Black Hill Intrusive Complex (northern [Bower - Florieton] and southern [Cambrai] areas). Joint annual report plus final report to licences' joint expiry/full surrender, for the period 17/2/2005 to 16/2/2007.
Inco Resources has been exploring the outcropping portion of the Ordovician Black Hill Intrusive Complex for possible Voisey's Bay style nickel, copper and platinum group element (PGE) mineralisation since 2004, when it signed a joint venture...-
Document
-
Langhorne Creek (part of the Fleurieu Project). Fourth partial surrender report, for the period 12/8/1994 to 14/8/2014.
EL 4466 Langhorne Creek is part of the Fleurieu Amalgamated Expenditure Agreement which incorporates Exploration Licences 4466, 4936, 5078, 5102, 5252 and 4210 (new Exploration Licence EL 5356 granted 24/11/2013). The combined licences' areal extent...-
Document
-
Tanunda. Progress reports to licence expiry/full surrender, for the period 27/7/1989 to 26/7/1990.
Possible epithermal/hydrothermal and shear-related vein style gold, and Proterozoic and Cambrian metasedimentary-hosted industrial minerals, were the targets of reconnaissance exploration over a licence taken up in the Barossa region. 1:2000 scale...-
Document
-
Bremer (part of the Fleurieu Project). First and second partial surrender report, for the period 8/3/1991 to 13/01/2021.
Parts of the subject licence has been relinquished by current holder Terramin as part of the management conditions applying to the company's multi-licence exploration project under the Amalgamated Expenditure Agreement made with the SA Government in...-
Document
-
Strathalbyn [not Hartley] (part of the Fleurieu Project). First partial surrender report, for the period 4/6/2007 to 20/9/2013.
Two portions of the subject licence, totalling ~11% of the originally granted tenement area, have been relinquished by current holder Terramin as part of the management conditions applying to the company's multi-licence exploration project under the...-
Document
-
Currency Creek (part of the Fleurieu Project). First partial surrender report, for the period 4/6/1992 to 20/9/2013.
A number of peripheral parts of the subject licence, in all comprising 54% of the originally granted area, have recently been relinquished by current holder Terramin, as part of the management conditions applying to the company's multi-licence...-
Document
-
Langhorne Creek (part of the Fleurieu Project). Third partial surrender report, for the period 12/8/1994 to 20/9/2013.
A 25 square km portion at the southern end of the subject licence, comprising ~2.4% of the originally granted area, has been relinquished by current holder Terramin as part of the management conditions applying to the company's multi-licence...-
Document
-
Preliminary report [on the] structural geology of [the] Wheal Ellen prospect, South Australia.
Close examination of large scale apparent folds in the vicinity of Wheal Ellen has led to the conclusion that apparent folds can be produced by a combination of jointing (shearing) and topography. Thus, apart from fault trace offsets, no importance...-
Document
-
Parndana. Annual reports and final report to licence expiry/full surrender, for the period 27/10/2006 to 26/10/2008.
Exploration for possible economic stratiform/syngenetic base metal deposits and/or structurally controlled epithermal/hydrothermal gold and uranium occurrences within Lower Cambrian metasediments over the central section of Kangaroo Island included...-
Document
Published: 22 Apr 2009