-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
Parndana. Annual reports and final report to licence expiry/full surrender, for the period 27/10/2006 to 26/10/2008.
Exploration for possible economic stratiform/syngenetic base metal deposits and/or structurally controlled epithermal/hydrothermal gold and uranium occurrences within Lower Cambrian metasediments over the central section of Kangaroo Island included...-
Document
Published: 22 Apr 1909
-
Data release - as updated : Mount Grainger (part of the Flinders Ranges Diamond Project and the Nackara Arc Gold Project). Combined annual reports and annual reports to licence expiry/full surrender, for the period 6/2/2008 to 5/2/2017.
An area centred ~40 km east of Peterborough in the vicinity of Mount Grainger Goldfield has continued to be explored for possible small diamondiferous kimberlite bodies and for buried economic stratabound, structurally controlled and disseminated...-
Document
Published: 19 Sep 1916
-
Dudley Peninsula. Annual reports to licence expiry/full surrender, for the period 8/9/2014 to 7/9/2016.
The Dudley pegmatite, located a short distance inland near the eastern tip of Kangaroo Island, ~10.5 km south-east of Penneshaw township, was worked historically during the 1890s and early 1900s for gem tourmaline, ceramic-grade feldspar and silica,...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Eurelia Diamond Project. Joint annual reports for the period 1/1/2014 to 17/11/2018.
Since taking over ownership of five licences that previously formed parts of Flinders Mines' Springfield Project, by a purchase agreement that took force in June 2014, Diamond Resources has been working to define, identify and prioritise advanced...-
Document
Published: 31 Dec 1918
-
Antechamber Bay. Progress reports and technical reports to licence expiry/full surrender, for the period 27/11/1986 to 26/11/1989.
TARGET: Evaluation of the gemstone tourmaline and kaolin clay potential of the Dudley Pegmatite on Kangaroo Island. It is believed that this known occurrence of coloured tourmaline is one of only two locations in Australia which have produced...-
Document
Published: 01 Jan 1989
-
ExpNotes PARACHILNA (v2): Explanatory Notes PARACHILNA (second edition, 1999)
The PARACHILNA map area (31 to 32°S, 138 to 139.5°E) occupies the central Flinders Ranges which are made up of folded, mostly marine sedimentary Neoproterozoic and Cambrian rocks of the Adelaide Geosyncline, and adjoining plains underlain by Cainozoic...-
Document
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document
-
Diamond provenance studies at Chapel Hill Reserve, Echunga, South Australia. [being work done within one of the "Areas to be reserved under the Mining Act and Regulations 1971"].
The principal aim of Flinders Diamonds Limited’s (FDL) exploration in the Chapel Hill area is to discover a commercial diamond deposit. The source of the "Echunga" diamonds, found in the alluvial gold workings within the Chapel Hill Fossicking Reserve...-
Document
-
RB 2014/00005 WINTINNA, South Australia, [geological map] sheet SG53-14. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The WINTINNA 1:250 000 mapsheet area lies between latitudes 27° to 28° South and longitudes 133°30’ to 135°00’ East. This ~16 400 square km area includes the Marla and Cadney Park settlements, and is crossed by the Stuart Highway and Adelaide to...-
Document
Published: 01 Mar 2015
-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
Anabama Hill. Progress reports to licence expiry/full surrender for the period 1/12/1968 to 30/11/1970.
After its initial stream sediment sampling and rock chip sampling had revealed that significant base metal anomalism (Mo to 600 ppm and Cu to 300 ppm) exists on and near granitic rock outcrops at Anabama Hill, Asarco undertook detailed 1:1200 scale...-
Document
-
RB 2007/00015 Geochronology of the Gawler Craton, South Australia.
Geochronology enables us to determine the age of rocks and minerals. The variety of isotopic geochronological techniques give complementary information on, for example, the timing of igneous or metamorphic crystallisation, as is often the case for the...-
Document
Published: 01 Sep 2007
-
Wharton Hill (near Manna Hill). Progress reports and final report to licence full surrender, for the period 12/1/1981 to 11/7/1981.
As part of a regional search for diamondiferous kimberlite, stream sediment sampling of ?54 sites in the Wharton Hill area failed to reveal any kimberlite indicator minerals. However, heavy mineral concentrates from samples taken at four sites in the...-
Document
-
Netley Hill. Progress and final reports to licence expiry/full surrender for the period 1/12/1968 to 30/11/1969.
A rotary percussion drilling programme (8 vertical holes for a total penetration of 1920 feet) was undertaken at Netley Hill to look for economic copper and molbdenum mineralisation in a greisen (hydrothermally altered granite) body which has an...-
Document
Published: 19 Nov 1970
-
Whyte Yarcowie. Progress reports for the period 12/5/1969 to 21/5/1971.
In the Terowie - Whyte Yarcowie district, and in other nearby areas to the east and south-east, ongoing reconnaissance/infill stream sediment and bulk sampling of highland areas, plus detailed grid-based loam sampling of alluvium on lower-lying arid...-
Document
-
Manna Hill [not 'Mannahill']. Combined progress reports and final report to licence surrender for the period 16/10/1977 to 31/5/1978.
The potential for finding remnant economic stratiform gold mineralisation in the Mannahill Gold Field was investigated by examining the old surface and underground mine workings, and the best-developed ore shoots were tested by drilling 25 vertical...-
Document
-
Lovely Gully prospect, Waukaringa Goldfield. Progress and final reports to licence expiry/full surrender for the period 25/8/1969 to 24/8/1970.
Exploration of the copper potential of abandoned gold workings put down on surface quartz reefs at Lovely Gully,located 35 km north-west of Yunta, was prompted by prospector Lazlo Katona's observation of rich samples of native copper, azurite,...-
Document
Published: 26 Aug 1970
-
Waukaringa. Progress reports to licence expiry/full surrender for the period 25/7/1974 to 24/7/1976.
Work carried out at the Ajax and Waukaringa mine prospects included an aerial reconnaissance, grab sampling of mine tailings heaps and limited detailed stream sediment sampling plus, at the Ajax prospect, the drilling of 5 vertical rotary percussion...-
Document