Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.
Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...-
Document
-
Jenner Hill, Pearson Hill and Sandy Point (the Stuart Shelf JV Project). Joint progress reports, plus later annual reports and final report to full surrender of remnant licence EL 1808, for the overall period 4/10/1989 to 24/10/1996.
Exploration for Olympic Dam-style mineralisation, undertaken over an area centred ~15 km south-east of Arcoona Homestead on the Stuart Shelf, which includes WMC's formerly partly tested Emmie Bluff prospect, has comprised the acquisition of ground...-
Document
-
Woomera, Portulacca Ridge and Red Lake. Joint final report at licences' joint full surrender, for the period 15/2/1983 to 7/11/1986.
The three licences now being surrendered were originally taken out by Seltrust in the mid-1970s to search for stratabound base metals and Olympic Dam type mineralisation. After Seltrust withdrew from the subsequently formed Stuart Shelf joint venture...-
Document
-
RB 94/00044 Soil air carbon dioxide and oxygen as a guide to oxidising sulphide concealed beneath shallow cover. Soil air CO2/O2 project: review report 1.
A joint project between Dr I.G. Watmuff (consultant) and the Department of Mines and Energy, South Australia, to appraise the soil air CO2/O2 technique as a guide to concealed oxidising sulphides, has been completed. Testing was conducted over known...-
Document
Published: 01 Oct 1994
-
RB 97/00051 Poona copper mine, Moonta, South Australia - Investigation of alteration mineralogy using short-wave infrared analysis.
The Poona Copper Mine on northern Yorke Peninsula, South Australia, was worked from 1988-92 on an extension of the original Poona lode, a narrow, shear-hosted copper sulphide vein deposit in Moonta Porphyry of Mesoproterozoic age. The orebody is...-
Document
Published: 01 Nov 1997
-
RB 92/00061 Soil Air CO2/O2 Project. Progress report 3, Mount Gunson area.
The rationale of utilising soil air carbon dioxide and oxygen measurements as a guide to oxidising sulphide is that sulphide oxidation in the presence of water and oxygen will produce sulphuric acid, which in turn will attack any carbonates present to...-
Document
Published: 01 Oct 1992
-
Lake Torrens South and Harris Crossing area, north of Port Augusta (the Torrens South Project). Combined annual reports plus separate final reports to licences' joint expiry/full surrender, for the period 31/1/2006 to 30/1/2010.
Exploration for possible buried Carrapateena or Prominent Hill type iron oxide-associated copper-gold deposits along the south-eastern side of the Stuart Shelf, in the vicinity of the southern end of Lake Torrens, initially consisted of a review of...-
Document
Published: 07 Apr 1910
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Bopeechee. Final report at licence expiry/full surrender, for the period 16/11/2000 to 27/7/2008.
In on-ground exploration of an area on the Stuart Shelf located 18-46 km north-east of Olympic Dam, possible economic sedex - style, Mount Isa / Nifty type stratabound copper was targeted within Neoproterozoic carbonate rocks as part of multiple...-
Document
-
Roxby Hill. Annual and final reports to licence surrender for the period 6/2/2006 to 13/11/2008.
In a search for possible economic iron oxide - associated copper-gold mineralisation buried under deep cover to the south-west of the Olympic Dam deposit, a semi-detailed gravity survey consisting of 302 stations was read at 800 m intervals on 1.6 km...-
Document
Published: 09 Mar 1909
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-03, Marathon South mineral prospect. Project interim and final reports.
During exploration of Exploration Licence 3209 situated on the northern Stuart Shelf, gravity and magnetic modelling performed in early 2004 highlighted several anomaly source bodies, which immediately became of much interest as potential iron-oxide...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-14, Pernatty Lagoon area (eastern Gawler Craton) IOCG mineral prospects. Project final report.
PACE proposal DPY3-14 aimed to discover a new iron oxide - associated copper-gold (IOCG) mineralised magmatic centre, similar to the Olympic Dam setting, within the eastern margin of the Gawler Craton. The Pernatty Lagoon project is located less than...-
Document
Published: 20 Sep 1906
-
West Woomera. Annual reports and progress reports to licence expiry/full surrender, for the period 31/5/2000 to 30/5/2005.
Copper-gold exploration undertaken over a small area within the Woomera Prohibited Area, 20 km west of Woomera township, was restricted to carrying out geophysical data interpretation and conceptual modelling for generating drill targets based around...-
Document
Published: 29 Nov 1904
-
AMIRA Project P544: Proterozoic sediment-hosted copper deposits. Quarterly progress reports and final report for the period July 2000 to October 2003.
The original objectives of this project were: 1) To understand the processes responsible for transporting, concentrating and fixing copper and other ore constituents during sedimentary basin evolution 2) To document the various stages and paragenesis...-
Document