-
Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
Mount Allalone. Progress and annual reports for the period 14/6/89 to 31/7/95.
Base metal exploration of two lead-zinc mineralized areas previously discovered by Billiton and WMC within Hutchison Group metasediments near Mt Allalone, northwest of Buckleboo on central Eyre Peninsula, comprised ground magnetic and EM surveys, RAB...-
Document
Published: 02 Nov 1995
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Whyalla. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2003 to 11/6/2008.
Evaluation of the perceived Olympic Dam style copper-gold and Stuart Shelf type stratabound copper potential of, respectively, the Proterozoic basement and the Adelaidean cover rocks in an area lying immediately to the west of the Cultana Inlier was...-
Document
Published: 01 Oct 1908
-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
Mount Ive. Annual and final reports to licence expiry/full surrender for the period 17/7/2006 to 16/7/2008.
Exploration for possible IOCG drilling targets within an area located 100 km north-northeast of Kyancutta, that abuts the southern shoreline of Lake Gairdner, initially involved planning for a regional gravity survey to be acquired across three of...-
Document
-
Stuart Creek. Annual reports for the period 9/4/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
In exploration carried out over an area located 60 km north of the Olympic Dam mine, Adelaidean Wilpena Group metasediments extending northwestwards along strike from gold-anomalous strata previously identified on Tasman Resources' Mulgaria EL 2340...-
Document
Published: 07 May 1900
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-21 - Uranium Equities Limited, Marla Project, Proterozoic basement magnetic and gravity anomaly IOCGU targets. Drilling project final report.
Uranium Equities, the licensee parent and operator of the seven Marla Project tenements, is exploring them with the aim of discovering economic iron oxide - associated copper–gold±uranium (IOCGU) deposits, that it considers may have given rise to a...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
Maitland. First partial surrender report, for the period 25/8/2008 to 24/8/2015.
58 square km of the Area C southernmost sub-block of EL 5320 have been relinquished to compensate for a shortfall in exploration spending against commitments. During the past seven years, the only work performed on the relinquished ground was the...-
Document
Published: 20 Mar 1916
-
Buckleboo (part of the Buckleboo Project). Combined first annual/final report at licence full surrender, for the period 7/1/2014 to 20/2/2015.
A very small area located ~25 km north-west of Kimba has been explored for possible economic buried base and precious metal mineralisation that may have formed within Archaean metasedimentary bedrock and be related to younger igneous intrusions....-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release - as updated : Brooker (part of the Brimpton Lake Project). Annual reports to licence expiry/full surrender, for the period 12/6/2003 to 24/8/2018.
Exploration Licence 3096 “Brooker” covering an area of 682 square km lies east of Elliston on the Eyre Peninsula in South Australia. It is one of three adjacent tenements that form the “Brimpton Lake Project”; the other two are EL 2662 (initially...-
Document
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 1912
-
Finniss Springs. Annual reports plus final report to licence expiry/full surrender, for the period 20/1/2012 to 19/1/2015.
A large area centred ~60 km west of Marree, near the south-eastern margin of Lake Eyre South, has been explored for possible buried economic sedimentary type base metal mineralisation which may have formed in the Adelaidean cover sequence, as well as...-
Document
Published: 10 Apr 1915