-
Annual report on exploration activities, Mount Neill and Mount Fitton areas, EL 871, 1982.
A reassessment of Marathon Petroleum's 1979 regional stream sediment sampling programme led to the decision to resample a number of areas within EL 871. The Mt Neill and Mt Fitton areas were chosen, as a result of possible similarities with the...-
Document
-
Summary of the previous exploration for stratiform copper and proposed follow-up exploration in the Yudnamutana Hill area, South Australia.
This report summarises the relevant results of previous copper exploration in the Yudnamutana Hill area by Utah Exploration Co. and Australian Aquitaine Petroleum Pty Ltd, and suggests an ongoing exploration programme for stratiform copper. It also...-
Document
-
Appraisal of the northern Flinders Gunsight Project, South Australia.
This report reviews exploration work done from 1965 through 1993 by North Flinders Mines and four joint venturers on the Northern Flinders Ranges Gunsight Project. The enormous number of reports and interpretive maps generated are listed as...-
Document
-
Review of stratiform gold within the Adelaidean sediments, Mount Painter Province, South Australia.
The southern portion of the Mount Painter Province held under ELs 871 and 1049 contains Adelaidean sediments of the Upper Callanna Beds and Burra Group overlying the Carpentarian Mount Painter Complex. Reconnaissance work by Marathon Petroleum during...-
Document
-
Review of Mineral exploration activity, 2003 and 2004.
2003 activity: Expenditure by companies on mineral exploration licences in South Australia for calendar year 2003 was $37.0 million, a slight increase on the $35.7 million spent in 2002. Mineral exploration drilling metreage, a key indicator of...-
Document
-
Mount Brady (part of the Mount Woods Project). First partial surrender report for the period 10/7/2007 to 9/7/2009.
The Mount Brady exploration licence, located some 40 km south of Coober Pedy, abuts the northern boundary of IMX Resource's Kangaroo Dam EL 3445, and overlies the north-western part of the Palaeoproterozoic Mount Woods Inlier. The area forms part of a...-
Document
-
Codna Hill, Pumper Dam, Welcome Bore and Beresford Hill (part of Curdimurka Project). Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 20/8/2007 to 26/8/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
Published: 28 Jan 1909
-
Mount Paisley, Mount Woods, Warrina North and Warrina South (all part of the Mount Woods Project). Respective third and second partial surrender reports for the overall period 9/8/2005 to 4/4/2008.
Exploration for possible buried IOCG type base and precious metal deposits within complex Proterozoic to Archaean basement rocks in the Mount Woods Domain has, for the relinquished peripheral areas of the four subject licences, consisted only of...-
Document
Published: 27 May 1908
-
Manguri (part of the Mount Woods Joint Venture Project). Second partial surrender report for the period 13/12/1999 to 13/3/2006.
Within the relinquished licence area, no geophysical anomalies were recognised within deeply buried Proterozoic basement that might represent possible craton margin magmatic nickel or IOCG type exploration targets. A review of previous exploration...-
Document
Published: 04 Oct 1906
-
Trumpeter (part of the Mount Woods Joint Venture Project). Annual and final reports to licence surrender for the period 19/12/2000 to 29/11/2007.
Ground covering a major east-west trending shear zone in the north-eastern portion of the Mount Woods Inlier was taken up by Goldstream Mining to allow an evaluation of its IOCG - style mineralisation potential, possibly for Fe-Cu-Au occurrences of a...-
Document
-
Manguri (part of the Mount Woods Joint Venture Project). Annual reports and final report to licence surrender, for the period 13/12/1999 to 4/10/2006.
Possible craton margin magmatic nickel deposits or iron oxide - associated copper-gold (IOCG) type large base and precious metal deposits within buried Proterozoic basement were targeted in an area lying just to the north-west of Coober Pedy. Delays...-
Document
Published: 20 Nov 1906
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-28, Mount Woods IOCG Project mineral prospect. Project final report.
PACE Initiative Year 3 drilling project funds were secured by Goldstream Mining to explore for base metals and gold within two licence areas taken out over concealed Proterozoic basement of the Mt Woods Inlier, and which also cover parts of the Coober...-
Document
Published: 12 Dec 1906
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2000 to 6/11/2010. [ Index Part 1 of 2 ].
The large Kangaroo Dam exploration licence covers the mostly concealed western portion of the Palaeoproterozoic Mount Woods Inlier, a large block of variable magnetic intensity lying to the east and south-east of the Coober Pedy Ridge and the Mabel...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2005 to 6/11/2010. [ Index Part 2 of 2 ].
During the first year of renewed tenure under EL 3445, the work done consisted of performing diamond and RC drilling programmes which were partly funded by PIRSA's PACE Initiative as Theme 2, Year 2 and 3 approved Drilling Collaboration Projects. The...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports to licence expiry/renewal, for the period 12/3/1999 to 11/3/2004.
An area comprising two separate sub-blocks centred ~115 km south-southeast of Coober Pedy and located to the west of the Stuart Highway is being explored for Archaean to Palaeoproterozoic banded iron formation iron ore mineralisation of economic...-
Document
Published: 05 Feb 1904
-
Data release [made at SA Director of Mines' discretion] : The Twins (part of the South Mount Woods Joint Venture). Annual reports to licence expiry/renewal, for the period 7/3/2002 to 6/3/2007.
An area covering ground adjacent to the southern boundary of current EL 3056 (formerly EL 2483), on which licence the newly discovered (in November 2001) Prominent Hill IOCG deposit is situated, is being explored for similar style buried...-
Document
Published: 03 Apr 1907
-
Balta Baltana Creek. Annual reports to licence expiry/full surrender, for the period 11/8/2016 to 10/8/2021.
A small area centred ~95 km east-southeast of Coober Pedy has been explored for possible buried Olympic Dam style IOCG mineralisation, epigenetic and stratiform base metal deposits and structurally controlled Tennant Creek style orogenic lode gold...-
Document
Published: 22 Oct 1921
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-13, Gemini mineral prospect. Project final report.
The Mount Woods South Joint Venture (Adelaide Resources Ltd and Perilya Ltd) successfully made application for a share of the SA Government's PACE Initiative funding in 2004 to test geophysical anomalies located on EL 2901 which were defined by...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [Index Part 1 of 2 ].
An area centred approximately 50 km south-east of Coober Pedy has been taken up after it was surrendered early in 2000 by the BHP Minerals / Western Mining Corp. joint venture consortium (cf. Env 8434). The main mineral commodities now being sought by...-
Document