs and Uno (the Northern Eyre Peninsula Project). Joint annual reports for the period 1/6/2010 to 31/5/2018.

    Four tenements, which all lie within a 60 km radius to the north of the township of Kimba, and are mostly located around Lake Gilles, are continuing to be explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...
      Document Published: 30 Jul 1918
    • PDF
  • Moreenia. Annual reports and final report to licence full surrender, for the period 6/3/1995 to 7/4/1997.

    Geochemical sampling of ferruginous lag, stream sediments and soils targeted possible Thompson Belt type ultramafic-hosted nickel-copper and precious metal mineralisation that may have been intruded within a sequence of Lower Proterozoic Hutchison...
      Document
    • PDF
  • Mikkira (south-west of Port Lincoln). Progress reports to licence expiry/full surrender for the period 2/3/1981 to 27/10/1987.

    Exploration for graphite primarily, and secondarily for BIF-associated massive base metal sulphides, in the area surrounding the historic Uley graphite mine situated 15 km west south-west of Port Lincoln, initially comprised an airborne reconnaissance...
      Document Published: 30 Oct 1987
    • PDF
  • Mount Olinthus. Annual report to licence expiry/renewal, for the period 6/3/1995 to 5/3/1996.

    Base metal mineralisation, indicated by newly discovered shafts at the historic Atkinson Pb-Ag-Cu-Zn mine, was the impetus for exploration in the upland area 20 km north-west from Cowell. Grab samples collected from shafts, stockpiles and dumps varied...
      Document
    • PDF
  • Elbow Hill. Information status at licence surrender, for the period 12/4/2013 to 29/5/2014: no work performed.

    There is no abstract created for this record
      Document
  • Yardea. Information status at licence expiry/full surrender, for the period 6/12/2013 to 5/12/2015: no work performed.

    There is no abstract created for this record
      Document
  • Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.

    During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...
      Document
    • PDF
  • Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.

    The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...
      Document Published: 25 Feb 1919
    • PDF
  • Data release - as updated [made at SA Director of Mines’ discretion] : Karkarook. Combined annual and annual reports to licence expiry/renewal/full surrender, for the period 24/6/2004 to 1/9/2014.

    A area centred ~ 25 km west of Cleve is being explored for possible buried economic sediment-hosted or basement unconformity - related uranium mineralisation. The tenement covers part of the Driver River and Driver River Pan which contains a...
      Document Published: 26 Sep 1914
    • PDF
  • Gilles Downs. Annual reports to licence full surrender, for the period 15/2/2012 to 3/5/2016.

    An area centred ~90 km south-west of Port Augusta has been explored for possible buried economic epithermal silver mineralisation and porphyry style Cu-Au mineralisation similar to that found recently by Investigator Resources at the Paris deposit...
      Document Published: 01 Oct 1916
    • PDF
  • Lake Gilles (latterly part of the Northern Eyre Peninsula Project). Annual reports until the commencement of project licences' joint reporting, plus the final report, for the respective periods 13/2/2007 to 31/5/2010 and 1/6/2014 to 31/5/2015.

    A licence area originally comprising three separate sub-blocks located along the northern and southern sides of the Lake Gilles Conservation Park has been explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...
      Document Published: 19 Jun 1915
    • PDF
  • Data release [made at SA Director of Mines’ discretion] : Uley graphite deposit. Proposed open cut mine and ore processing plant. Mining study reports submitted during 1988.

    Formal mining proposal documents submitted to PIRSA for approval as part of the process of re-opening the Uley graphite mine to sustain a planned 10 years duration open pit mining operation.
      Document Published: 01 Jan 1988
    • PDF
  • Cockabidnie North (part of the Cockabidnie JV Project). Annual reports and final report to licence expiry/full surrender, for the period 23/8/2010 to 22/8/2015.

    The subject very small licence area, located approximately 25 km north-west of Cleve, and which lies within the northern part of the NNE trending Kimban Campoona Syncline region located on central Eyre Peninsula, has been explored, in concert with...
      Document Published: 06 Oct 1915
    • PDF
  • 1
  • 2
  • 3
  • ...
  • 5
  • Next
Download in queue. Do not close this page.

Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.

Don’t want to wait? Request for a download link to be sent to you

Download started...

Your download will start automatically in a few seconds.

Request delivery

It usually takes us a few business days to deliver your selected downloads to you via an S3 bucket. Please leave your email address and we’ll be in touch when it’s ready.

Request submitted.

We’ll be in touch in the next few business days. Sometimes we can get a large number of requests, but we strive to get back to you quickly. If, after a few days you haven’t received an email, please email us on mesacOpenData@dnrme.qld.gov.au

Made with CKAN 2.9.7(1.79)
Acknowledgement
Copyright
Disclaimer
Privacy
Contact Us
South Australia Government