-
Scobie Hill. Progress reports to licence expiry/renewal, for the period 23/3/1973 to 22/3/1974.
New work undertaken on an area located near Manunda Homestead during the current licence period has been restricted by the need to try to attract a joint venture partner, efforts towards which have proved unsuccessful. A geological inspection of the...-
Document
-
Hawks Nest. Progress reports and final report to licence full surrender, for the period 20/2/1980 to 29/12/1982.
An area 100 km north of Kingoonya which exhibits a strong regional gravity high and other, intersecting pronounced crustal geophysical features was acquired to search for an Olympic Dam type of base/precious metals deposit. Semi-detailed and detailed...-
Document
-
Jenner Hill, Pearson Hill and Sandy Point (the Stuart Shelf JV Project). Joint progress reports, plus later annual reports and final report to full surrender of remnant licence EL 1808, for the overall period 4/10/1989 to 24/10/1996.
Exploration for Olympic Dam-style mineralisation, undertaken over an area centred ~15 km south-east of Arcoona Homestead on the Stuart Shelf, which includes WMC's formerly partly tested Emmie Bluff prospect, has comprised the acquisition of ground...-
Document
-
RB 35/00042 Nairne pyrite milled on a pilot scale. Iron sulphides concentrated in a flotation pilot plant operated by the South Australian Department of Mines.
There is no abstract created for this record-
Document
Published: 01 Jan 1953
-
RB 37/00039 Report on the Copper King ochre deposits (near Beltana).
The Copper King orebody, located approximately 10 miles north-northeast of Beltana township, is a massive deposit of iron carbonate, the upper portion of which has been altered by oxidation and hydration to oxides of iron. The deposit was worked...-
Document
Published: 09 Mar 1954
-
RB 37/00077 Petrology of the cores of bores no. 1 and 2, Middleback Ranges.
A representative selection of rock types obtained in the cores of the DDH1 and DDH2 iron ore exploration holes was made with a view to studying the mineralogy, the lithology and any microstructures of interest present in the formations intersected. A...-
Document
Published: 05 Apr 1954
-
RB 37/00109 Progress report. Middleback Range diamond drilling.
There is no abstract created for this record-
Document
Published: 11 May 1954
-
RB 37/00146 Petrological laboratory report no. 41/54.
There is no abstract created for this record-
Document
Published: 01 Jan 1954
-
RB 38/00060 Broken Hill Pty Co. Ltd geophysical survey of Middleback Range, South Australia. Progress report no. 3.
In January, 1953, arrangements were made for the Geophysical Survey of Middleback Ranges to be extended to the Iron Knob area before completion of the Camel Hills programme. A section extending northerly from, the Monarch-Knob centre was chosen for...-
Document
Published: 01 Jan 1953
-
RB 38/00059 Drilling Iron Monarch (G 37/19 ). Progress report Iron Monarch Corunna geology and geophysics.
There is no abstract created for this record-
Document
Published: 01 Jan 1954
-
RB 38/00061 Broken Hill Pty Co. Ltd geophysical survey of Middleback Range, South Australia. Progress report no. 4.
A gravity survey was carried out at Iron Knob, during the period 28th July, to 14th August, in accordance with the recommendations and decisions made after the completion of the geomagnetic survey over the same area (vide progress report No. 3). A...-
Document
Published: 01 Jan 1953
-
RB 38/00090 Wagon drilling programme, Katunga Hills, Middleback Range - Final report.
There is no abstract created for this record-
Document
Published: 01 Jan 1954
-
RB 39/00053 Rutile deposit, section 52 Hundred of Encounter Bay.
Samples of rutlie containing 40.5% titanium were submitted from the above locality by Mr. L. Hutchinson of Myponga. Further to this, Mr. Hutchinson requested some assistance from the Department of Mines to investigate the possibility of upgrading this...-
Document
Published: 01 Jan 1957
-
RB 39/00077 Inspection of magnetite deposit, Ardrossan, Yorke Peninsula.
An inspection of the deposit was requested after a sample submitted by Mr Wood for identification proved to be magnetite inter grown with hematite (Petrological Report P 41/55 attached). The writer was accompanied by Mr Wood and Mr A.R. Crawford...-
Document
Published: 01 Jan 1955
-
RB 39/00087 Prospecting north of Iron Knob racecourse area. Proposals and progress report no. 4 results to 2/6/1955.
There is no abstract created for this record-
Document
Published: 01 Jan 1955
-
RB 41/00018 Geological inspection of iron ore prospects, Pandurra Station, Iron Knob district, Co. Manchester - A.W. and R. Kittel.
Messrs. A. W. and R. Kittel of 7 Fern Street, Port Augusta reported occurrences of iron ore and ochre on Pandurra Station and suggested they be paid a reward. After an interview at Port Augusta it was arranged that R. Kittel should act as guide in...-
Document
Published: 01 Jan 1955
-
RB 41/00028 Proposals and report no. 1 re prospecting south of Iron Knob, Katunga Hills.
Following regional mapping in the Middleback Ranges and photoscale mapping of the Katunga Hills, a wagon drilling and diamond drilling programme was carried out in the Katunga Hills in 1954 to delineate an “area of interest” which could warrant more...-
Document
Published: 01 Jan 1955
-
RB 41/00048 Diamond drilling of a magnetic anomaly at Balgowan, Yorke Peninsula. Final report.
An aerial magnetometer survey carried out by the BMR in 1952, followed up by SADM during 1953 with detailed ground magnetometer surveys, revealed two prominent magnetic high anomalies located south of Balgowan on Yorke Peninsula (maximum recorded...-
Document
Published: 29 Aug 1955
-
RB 41/00043 Survey of ironstone deposit near Yalpara Station, secns 45, 46 Hd Minburra.
In March 1955, Mr. C.T. Beaty of 60 Beatrice Street, Prospect, submitted a sample of high-grade specular iron ore from Section 46, Hundred of Minburra. The sample was taken from an occurrence extending over twenty acres. It was decided to survey the...-
Document
Published: 01 Jan 1955
-
RB 41/00050 Prospecting south of Iron Knob, Katunga Hills (north) area, report no. 2.
Following approval of the proposals for initial stages of sampling outlined in report no. 1 a visit was made to the Katunga Hills area by the writer and Mr. R.C. Mirama (Geologist) during the week ending 19 August 1955 when the following work was...-
Document
Published: 01 Jan 1955