The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
RB 60/00043 Examination of five possible sites for water storages near Whyalla. Geological progress report, March 1965.
At the request of Mr. C. England, Assistant Engineer for Design, E. and W.S. Department, the sites for 5 alternative water storage facilities near Whyalla were examined on 17th and 18th February, 1965. On 18th February, the inspections were in company...-
Document
Published: 05 Mar 1965
-
Bopeechee. Final report at licence expiry/full surrender, for the period 16/11/2000 to 27/7/2008.
In on-ground exploration of an area on the Stuart Shelf located 18-46 km north-east of Olympic Dam, possible economic sedex - style, Mount Isa / Nifty type stratabound copper was targeted within Neoproterozoic carbonate rocks as part of multiple...-
Document
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Data release - as updated : McDouall Peak. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
Quasar Resources has been exploring a large licence area centred approximately 40 km south-west of the Prominent Hill mine for possible economic buried iron-oxide-copper-gold (IOCG) style mineralisation, epithermal base metal mineralisation of the...-
Document
Published: 27 Oct 1922
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
McDouall Peak. Partial surrender reports, for the period 8/10/2012 to 7/10/2020.
Within a licence area which is centred ~100 km south-southeast of Coober Pedy, holder Quasar Resources’ primary exploration target is concealed basement-hosted IOCG style mineralisation similar to that existing at the Prominent Hill and Carrapateena...-
Document
Published: 02 May 1918
-
The Olympic Domain Project. Joint annual reports for the period 1/1/2011 to 31/12/2016, plus individual licence full surrender final reports.
During the sixth year of the project, three gravity anomalies located on West Lake Torrens EL 4754, a short distance east of the Carrapateena IOCG prospect, were identified by Copper Range as worthy of follow up. A detailed infill ground gravity...-
Document
Published: 01 Mar 1919
-
RB 2018/00018 The South Australian Atlas of Geoscience and Mineral Exploration data - Woomera Prohibited Area within the Gawler Craton. 2nd edition.
The Woomera Prohibited Area (WPA) is a military testing range covering 122,188 square km of the land surface of central South Australia. Underlying it are highly economic minerals - prospective rocks of the Gawler Craton, a major province of the...-
Document
Published: 01 Aug 2018
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-02, Titan mineral prospect. Project interim and final reports.
Titan prospect is located within Exploration Licence 3209, and lies 30 km north of the Olympic Dam mine. The prospect was first drilled by Western Mining Corp. in 1976 with diamond drillhole BD 1, and in 1981 with a second hole, BD 2. Both holes hit...-
Document
-
Roxby Downs North (part of the Olympic Domain Project). Final report at licence surrender for the period 18/6/2007 to 17/6/2009.
During its 2-year tenure of EL 3810, which consisted of two parcels of ground situated 25 to 70 km north-west of the Olympic Dam mine, Copper Range undertook a review of existing geological and geophysical data and identified a ring structure and...-
Document
Published: 17 May 1909
-
Yalymboo, Dingo Hill and Black Oak Hill (the Cariewerloo Project). Joint annual reports and separate final reports to licence's respective expiry/full surrender, for the period 5/6/2006 to 20/6/2009.
Possible Mesoproterozoic unconformity-related uranium deposits within the Cariewerloo Basin, involving an inferred structural preparation component whereby basic intrusive members of the Gairdner Dyke Swarm cut across this unconformity in a manner...-
Document
Published: 19 Nov 1909
-
Centre Hill (the Kingoonya JV Project). Annual reports to licence expiry/full surrender, for the period 7/3/2006 to 10/5/2012.
An area extending for approximately 80-115 km south-east of Tarcoola has been explored for possible economic mesothermal gold±copper mineralisation formed in Mesoproterozoic igneous basement, possible unconformity - related uranium mineralisation at...-
Document
Published: 12 Jul 1912
-
South Tent Hill and North Tent Hill. Joint annual reports submitted until licences' expiry/renewal, for the period 20/10/2005 to 19/10/2010.
Two adjoining licence areas located immediately west and north-west of Port Augusta, which cover the southern end of the Cariewerloo Basin and extend north-westwards for 60 km, are being explored for possible economic unconformity-style uranium...-
Document
Published: 14 Dec 1910
-
Oak Dam (part of the Gawler Craton Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 17/7/2006 to 16/7/2011.
EL 3603, located on the Stuart Shelf approximately 50 km south of Olympic Dam, was taken under licence to explore for possible economic iron oxide - associated copper-gold-uranium (IOCG-U) deposits of Olympic Dam style that may have formed in...-
Document
Published: 28 Sep 1911
-
Yeltacowie, Hesso, Charlinga, Bowen Hill and Kangaroo Bluff (the Stuart Shelf Project). Joint annual reports and final report to licences' joint full surrender, for the period 16/8/2005 to 14/2/2014.
Uranium One Australia (U1A) acquired the Stuart Shelf Project tenements in 2005 with the aim of exploring for uranium mineralisation that has unconformity - related genetic features broadly analogous to those of deposits of the Athabasca Basin in...-
Document
Published: 28 May 1914
-
Wirramina (part of the West Roxby Project). Annual reports to licence expiry/transfer, for the period 7/3/2007 to 6/3/2012.
An area consisting of two separate sub-blocks, centred approximately 60 km west-northwest of Woomera, was taken up to explore the IOCG-U mineralisation potential of the concealed Mesoproterozoic metasedimentary cover and underlying Meso- to...-
Document
Published: 14 Apr 1912
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 1 of 2].
An area on the Stuart Shelf which is centred ~45 km north-northwest of Mount Gunson and 70 km south-east of Olympic Dam was taken up to explore primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits, perhaps of...-
Document
Published: 15 Nov 1913
-
Data release [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/1997 to 26/6/2002.
An area of the Stuart Shelf located between Pernatty Lagoon and the Beda Arm of Lake Torrens, with its western boundary lying 15 km east of the historic Mount Gunson copper mining field, is being explored for possible economic basement-hosted IOCG...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : (for 10 exploration licences comprising) the Lake Torrens JV Project. Joint annual reports for the period 1/1/2007 to 31/12/2011.
A group of ten, mainly adjoining licence areas occupying the plains surrounding the northern end of Lake Torrens, are now being jointly explored for possible economic buried Olympic Dam style IOCG related mineralisation that may have formed in the...-
Document