-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-33 - north-eastern Gawler Craton - Douglas Creek gravity anomaly Mesoproterozoic basement IOCG mineral prospect. Project interim and final reports.
The north-eastern margin of the Gawler Craton is prospective for Mesoproterozoic iron oxide - associated copper-gold (IOCG) style mineralisation, but the considerable depth to crystalline basement, combined with the presence of an artesian Mesozoic...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Peake Hill. Annual reports to licence expiry/full surrender, for the period 9/7/2013 to 8/7/2017.
A small area located on and adjacent to the eastern margin of the Denison Range, ~ 60 km south-east of Oodnadatta, has been explored for possible buried economic sediment-hosted uranium mineralisation. During licence Year 1 the licensee reviewed all...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-05 - Mount Sarah Project, Oodnadatta district, Proterozoic basement inferred epithermal/hydrothermal IOCG mineral prospect. Drilling final report.
A small licence area centred approximately 70 km north-northwest of Oodnadatta is being explored for possible economic buried IOCG type mineralisation that may have formed in the wholly concealed, almost unknown basement rocks there. Interest is...-
Document
Published: 28 Sep 1917
-
Ruby Hill Project : Douglas Creek prospect drilling program. Final report, Project ADI RD02-288 [part of Accelerated Discovery Initiative Round 2, 2022].
Copper Search Australia Pty Ltd (a subsidiary of Copper Search Limited) was granted co-funding from the Department of Energy and Mining in July 2021 to a subsidy total of up to $228,000, to assist it with high risk exploration of remote parts of the...-
Document
-
Mount Kingston. Progress reports and final report to licence expiry/full surrender, for the period 10/10/1979 to 26/4/1984.
Diamond exploration undertaken over an area situated 70 km south-east of Oodnadatta included photogeological studies, the acquisition of a 2400 line km low level aerial magnetic and radiometric survey, and geochemical analyses of 452 reconnaissance...-
Document
-
Peake and Denison Ranges. Progress reports and technical reports to licence expiry/full surrender, for the period 17/2/1969 to 4/5/1971.
An airborne magnetic/radiometric survey was flown over the licence in 1969. Three anomalies located near Peake Homestead Ruins and the Coppertop mine gave disappointing ground survey uranium responses from traverses made with a hand-held...-
Document
-
Data release : Mount Sarah, Alamilda Hill and Todmorden (the Mount Sarah Project). Annual reports and joint annual reports to the successive expiry/full surrender of ELs 6129 and 5634, for the overall period 23/6/2015 to 22/6/2020.
Three adjacent areas located in dissected hilly country 70-90 km to the north-west of Oodnadatta were successsively taken up under licence to cover a significant, 8 mGal regional gravity anomaly which could have potential for IOCG type basement-hosted...-
Document
Published: 24 Jun 1920
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Cooinchina Creek (synonym: the West Lake Eyre Project). Annual reports and final report to licence expiry/full surrender, for the period 21/9/2007 to 20/9/2010.
An area located approximately 50 km east of William Creek and abutting the western shoreline of Lake Eyre North was taken up to explore for possible concealed IOCG style base metal and uranium deposits, that could have formed in buried Archaean to...-
Document
Published: 30 Jun 1910
-
Blyth Creek. Annual reports and final report to licence surrender, for the period 2/1/2007 to 30/9/2013.
Exploration for possible economic IOCG type base and precious metal deposits in buried basement rocks, and for possible roll front style sedimentary uranium mineralisation in overlying Jurassic-Cretaceous Eromanga Basin sediments, within an area...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-26 - Energia Minerals Limited Gawler Craton Project, IOCG-prospective Blyth Creek BC4 gravity anomaly. Drilling project final report.
During July 2012, at a location approximately 90 km south-east of Oodnadatta, EL 3680 licensee Energia Minerals completed the drilling at the BC4 gravity anomaly target of a single vertical rotary mud/diamond tailed hole to a total depth of 144.3 m...-
Document
-
Anna Creek. Annual reports plus final report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2014.
A small area centred ~20 km north-west of William Creek has been explored for possible economic buried IOCG mineralisation, which could have formed in Mesoproterozoic basement rocks that in the surrounding region exhibit several large coincident...-
Document
Published: 26 Sep 1914
-
Mount Treloar (NW of Oodnadatta). Progress and final reports for the period 30/6/80 to 29/12/80.
Follow-up investigations of possible buried channel redox front uranium mineralization on the edge of the Eromanga Basin, in the vicinity of the SA-NT border, included a geophysical and structural interpretation of available data, the drilling and...-
Document
Published: 23 Feb 1981
-
Douglas Creek. Combined first progress/final report to licence full surrender, for the period 28/4/1983 to 30/8/1983.
Over an area abutting the south-western shoreline of Lake Eyre North, detailed ground magnetic and gravity surveys were carried out over coincident regional gravity and magnetic highs in the search for Olympic Dam - type mineralisation. One rotary...-
Document
Published: 17 Oct 1983
-
Bore sample analyses, Officer and Pedirka Basins and some bores in Great Artesian Basin.
There is no abstract created for this record-
Document
Published: 01 Jan 1972
-
Mount Denison. Progress reports and final report to licence expiry/full surrender, for the period 19/11/1973 to 18/11/1974.
As part of a continuing search for possible Palaeoproterozoic unconformity and vein-related hydrothermal uranium deposits in the northern Peake and Denison Ranges basement outcrop region, prospective stratigraphic and structural features were mapped...-
Document
Published: 16 Jan 1975